Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17318A569 + (ML17318A569)
- ML17318A570 + (ML17318A570)
- ML17318A571 + (ML17318A571)
- 05000315/LER-1979-065, Forwards LER 79-065/01T-0 + (ML17318A572)
- ML17318A574 + (ML17318A574)
- ML17318A575 + (ML17318A575)
- ML17318A576 + (ML17318A576)
- 05000316/LER-1979-054, Forwards LER 79-054/03L-0 + (ML17318A577)
- ML17318A578 + (ML17318A578)
- 05000316/LER-1979-054-03, /03L-0:on 791226,during Surveillance Test on Automatic Load Sequence Timing Relays,Four Timers Found to Exceed Tolerance.Caused by Original Setpoint Valve Value Differing from Design Value.Test Procedure Modified + (ML17318A579)
- ML17318A581 + (ML17318A581)
- ML17318A582 + (ML17318A582)
- ML17318A586 + (ML17318A586)
- ML17318A587 + (ML17318A587)
- IR 05000315/1979025 + (ML17318A589)
- ML17318A590 + (ML17318A590)
- ML17318A591 + (ML17318A591)
- ML17318A594 + (ML17318A594)
- ML17318A595 + (ML17318A595)
- PNO-III-79-056, on 791203,cleaning Subcontractor Employee Injured Foot While Cleaning Walls & Floor of Refueling Cavity.Caused by Employe Losing Grip on High Pressure Hose & Hose Nozzle Striking Foot.Wound Required Seven Stiches + (ML17318A597)
- PNO-III-79-067, on 791224,licensee Reported That Evaluations Conducted Per IE Bulletin 79-14 Revealed Containment Air Recirculation Sys Ducting Did Not Meet DBE Stress Analysis. Unit Was Shut Down for Correction + (ML17318A598)
- ML17318A600 + (ML17318A600)
- ML17318A601 + (ML17318A601)
- ML17318A603 + (ML17318A603)
- IR 05000315/1979024 + (ML17318A604)
- ML17318A605 + (ML17318A605)
- ML17318A607 + (ML17318A607)
- IR 05000315/1979026 + (ML17318A608)
- ML17318A610 + (ML17318A610)
- ML17318A612 + (ML17318A612)
- IR 05000316/1979027 + (ML17318A614)
- 05000316/LER-1980-002, Forwards LER 80-002/03L-0 + (ML17318A616)
- ML17318A617 + (ML17318A617)
- ML17318A618 + (ML17318A618)
- ML17318A620 + (ML17318A620)
- ML17318A622 + (ML17318A622)
- ML17318A623 + (ML17318A623)
- ML17318A624 + (ML17318A624)
- ML17318A625 + (ML17318A625)
- ML17318A626 + (ML17318A626)
- ML17318A627 + (ML17318A627)
- ML17318A628 + (ML17318A628)
- ML17318A629 + (ML17318A629)
- ML17318A630 + (ML17318A630)
- ML17318A632 + (ML17318A632)
- ML17318A633 + (ML17318A633)
- ML17318A634 + (ML17318A634)
- PNO-III-80-031, on 800219,while Operating at 98% Power Turbine Vibrations Were Encountered.Reactor Manually Tripped.Automatic Switchover Did Not Occur.Main Generator Breakers Remained Closed.Station Was Fed by Offsite Power + (ML17318A635)
- ML17318A636 + (ML17318A636)
- ML17318A637 + (ML17318A637)
- ML17318A638 + (ML17318A638)