ACCELERATED DlltRIBUTION DEMONSZKTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I
~ I ACCESSION NBR:8801040529 DOC.DATE: 87/11/30 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME
'UTHOR AFFILIATION HUTCHISON,L.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
SUBJECT:
Monthly operating rept for Nov 1987.W/871208 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR J ENCL I SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES D
RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R COPIES LTTR ENCL 1
0 1
0 RECIPIENT
'OPIES"K ID CODE/NAME LTTR'ENCL'"
PD5 PD 5
5 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PE B NRR/DREP/
E~
01 EXTERNAL: DOE NE32 FULNER NRC PDR 1'0 10 1
1 1
1 1
1 1
1 1
1 1
1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB NRR/PMAS/ILRB RGN5 LPDR NSIC 1
1 2
2 1
1 1
1 1
1 1
1 1
1 D
t.
K R,'
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 31 ENCL 29
II II fi I'
I'
OPERATINB DATA REPORT WNP-2 01-Dec-87 1.
DOCKET: 50-397 2 ~
REPORTING PERIOD:
3 ~
UTILITY CONTACT:
Nav-87 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486
, 720 4.
LICENSED THERMAL POWER (MWt.>".
5.
NAMEPLATE RATING (GROSS MWe):
h.
DESIGN ELECTRICAL RATING (NET MWe>:
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
3323 1200. 9 1100 1140 1095 10.
POWER TQ WHICH RESTRICTED, IF ANY (NET MWe):
ii REASONS FOR RESTRICTIONS s IF ANY".
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE ib-UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET El ECTRICAL ENERGY (MWH) 20 UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET>
24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 720 720.0 0 ~ 0 720. 0 0.0 2229600 750590 724151 100.0/
100.0/
- 91. 9/
- 91. 4/
- 0. OX 0.0 YEAR CUMULATIVE BOih 25976.2 5547.4 19254 '
- 0. 0 340. 4 5344. 9 18505. 8 0 0 381.7 14711371 48392551 4924210 16143480 4747371 15517342
- 66. 7%
- 71. 2/
- 66. 7X
- 72. 7/
- 54. 1%
- 54. 6X
- 53. 8/
54 ~ 3X
- 9. 6X
- 8. 2X 569. 8 1645.
1 26.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE,DURATION):
SCHEDULED MAINTENANCE OUTAGE DECEMBER 6 THROUGH+
REFUELING MAINTENANCE OUTAGE SCHEDULED FOR $ 5 Dggg QQ~ggg~ ~QQ.
27.
IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
'8801040529."871130 PDR
,ADOCK, 05000397
.R.......-,...,DCI>-'~
Y'/
1d l
AVERAGEDAILYUNITPOVfER LEVEL DOCKET NO.
HNP-2 DATE 12/1/87 LB Hutchison YZU'-PEON! LK NOVEMBER 1987 M
DAY AVERAGEDAILYPOVfER LEVEL (MNe-Net) 1 996 DAY AVERAGEDAILYPOWER LEVEL (i~e-Net) 1l 1046 10 12 13 44 1051 1052 1054 975
'1032 1056 1036 564 927 970 974 1024 1011 1063 1063 18
'9 31 982 1064*
1066 1065 939 908 1047 1056 1014 975 1065 1063 1035 INSTRUCTIONS Qn this form, list the average daily unit power level in MWe~Vet for each day in the reoorting month. Compute to the nearest whole megawatt.
'lhese Qgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity h used for the net electrical rating of the unit, there may be occasions when. the daily average power level exc=ds the 100~o line {or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
,)
I I',
LNIT SI fUTDOf'fNS / AEDUCTIONS
~.
DOCKET HO.
UNIT NifE DllTE 12/1/87 COMPLETED BY LB Hutchi son AEPCAT PEAIOD HOV 1987
- mcnth, year BG.
~n tcvf lV>T<K FE.NOH KTI1iB 87-13P 11-9-87 S
0 H
5 TELEPlfONE (509)377-2486 IZtlK WIN ~l m r RB COHROD REDUCED POWER TO PERFORM A SCHEDULED CONTROL ROD SEQUENCE EXCHANGE SUhffAAY WNP"2 INCURRED OHE SCHEDULED POWER REDUCTION IN NOVEMBER AS DISCUSSED ABOVE.
'U TYPE F-Forced S-Scl>ed ll-Equip Failure f3-Maint or Test
~
C-Aefue) > ng D-Aegula tory Des triction E-Operator Trafning h License Examination F-i(dmin 0-Oper Error H-Other METff00 1-Manual 2-hfanual Screo 3-lh>to Scram 4-Continued 5-f)educed Load 9-Otf>er SYSTEM k COhfPOhCNT Exhibit F h H Instructions for Preparation ol'ata Entry Sheet Licensee Event Report (LER) File (NUftEG-0161)
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 9935Z Docket No. 50-397 December 8,
1987 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C.
20555
Dear Sir:
SUBJECT:
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for November 1987 as required by our Technical Specifications 6.9.1.6.
Very Truly Yours, C.
M. Powers (M/D 927M)
MNP-2 Plant Manager CMP/lc Encl osur e cc: Mr.
Mr.
Ms.
Mr.
Mr.
John B. Martin Chris Bosted Dottie Sherman J. T. Mheelock Phil Ross NRC Region V
NRC Site Representative (901A)
ANI, Farmington CT INPO NRC, Washington D.C.
0
'v w
$J "CgP;
~ ~g "sl