Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1995-022, :on 950916,ABV Sys Exceeded Allowable Bypass Leakage Due to Tear in Expansion Joint Fabric.Caused by Equipment Failure.Expansion Joint Fabric Replaced + (ML18101B057)
- 05000272/LER-1995-021-01, :on 930403,both Reactor Vessel Level Indication Sys Trains Inoperable Due to Inadvertent CO2 Actuation Due to Water Intrusion.Completed RVLIS & Cabinet Sealing Repaired + (ML18101B058)
- ML18101B060 + (ML18101B060)
- ML18101B062 + (ML18101B062)
- ML18101B071 + (ML18101B071)
- IR 05000272/1995018 + (ML18101B073)
- ML18101B074 + (ML18101B074)
- ML18101B076 + (ML18101B076)
- ML18101B078 + (ML18101B078)
- ML18101B079 + (ML18101B079)
- ML18101B080 + (ML18101B080)
- 05000272/LER-1995-019, :on 950726,operability Functional Test Was Not Performed Prior to Mode Entry.Caused by Lack of Managerial Oversight & Organizational Breakdowns.Entered Tracking as for 1VC1 & 1VC2 for Mode 6 + (ML18101B081)
- 05000272/LER-1995-005, :on 950508,eight Occurrences Revealed Lift Settings of Pressurizer Code Safety Valves on Both Units Out of Required Tolerance.Caused by Testing Intrument Error. Counseled Personnel Involved + (ML18101B082)
- 05000272/LER-1995-010, :on 950615,both Units RHR Pumps Inoperable for long-term Flow Requirements Due to RHR Flow Instrument Uncertainties.Further Evaluated New EOP Setpoint for RHR Pump Operation + (ML18101B083)
- ML18101B084 + (ML18101B084)
- ML18101B086 + (ML18101B086)
- ML18101B087 + (ML18101B087)
- ML18101B088 + (ML18101B088)
- 05000311/LER-1995-004, :on 950607,EFS Actuation Occurred During Unit 2 Controlled Shutdown Per TS 3.0.3.Caused by Inadequate Mgt Oversight of Operability Determination Process.Trained All Licensed Operators + (ML18101B089)
- ML18101B090 + (ML18101B090)
- IR 05000813/2010014 + (ML18101B092)
- ML18101B093 + (ML18101B093)
- ML18101B094 + (ML18101B094)
- ML18101B098 + (ML18101B098)
- 05000272/LER-1995-025, :on 951012,identified Plant Procedures Did Not Contain Specific Instructions to Limit Sys Flow for Pump Accident Alignments.Caused by Limited Appreciation of Significance of Operating.Baseline Document Revised + (ML18101B099)
- ML18101B101 + (ML18101B101)
- ML18101B102 + (ML18101B102)
- ML18101B103 + (ML18101B103)
- ML18101B104 + (ML18101B104)
- ML18101B105 + (ML18101B105)
- ML18101B108 + (ML18101B108)
- ML18101B109 + (ML18101B109)
- IR 05000272/1995012 + (ML18101B111)
- ML18101B112 + (ML18101B112)
- ML18101B113 + (ML18101B113)
- ML18101B114 + (ML18101B114)
- 05000311/LER-1995-006, Revises Corrective Action Due Date in LER 95-006-00 to Correspond W/Due Dates in Restart Action Plan,Consisting of 960501 for Reviews & 960630 for Applicable Procedure Revs + (ML18101B115)
- ML18101B116 + (ML18101B116)
- ML18101B117 + (ML18101B117)
- ML18101B118 + (ML18101B118)
- ML18101B119 + (ML18101B119)
- ML18101B120 + (ML18101B120)
- ML18101B122 + (ML18101B122)
- 05000311/LER-1995-007-02, :on 900503,diesel Surveillance Required by TS Was Missed.Revised Process for Modifying EDG Surveillance Frequency + (ML18101B124)
- ML18101B125 + (ML18101B125)
- 05000272/LER-1995-028-01, :on 950920,effective Leakage Monitoring Program Did Not Meet TS 6.8.4a Requirements Due to Mgt/Qa Deficiency.Consolidated Program Under Single Organization to Assure Plant Design Basis Satisfied + (ML18101B126)
- ML18101B128 + (ML18101B128)
- ML18101B129 + (ML18101B129)
- ML18101B130 + (ML18101B130)
- ML18101B131 + (ML18101B131)
- ML18101B132 + (ML18101B132)