ML17318A582
Jump to navigation
Jump to search
| ML17318A582 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/17/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J INDIANA MICHIGAN POWER CO. |
| References | |
| NUDOCS 8001290142 | |
| Download: ML17318A582 (2) | |
Text
Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:
The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric Company Service Advice 721-162.2.
No written response to this Circular is required.
If you have any questions related to the subject, please contact this office.
Sincerely, James G. Keppler Director
Enclosures:
1.
IE Circular No. 80-01 2.
GE Service Advice 721-162.2 cc w/encls:
Mr. D. V. Shaller, Plani, Manager Central Files
- Director, NRR/DPM
- Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII Heishman/km 1/17/80 RIII K p ler s001>90
/gQ
!.~;'yly> q