ML17279A793

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1987.W/880108 Ltr
ML17279A793
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC
References
NUDOCS 8802040333
Download: ML17279A793 (9)


Text

REGULA Y INFORMATION DISTRIBUTI "YSTEM (RIDS)

ACCESSION NBR:88020e0333 DOC. DATE: 87/12/31 NOTARIZED: NO DOCKET 0 FACIL: 50-397 WPPSS Nuclear Progecti Unit 2i Washington Public Poee 050003V7 AUTH. NAME . AUTHOR AFFILIATION HUTCHISONi L. B. Washington Public Power Supply System POWERS> C. M. Washington Pub lic Power Supply System RECIP. NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept %or Dec 1987. W/880108 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR I ENCL J SIZE:

TITLE: Monthly Operating Report <per Tech Specs)

NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTHs R 0 INTERNAL: ACRS 10 10 *EOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPG/PEB 1 NRR/DOEA/EAB 1

/RPB 1 1 NRR/PMAS/ ILRB 1 1 REQ F LE 01 1 1 RQN5 1 1 EXTERNAL: EGSQ QROHz M 1 1 LPDR 1 1 NRC PDR 1 1 NSI C 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29

' ~4

) p l

OPERATING DATA REPORT WNP-2 Oi-Jan-88

i. DOCKET: SO-397 REPORTING PERIOD: Dec-87 OUTAGE ~ ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 LICENSED THERMAL POWER (MWt>: 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
b. DESIGN ELECTRICAL RATING (NET MWe>: 1100 75 MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140 8~ MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT v GIVE REASONS:
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

1 i. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 8760 26720.2
13. HOURS REACTOR CRITICAL 652.0 6199.3 19906.8
14. RX RESERVE BHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 636. 1 5981.0 19141 '
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0~0 381.7 17- GROSS THERMAL ENERGY (MWH) 1990216 16701587 50382767
18. GROSS ELECTRICAL ENERGY (MWH) 673660 5597870 16817140 1'9- NET ELECTRICAL ENERGY (MWH) 650610 5397981 161679SZ
20. UNIT SERVICE FACTOR 85.5/ 68. 3/ 71. 6/
21. UNIT AVAILABILITYFACTOR 85. 5/ 68. 3/ 73.
22. UNIT CAPACITY FACTOR <MDC NET) 79 9/

~ 3/ . 5S. 3/

1/'6.

23. UNIT CAPACITY FACTOR <DER NET) 79. 5/ 56. 0% 55. 0%

24 UNIT FORCED OUTAGE RATE 0 0/

~ 8 7/ 7-'7I%

25. FORCED OUTAGE HOURS 0.0 569. 8 1645. 1
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS <TYPE, DATE, DURATION):

RMXELIMB MMEMKF QUTABE SCHEDULEfLdl,LGl99 EQR 95.JAY'7.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

4 e, 1 I

4

AVERAGE DAILYUMT POVfER LEVEL DOCKET NP.

UNIT WNP "2 DATE 1 4 88 COMPLETED g Y LB HUTGHISON TELEPHONE MONTH DECEMBER 1 987 DAY AVERAGE DAILYPOPE ~/EL DAY AVENGE DAILYPOWER LEVEL (MWe-Net) (MVfe-Net) 1 1000 17 1039 1054 1039 1053 1090 1028 1093 1019 1098 692 1098 22 I 1099 1096 1076 1095 10 2$

1091 935 1097 528 1097 13 44 914 1090 1018 1097 1S 1033 INSTRUCTIONS On this form, list the average daily unit power level in MVe~Net for each day in the reporting month. Compute to the nearest whole megawatt.

1hese Qgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used tor the net electrical rating of the. unit, there may be occasions when. the daily average power!eiW exc ds the 1007o line (or the restricted power level line). In such cases, the average daily unit power output she.t should be footnoted to explain the apparent anomaly.

DOCKET NO. 5O 397 UNIT NAME M P-2 pnTE 1/5/88

'NIT SIIUTPOj'INS / REDUCTIONS COhfPLETEP OY LB HUTCHISON AEKAT PERIOO ~ men th, 19~

year

, TfLEPI ONE (509) 377-2486 FK finE TYK Foe.m~ HEMH ~r" 1R 87" 14 12/6/87 S 103. 8 B 1 PLANT WAS SHUTDONN FOR INSPECTION OF CONDENSATE FILTER DEMINERALIZERS, REPAIR OF CFD VALVES,.

REPLACEMENT OF RESIN STRAINERS, REPAIR OF REACT BUILDING VENTILATION SUPPLY FANS AND GORRECTION OF TURBINE SIDE STEAM LEAKS 87-15 12/13/87 S 4.1 B GENERATOR WAS REMOVED FROM SERVICE TO PERFORM TESTS TO DETERMINE EXTENT OF MECHANICAL'INDING OF'URBINE GOVERNOR VALVE 84 SUht'NllY LINP-2 INCURRED TWO SHUTDOWNS IN DECEMBER FOR SCHEDULED MAINTENANCE AND TESTING.

TYPE SYSTEM k COMPOhCNT F-Forced n-Equip Failure F-Admin 1-Manual Exhibit F h H S-Sclled 0-Maint or Test ~ 0-Oper Error 2-Manual Scram Instructions for C-Ile f'ue ling lk-Other 3-Auto Scram Preparation 0-Ilequlatory Ilestriction 4-Continued Entry Sheet ot'ata E-Operator Training 6 /educed Load Licensee Event Report h License Examination 9-Otl>er (LiER) File (NUIlEG-0161)

y ~

r r ~ ~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.o. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 January 8, 1988 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Tr ansmitted herewith is the Monthly Operating Report for December 1987 as requir ed by our Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

NNP-2 Plant Manager CMP/1 c Enclosure cc: Mr. John B. Martin NRC Region V Mr . Chris Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI, Farmington CT Mr. J.'T. Mheelock INPO Mr. Phil Ross NRC, Washington D.C.

Ogg~

QVSXGSL 9

Cev".if.%ed

0

~ ~

4 ll g

4 'Q