Advises That Util Commitments to Follow Guidelines of Reg Guide 1.68 Have Been Fulfilled W/Completion of full-load Rejection Test & Util Reporting Test Results
ML17318A638
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/22/1980
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Dolan J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 8003200065
Download: ML17318A638 (5)


Text

fKBRUNY 2 2 Qg Docket No. 50-316 Hr. John Dolan, Vice President Indiana and Michigan Electric Company Post Office Box 18 Bowling Gr een Station New York, New-Yor k 10004

Dear Hr. Dolan:

DISTRIBUTIO Docket Fi 50-316 NRC PDR Local'PDR NCIS TERA NRR Reading ORBl Reading D. Eisenhut R. Tedesco W. Gammill A. Schwencer D. Wigginton C. Parrssh I8IE (3)

Attor ney, OELD In our*original review of the Donald C.

Cook Unit No.

2 application for an operating license, the NRC requested a commitment from the licensee to implement Regulatory Guide 1.58 on preoperational and startup testing.

In July 1977, the licensee provided this commitment in Amendment No.

77 to the FSAR.

On November 27, 1978, the Indiana and Michigan Power Company submitted an amendment to the FSAR and stated the intent to combine the load rejection and turbine trip startup tests and perform only the load rejection test on the Donald C.

Cook Unit No. 2.

A change to the Nucleal. Safety and Design Review Committee proposed in the same letter will be addressed by'a future license amendment.

On February 16, 1979, the proposal to perform only the load rejection test was further modified to propose not performing any tests but rather to rely on a number of trips that had 'already occurred at the

, plant since startup.

'In our review of these" proposals, we identified the types of information necessary to be obtained from a load rejection test and requested that you provide this information for the trips that you have proposed to rely on.

In your November 30, 1979 letter, you repori.ed that a full load rejection test had been performed on July 21, 1979 and, accordingly, withdrew your alternate proposals.

With the completion of the test and your letter to Region III on December 27, 1979 reporting the test results>

we find that you have fulfilled your commitment to follow the guidelines of'Regulatory Guide 1.68 as revised.

Sincerely, I

TAC 11506 ec:

DrrIca~

ee next page SURNAMa&

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~

DA'fa~

, ~ ~

~ v ~ ~ ~ ~ ~

DOR: ORB DWiggi.

n:jb 2/1"l/80 Origina) Signed By'.

Schwencer, Chief Operating Reactors Branch Pil Division of Operating Reactors DOR:OR ASchwe c r 2/$ /80 v

~

8 a

NRC PORM 518 (976) NRCM02v10~'O 0 OOVCNNNCN'F I'NINTINOONNICCI IO'IO 20 ~

1 ~ 0

1>

O.

gjp '

>RAUR83

~

1 I

y8 bengl8 fsngho e

~<out 1p.

+

0 Cy p1

+p*y4 Docket No.

50-316 UNITED STATES NUCLEAR R EG ULATORY'COMMISSION WASHINGTON, D. C. 20555

~fEBRUARY

- g gyp Mr. John Dolan, Vice President Indiana and Michigan Electric Company Post Office Box 18 Bowling Green Station New York, New Yor k 10004

Dear Mr. Dolan:

In our original review of the Donald C.

Cook Unit No.

2 application for an operating license, the NRC requested a commitment from the'icensee to implement Regulatory Guide 1.68 on preoperational and startup testing.

In July 1977, the licensee provided this commitment in Amendment No.

77 to the FSAR.

On November 27, 1978, the Indiana and Michigan Power Company submitted an amendment to the FSAR and stated the intent to combine the load rejection and turbine trip startup tests and perform only the load rejection test on the Donald C.

Cook Unit No.. 2.

A change to the Nuclear Safety and Design Review Committee proposed in the same letter will be addressed by a future license amendment.

On February 16, 1979, the proposal to perform only the load rejection test was further modified to propose not performing any tests but rather to rely on a

number of trips that had already occurred at the plant since startup.

In our review of these proposals, we identified the types of information necessary to be obtained from a load rejection test and requested that you provide this information for the trips that you have proposed to. rely on.

In your November 30, 1979 letter, you reported that a full load rejection test had been performed on July 21, 1979 and, accordingly, withdrew your alternate proposals.

With the completion of the test and your letter to Region III on December 27, 1979 reporting the test results, we find that you have fulfilled your commitment to follow the guidelines of Regulatory Guide 1.68 as revised.

Sincerely,

)i Fcz<~~c~c ~

A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors cc:

See next page

r

~v

I Mr. John Dolan Indiana and Michigan Electric Conipany f'EBRUARY 2 ~ iso.

cc:

Mr. Robert W. Jurgensen Chief Nuclear Engineer American Electric Power Service Corporation 2 Broadway New York, New York 10004 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D.

C.

20036 Citizens for a Better Envi ronment 59 East Van Buren Street Chicago, Illinoi s 60605 Maude Preston Pal enske Memorial Library 500 Market Street St. Joseph, Michigan 49085 Mr. D. Shaller, Plant Manager Donald C.

Cook Nuclear Plant P. 0.

Box 458

Bridgman, Michigan 49106 Mr. Robert Masse Donald C.

Cook Nuclear Plant P. 0.

Box 458 Bridgman, Michigan 49106