Text
h o
~me~
/~(ocerlo watweA s mtce]eAu I mrna compare DONALDC. COOK NUCLEARPLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 4654901 December 28, '1979 Operating License DPR-58 Docket 8 50-315 Mr. J. G.'Keppler, Regional Di'rector
..Office Of Inspection and Enforcement U. S. Nuclear Regulato'ry Commission Region III
. 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Hr. Keppler:
This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was inoperable from December.12, 1979 until December 24, 1979.
The Meteorological Monitoring Instrumentation was taken out-of-service on December 12, for the installation of new meteorological equipm nt, of a modified design, to improve Meteorological System operability during the win-ter months.
The completion of the nevi equipment installation was delayed by several days of adverse weather conditions, preventinq any work on the weather tower.
After completing the installation and calibration of the new equipment, the Meteorological Monitoring Instrumentation was determined to be operable on December 24. 1979.
No gaseous releases were made during this time period.
r Very.truly yours,
/ms D. V. Shaller Plant Manager cc: J.
R.
R.
R.
R.
R.
R.
C.
E. Dolan S. Hunter M. Durgensen F.,Kroeger Kilburn E. Masse RO:III C. Callen HPSC Charnoff, Esq.
G. Olson J.
H. Hennigan PNSRC J.
F. Stietzel E. L. Townley D)r., IE (20 copies)
Dir., MEPC (2 copies)
Dir. of Licensing