REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 8802010142
DOC. DATE: 88/01/15
NOTARIZED:
NO
DOCKET 0
FACIL: 50-397
WPPSS Nuclear Proyecti
Unit 2i Mashington Public Poee
05000397
AUTH. NAME
AUTHOR AFFILIATION
ZIMMERMANiR. P.
Region
Si
Ofc of the Director
RECIP. NAME
RECIPIENT AFFILIATION
SORENSENi G. C.
Mashingto'n Public Poeer
Supply System
SUBJECT:
Foreards
Insp
Rep't 50-397/87-30
on 871106-1213.
No violations
noted. Notification requested
in 30 days re actions
to be
taken concerning failure to note out-of'-spec voltage
on
safety-related
battery
charger.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
I
ENCL
l
SIZE:
TITLE:
GeneT al
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
INTERNAL:
DEDRO
NRR /DLP8/P EB
NRR/DREP/EPB
NRR/DRIS DIR
MANiJ
RGN5
FILE
01
EXTERNAL:
LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
REC IP IENT
ID CODE/NAME
SAMMORTHi R
NOR ISSEAUi D
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ILRB
OGC/HDS2
RES/DRPS
DIR
NRC
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
2
2
.1
1
1
1
1
1
1,
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
J.4N
1 5
1S88
Docket No.
50-397
Washington Public Power Supply System
P.
0.
Box 968
Richland,
99352
Attention:
Mr.
G.
C.
Sorensen
Manager of Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Mr.
C. Bosted of this office during
the period of November
6 - December
13,
1987 of activities authorized
by NRC
Operating
License
No.
and to the discussions
of findings held by the
inspector with Mr. J.
Baker and other members of the Supply System's staff at
the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel
and observations
by the inspector.
During this inspection period two events
were noted which indicated
a need for
additional attention to surveillance testing activities.
These
events
involved (1) failure to note
an out-of-specification voltage
on a safety
related battery charger during a surveillance test
and (2) erroneous
operation
of a main steam safety/relief valve due to improper installation of test
equipment.
Please
inform us within 30 days of the actions you will take to
provide additional staff attention to the proper performance of surveillance
testing activities.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget as
required by the Paperwork Reduction Act of 1980,
PL 96-511.
8802020i42 880iis
ADOCK 05000397
6
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
QF' bilYlg st 6 i LLk
R.
P.
Zimmerman, Chief
Reactor Projects
Branch
Enclosure:
Inspection Report
No. 50-397/87-30
cc w/enclosure:
A.
L. Oxsen,
WPPSS Director, Operations
R.
B. Glasscock,
WPPSS Director, Assurance
8 Licensing
C.
M. Powers,
WNP-2 Plant Manager
P.
L. Powell,
WNP-2 Licensing Manager
G.
E.
Doupe,
Esq.
N.
S.
Reynolds,
Debevois,
Cook, Purcell
8 Reynolds
State of Washington
bcc w/enclosure:
docket file
Project Inspector
Resident
Inspector
Edward Baker,
James
Conway,
G.
Cook
B. Faulkenberry
J. Martin
D. Persinko,
bcc w/o enclosure:
LFMB
M. Smith
R
V
C
d/dot
J
1
88
1
n
8
p.P-
RZimmerman
1//~88
EST
COPY ]
Q
EST
COPY ] REQUEST
Y ]
YES /
NO
ES /
NO
YES /
E
/
NO