ML17318A575
| ML17318A575 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/17/1980 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17318A576 | List: |
| References | |
| NUDOCS 8001250478 | |
| Download: ML17318A575 (4) | |
Text
REGULATORY~MFORMATION DISTRIBUTION S EM (RIDS)
Bool8$ 97 N48WW8
/
7 N
DOCKET VAGAL:50 31S Donald C,
Cook Nuclear Power Plenty Unit ig Indiana 8
05000315 AOTH. NaME Au THoA AFFJLIATlute SAALLERiD,V.
Indjana 8 Hicliigan Electric Co<
RECP NAME REt;IPIENT AFFILIATION SUBJECT; RO:on 790107gimproper operation of meterological monitoring instrumentation from 791224 to 800107 was discoveied,Caused by transmitter leads inadvettently recersed'uring installations Disc'repancy corrected 800107
'ISTRIBUTION CODE:
A002S COPIES RECEIVEDoLTR ENCL>> j SIZEe /
TITL: Inc ent epor ts X w F
-- B cc/~
/9L-4 Wi9 T7- ~
N T E S ~ lg(spoltM~I&ee~g+M%~w weowooww&r&MQp~w~wwooww~w80%pwwl&w WWWOPSt SHRANK ACTION ~
INTERNAL:
EXTERNALt RECIPIENT Ib COOE/NAME 05 BC c5+H W C REG FILE>>
14 TA/EDO i6 EEB i8 PLANT SYS BR 20 AD PL'AAT SYS 23 ENGR BR 2S P>iR SYS BR 27 OPERA 'LZC BR 29 AUX SYS BR HANAUERgS STS GROUP LEADR 03 LPDR 29 ACRS COPIES LITH ENCL 4
1 1
2 2
ii i
i i
i i
1i 1
1i 1
i i
1 1
16 16 RECIPIENT ID"CbDE/NAME 02 NRC PDR 11 HPA 1S NOVAK/KNIEL 1.7 ab FOR ENGR 19 i8c sos UA 22 HEAC"SAF'T BR 24 KREGER 26 AD/SITE ANAL 28 ACDENT aAL'y8 E JORDAN/IE' IR(LAND 04 NSIC-COPIES LTTA"ENCL.
1 1
i i
i ii i
iii i
1 1
g5 TOTAL NUMBER OF COPIES REQUIRED'TTR ~
ENCL
p n
I vl pt n p tI p
v
~
p
~
n I
merlcen lectrlc INDIANA& MICHIGANElECTRIC COMPANY DONALDC. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, michigan 49106 (616) 465-5901 January 17, 1980 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
/
Dear Mr. Keppler:
This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was operating improperly from December 24, 1979, until January 7,
1980.
A Special Report was previously submitted on December 28, 1979, concern-ing the inoperability of the Meteorological Instrumentation while install-ing new equipment (copy attached).
The installation of the new equipment was completed on December 24, 1979.
On January 7,
1980, while experiencing 0
high winds, it was discovered that recorded wind direction was 180 from actual wind direction.
Investigation revealed that during the installation of the new Meteorolo-gical Monitoring Instrumentation, the transmitter leads were inadvertantly reversed.
This resulted in the 180 wind direction error.
The discrepancy 0
was corrected on January 7,
1980.
All wind directions were recorded between the dates of December 24,
- 1979, and January 7,
1980.
- However, the wind 0
direction data for this period was recorded 180 from actual wind direction.
Sincerely,-,
D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger R.W. Kilburn R.E.