ML20028G976

From kanterella
Jump to navigation Jump to search
Responds to Violations Noted in Insp Repts 50-348/90-18 & 50-364/90-18.Corrective Actions:Random Testing Program Revised to Allow for Possibility for Individual to Be Selected Multiple Times within One Wk
ML20028G976
Person / Time
Site: Farley  
Issue date: 09/26/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9010050023
Download: ML20028G976 (2)


Text

-,

hY g. e.

y c

. Alabama Power Company.

+

.... M 40 inverrr:ss Center Parkw:y..

Post Office Box 1295 F *!

il

-1 Birmingham, Alabama 35201 g.

Tekphone 20$ 868 5581

_ y i D-j;n;,Ha re' ent G

September 26. 1990 s

v o

mocie.r operaien.

AlabamaPower the Southern electric Sys!ctn Docket Nos. 50-348 50-364

,r U. S.-Nuclear Regulatory Commission Attentions. Document Control Desk Vashington, D. C.220555 l

.f Joseph H. Farley Nuclear Plant

?

, Reply to Notice of Violation 90-18 01 Identified g,f Duru.g the NRC Inspection of-July 17-19, 1990 Gentlemen:

This le',ter refers to the violation which is. cited in Inspection Report Numbers j

-50 A48/90-18 and 50-364/90-18 and which states:

'o a

lv

'l "10 CFR 26.24 Chemical Testing (a)(2) requires random chemical testing be l

administered so that a person completing a test is immediately eligible for l

another unannounced test.

e Contrary to the ahve, the licensee's-random chemical testing is administered-j

.J such that asperson completing a test ir not eligible.for another unannounced 4

-test until'the'following week.-

p' Thistis a' Severity Level IV violation (Supplement VII)."

j

' Admission or Denial, j

Alabama-Power Company admits the violation occurred.

h p

Reason-for Violution l^

, Alabama Power Company misinterpreted the requirements of 10 CFR,26.24(a)(2)'

E' which reads that:

4 n

"Th'e tests must be administered so that a person completin6 a test is immedi-l

atelys eligible for anothee unannounced test. As a minimum, tests must be' gg

' administered' on ~a nomind veekly ' frequency and at various times during the. day."

j

( Alabama: Pover Company felt it had -met the " minimum" > (from the above-quotation)

.

  • h;,

i requirement of testing on e "noninal veekly frequency" (again, from the above 1

H

. quotation),) believing the second sentence quoted amplified the first sentence d.

qtio tediabovg.

i m

W d

A "o -' ' # O N.~

9010050023"906926 I

lMV' f

ADOCK 05oon34g g

,o PDC J

A.

kg

'i ? Q r

{

'l

[j ( >

l_

F Tl

  • ' N
  • L4 E

a.,

-r 1

-l 1

U. S. Nuclear Regulatory Commission 1

Reply to Notice of Violation 90-18-02 Page 2' j

s

^1 Corrective Action Taken and Results Achieved The random testing program of Alabama Power Company has been revised to allow for the possibilit/ in any given week for an individual to be selected multiple times.

Corrective' Steps Taken To. Avoid Future Violations m

See'above.

Date of Full Compliance The revised testing program was dmplemented during the week beginning September 17, 1990.

Affirmation

  • affirm that this response is true and complete ta the best of my knowledge, information and belief. The information contained in this letter is not-considered to be of a proprietary nature.

Respectfully submitted, ALABAHk POWER COMPANY

a. A. AsF :
k. G. Hairston, III VGHiedb3003 ces:

Mr.-S. D. Ebneter 4

Mr.' S. T. Hoffman i~

Mr..G. F. Maxwell.

1 i

i:

\\

z 1

i, q

..}

,lm %

,