ML17318A612

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/79-27 & 50-316/79-27 on 791031-1101.No Noncompliance Noted
ML17318A612
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/02/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
Shared Package
ML17318A613 List:
References
NUDOCS 8002120104
Download: ML17318A612 (3)


See also: IR 05000315/1979027

Text

1PS REPP

+~

~o

Cy

A.

J

0

C

O

~O

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R EG ION I I I

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOIS60137

Docket No. 50-315

Docket No. 50-316

Amercian Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vi'ce Chairman

Engineering

and Construction

2 Broadway

New York, NY

10004

Gentlemen:

This refers to an investigation

conducted

by Messrs.

J.

B. McCarten

and

K. D. Ward on October 31-November

1,

1979 of activities at the Donald

C.

Cook

Nuclear Plant, Units

1 and 2, authorized by NRC Operating Licenses

No. DPR-58

and No. DPR-74 after the discussion of our findings with Mr. D. V. Shaller

and

others of his staff at the conclusion of the investigation.

The enclosed

copy of our investigation report identifies areas

examined during

the investigation.

Within these

areas,

the investigation consisted

of a selec-

tive examination of procedures

and representative

records,

observations,

and

interviews with personnel.

No items of noncompliance with NRC requirements

were identified during'he

course of this investigation.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

investigation report will be placed in the NRC's Public Document

Room, except

as follows. If this report contains information that you or your contractors

believe to be proprietary,

you must apply in writing to this office,,within

twenty days of your receipt of this letter, to withhold such information from

public disclosure.

The application must include

a full statement of the reasons

for which the information is considered proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in an

enclosure

to the application.

sppsxsoi+

a

V

American Electric Power

Service Corporation

We will gladly discuss

any questions

you have concerning this

investigation.

Sincerely,

Gaston Fiorelli, Chief

Reactor Construction

and

Engineering Support Branch

Enclosure:

IE Investigation

Reports

No. 50-315/79-27

and

No. 50-316/79"27

cc/encl:

Mr. D. V. Shaller, Plant

Manager

G. Gower, Acting ZOOS

Central Files

Reproduction Unit NRC 20b

PDR

Iocal PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service

Commission

Citizens for a Better Environment

R 'III

RIII

artee/bk

No@all~

Je Ward

,v4"'2/19/79

Fiorelli

RIII

Masse