Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17279A708 + (ML17279A708)
- IR 05000397/1987029 + (ML17279A710)
- 05000397/LER-1987-030, :on 871106,upgraded Plant Tech Spec Fire Wall Not Constructed to Qualify as 3 H Fire Barrier & Wall Penetration Not Sealed.Cause Unknown.Engineering Evaluation of Wall & Penetration Will Be Conducted + (ML17279A714)
- RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change + (ML17279A715)
- ML17279A718 + (ML17279A718)
- ML17279A720 + (ML17279A720)
- ML17279A724 + (ML17279A724)
- IR 05000397/1987028 + (ML17279A726)
- GO2-87-282, Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF87A,Spring 1987, Per NUREG-0619 Requirements + (ML17279A727)
- ML17279A728 + (ML17279A728)
- ML17279A730 + (ML17279A730)
- ML17279A732 + (ML17279A732)
- ML17279A734 + (ML17279A734)
- ML17279A735 + (ML17279A735)
- ML17279A740 + (ML17279A740)
- ML17279A742 + (ML17279A742)
- GO2-87-290, Forwards Final Response to IE Bulletin 85-003 Per .Responses to Items a Through E Have Been Changed to Reflect Addition of & Uses of Movats,Inc Test Equipment + (ML17279A743)
- GO2-87-288, Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon + (ML17279A744)
- GO2-87-289, Responds to Violation Noted in Insp Rept 50-397/86-25 Re Failure to Follow Procedures That Implemented Fire Protection Program.Special fire-rated Window Will Be Installed in Shift Manager Ofc by 880430 + (ML17279A747)
- ML17279A750 + (ML17279A750)
- ML17279A752 + (ML17279A752)
- ML17279A753 + (ML17279A753)
- GO2-87-292, Summarizes Util Concerns Re Accuracy of HVAC Flow Data That Will Become Part of Nureg/Cr on Control Room Habitability + (ML17279A754)
- GO2-87-028, Informs of Plans to Fund plant-specific Study of Sampling Sys in Spring 1989 to Evaluate Position on Iodine Plate Out + (ML17279A762)
- GO2-87-294, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-27.Corrective Actions:Overtime Control Directive Rev & Other Plant Procedures Review & Rev Planned.Full Compliance Expected by 880229 + (ML17279A763)
- ML17279A764 + (ML17279A764)
- GO2-88-001, Requests Removal of Notes Added to Pages 3/4 3-71 & 3/4 3-74 in Amend 47 to License NPF-21.During Outage,Begun on 871206, Util Repaired Acoustical Monitor.Changes Granted on Emergency Basis by Amend No Longer Necessary + (ML17279A766)
- ML17279A767 + (ML17279A767)
- GO2-87-293, Application for Amend to License NPF-21 to Implement Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Fourth Refueling Outage.Fee Paid + (ML17279A768)
- GO2-88-002, Application for Amend to License NPF-21,annotating Encl Table 3.3.2-1 to Reflect Transfer of RHR V-8 to Alternative Remote Shutdown Panel During Normal Operation & Clarifying Action a.2 on Encl Table 3.6.3-1.Fee Paid + (ML17279A769)
- ML17279A770 + (ML17279A770)
- ML17279A771 + (ML17279A771)
- GO2-88-008, Responds to Inconsistencies Noted in Introduction to SER Forwarded by Gw Knighton .Ser Addressed Fire Protection & Safe Shutdown Capability Per Amend 37 to FSAR + (ML17279A772)
- GO2-88-003, Reiterates Fundamental Design Philosophy of Spds,In Response to NRC .Design Philosophy Has Been Foundation for Compliance to NUREG-0737,Suppl 1 for Spds.Graphic Display Sys Not Same as SPDS & Never Intended to Be + (ML17279A773)
- GO2-88-007, Submits Results of Fastener Testing Program Per NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs. No Substantial Problems Found Re Use of Fastners at Facility + (ML17279A774)
- ML17279A775 + (ML17279A775)
- 05000397/LER-1987-033, :on 871218,plant Tech Spec Sections 4.0.5 Re ASME Valve in-service Testing Requirements & 3.6.3 Concerning Containment Valve Operability Not Met.Caused by Personnel Error.No Corrective Action + (ML17279A776)
- 05000397/LER-1987-032, :on 871216,RCIC Trip Sys Inoperability Discovered.Caused by Incorrect Instrument Setpoint Calculation.Surveillance Procedure for Channel Calibr of RCIC High Exhaust Pressure Switches Corrected + (ML17279A777)
- ML17279A778 + (ML17279A778)
- GO2-88-018, Responds to 880113 Telcon Requesting Addl Info Re Contract Procuring Wide Range Neutron Monitoring Sys.Continuous Monitoring & Qualification Assistance Should Ensure Gamma Metrics Diligently Pursues Qualification of Equipment + (ML17279A779)
- GO2-88-006, Submits Status Rept of Improvement Initiatives Identified in 870413 Washington Nuclear Plant-2 Fire Protection Reevaluation. Responses to NRC Questions Re Review of Amend 37 to FSAR Will Be Submitted in mid-Jan 1988 + (ML17279A781)
- GO2-88-019, Requests Extension of Response Time to 880120 for Violations Noted in Insp Rept 50-397/86-12,per 880115 Telcon + (ML17279A782)
- ML17279A783 + (ML17279A783)
- GO2-88-023, Responds to NRC Re Violations Noted in Insp Rept 50-397/86-12.Corrective Actions:Util Received Rockbestos Similarity Evaluation Which Establishes That Test of KXL-760 Matl Formulation Qualifies KXL-780 Matl + (ML17279A784)
- ML17279A785 + (ML17279A785)
- ML17279A786 + (ML17279A786)
- IR 05000397/1987030 + (ML17279A788)
- ML17279A789 + (ML17279A789)
- ML17279A791 + (ML17279A791)
- IR 05000397/1987031 + (ML17279A792)
- ML17279A793 + (ML17279A793)