Forwards Insp Rept 50-397/87-30 on 871106-1213.No Violations Noted.Notification Requested in 30 Days Re Actions to Be Taken Concerning Failure to Note out-of-spec Voltage on safety-related Battery Charger
ML17279A786
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/15/1988
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17279A787 List:
References
NUDOCS 8802010142
Download: ML17279A786 (4)


See also: IR 05000397/1987030

Text

A

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION

NBR: 8802010142

DOC. DATE: 88/01/15

NOTARIZED:

NO

DOCKET 0

FACIL: 50-397

WPPSS Nuclear Proyecti

Unit 2i Mashington Public Poee

05000397

AUTH. NAME

AUTHOR AFFILIATION

ZIMMERMANiR. P.

Region

Si

Ofc of the Director

RECIP. NAME

RECIPIENT AFFILIATION

SORENSENi G. C.

Mashingto'n Public Poeer

Supply System

SUBJECT:

Foreards

Insp

Rep't 50-397/87-30

on 871106-1213.

No violations

noted. Notification requested

in 30 days re actions

to be

taken concerning failure to note out-of'-spec voltage

on

safety-related

battery

charger.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

I

ENCL

l

SIZE:

TITLE:

GeneT al

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PDS

PD

INTERNAL:

ACRS

DEDRO

NRR /DLP8/P EB

NRR/DREP/EPB

NRR/DRIS DIR

MANiJ

RGN5

FILE

01

EXTERNAL:

LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

REC IP IENT

ID CODE/NAME

SAMMORTHi R

AEOD

NRR

NOR ISSEAUi D

NRR/DOEA DIR

NRR/DREP/RPB

NRR/PMAS/ILRB

OGC/HDS2

RES/DRPS

DIR

NRC

PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

2

2

.1

1

1

1

1

1

1,

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

J.4N

1 5

1S88

Docket No.

50-397

Washington Public Power Supply System

P.

0.

Box 968

Richland,

Washington

99352

Attention:

Mr.

G.

C.

Sorensen

Manager of Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Mr.

C. Bosted of this office during

the period of November

6 - December

13,

1987 of activities authorized

by NRC

Operating

License

No.

NPF-21,

and to the discussions

of findings held by the

inspector with Mr. J.

Baker and other members of the Supply System's staff at

the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel

and observations

by the inspector.

During this inspection period two events

were noted which indicated

a need for

additional attention to surveillance testing activities.

These

events

involved (1) failure to note

an out-of-specification voltage

on a safety

related battery charger during a surveillance test

and (2) erroneous

operation

of a main steam safety/relief valve due to improper installation of test

equipment.

Please

inform us within 30 days of the actions you will take to

provide additional staff attention to the proper performance of surveillance

testing activities.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget as

required by the Paperwork Reduction Act of 1980,

PL 96-511.

8802020i42 880iis

PDR

ADOCK 05000397

6

PDR

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

QF' bilYlg st 6 i LLk

R.

P.

Zimmerman, Chief

Reactor Projects

Branch

Enclosure:

Inspection Report

No. 50-397/87-30

cc w/enclosure:

A.

L. Oxsen,

WPPSS Director, Operations

R.

B. Glasscock,

WPPSS Director, Assurance

8 Licensing

C.

M. Powers,

WNP-2 Plant Manager

P.

L. Powell,

WNP-2 Licensing Manager

G.

E.

Doupe,

Esq.

N.

S.

Reynolds,

Debevois,

Cook, Purcell

8 Reynolds

State of Washington

bcc w/enclosure:

docket file

Project Inspector

Resident

Inspector

Edward Baker,

NRR

James

Conway,

NRR

G.

Cook

B. Faulkenberry

J. Martin

D. Persinko,

NRR

bcc w/o enclosure:

LFMB

M. Smith

R

V

C

d/dot

J

1

88

1

n

8

p.P-

RZimmerman

1//~88

EQ

EST

COPY ]

Q

EST

COPY ] REQUEST

Y ]

YES /

NO

ES /

NO

YES /

E

/

NO