Other: GO2-86-104, Forwards Addl Info Re Fire Protection Program,Per 861020 Request,Including Rev 2 to Emergency Procedure 5.3.6, Reactor Pressure Vessel Flooding (Contingency), GO2-86-310, Forwards Advance Copy of Update of App F Re Fire Protection Evaluation for Facility Fsar.Update Will Be Formally Submitted as Amend 37,currently Scheduled for Issue in June 1986, GO2-86-656, Responds to 860314 SER Implying That App R Analysis Requirements Performed for high-pressure-to-low-pressure Sys Interfaces Must Assume That Two Spurious Actuations Occur Simultaneously.Position Contrary to Generic Ltrs, GO2-87-019, Forwards Info Re Mods Proposed to Ensure Isolation of RHR-V-8 or RHR-V-9 Valve & Schedule for Completion of Mods, Per 870513 Request Re Generic Ltr 86-10 Interpretation of High/Low Pressure Interface Concerns, GO2-87-034, Forwards Fire Protection Program Description in Response to 870113-15 Fire Protection Insp to Facilitate Implementation of License Condition 2.C(14), GO2-87-179, Forwards Response to Unresolved Items Noted in Insp Rept 50-397/87-02.Corrective Actions:Independent Insp by Consultants Confirmed That Detection Sys Meets Requirements for safety-related Areas, GO2-87-232, Responds to Generic Ltr 86-10.Util Determined That Providing Transfer Switch on Remote Shutdown Panel for RHR-V-8 Valve Preferred Method for Ensuring Isolation of Either RHR-V-8 or V-9 in Event of Control Room Fire, GO2-88-008, Responds to Inconsistencies Noted in Introduction to SER Forwarded by Gw Knighton .Ser Addressed Fire Protection & Safe Shutdown Capability Per Amend 37 to FSAR, GO2-88-111, Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513, GO2-88-136, Informs That Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Rescheduled for Completion from 880515 to 880715 Due to Unavailability of Supporting Resources, GO2-88-155, Forwards Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Re Fire Protection & Safe Shutdown Capability Response to SER, GO2-88-156, Provides Schedule for Completion of Fire Protection Issues from Insp Rept 50-397/88-16.Installation of Scuppers on South Doors Leading Outside Diesel Generator Bldg Will Be Completed by 880801, GO2-88-157, Forwards Completed Executive Summary of App R High Impedance Fault Analysis,Per NRC 880606 Request, GO2-88-168, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-19.Corrective Actions:Instrument Rack Termination Procedure PPM 10.25.19 Will Be Revised by 890315 to Include Examples of Acceptable Crimp Configuration, GO2-88-209, Submits Revised Response to SER Question 25 Re Fire Protection & Safe Shutdown Capability.Analysis Performed to Identify high-to-low Pressure Interface Valve Motor Power Feeder Requiring Protection Against Fire Related Reconnects, GO2-88-214, Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-10, GO2-88-222, Submits Revised Response to Insp Rept 50-397/88-16 Re Fire Protection & Safe Shutdown Capability.Fire in Drywell Expansion Gap Has Very Low Probability of Starting, GO2-89-035, Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417, ML17278B122, ML17278B182, ML17279A257, ML17279A778
|
MONTHYEARGO2-86-310, Forwards Advance Copy of Update of App F Re Fire Protection Evaluation for Facility Fsar.Update Will Be Formally Submitted as Amend 37,currently Scheduled for Issue in June 19861986-04-0404 April 1986 Forwards Advance Copy of Update of App F Re Fire Protection Evaluation for Facility Fsar.Update Will Be Formally Submitted as Amend 37,currently Scheduled for Issue in June 1986 Project stage: Other GO2-86-656, Responds to 860314 SER Implying That App R Analysis Requirements Performed for high-pressure-to-low-pressure Sys Interfaces Must Assume That Two Spurious Actuations Occur Simultaneously.Position Contrary to Generic Ltrs1986-07-16016 July 1986 Responds to 860314 SER Implying That App R Analysis Requirements Performed for high-pressure-to-low-pressure Sys Interfaces Must Assume That Two Spurious Actuations Occur Simultaneously.Position Contrary to Generic Ltrs Project stage: Other ML17278B0471986-10-20020 October 1986 Forwards Request for Addl Info Re Current Condition of Unit 2 Compared to Regulations,License & Commitments to Fire Protection Program.Requests Response within 30 Days of Ltr Receipt Project stage: RAI ML17278B0461986-10-21021 October 1986 Discusses 861002 Meeting W/Ofc of General Counsel & Plant Sys Branch Re Plant Approved Fire Protection Program.Meeting Concluded That Program Includes Written Communications Docketed Prior to Issuing OL Project stage: Meeting ML17278B1221986-11-17017 November 1986 Rev 2 to Emergency Procedure 5.3.6, Reactor Pressure Vessel Flooding (Contingency) Project stage: Other GO2-86-104, Forwards Addl Info Re Fire Protection Program,Per 861020 Request,Including Rev 2 to Emergency Procedure 5.3.6, Reactor Pressure Vessel Flooding (Contingency)1986-12-0101 December 1986 Forwards Addl Info Re Fire Protection Program,Per 861020 Request,Including Rev 2 to Emergency Procedure 5.3.6, Reactor Pressure Vessel Flooding (Contingency) Project stage: Other GO2-87-034, Forwards Fire Protection Program Description in Response to 870113-15 Fire Protection Insp to Facilitate Implementation of License Condition 2.C(14)1987-01-29029 January 1987 Forwards Fire Protection Program Description in Response to 870113-15 Fire Protection Insp to Facilitate Implementation of License Condition 2.C(14) Project stage: Other ML17278B1821987-02-0505 February 1987 Informs That Attachment to Will Be Considered Approved Fire Protection Program.Approval of Program Contingent on Timely Submittal of License Amend Request Per Generic Ltr 86-10 Project stage: Other ML17279A2571987-05-13013 May 1987 Advises That Util Required to Implement Appropriate Mods to Isolation Valves RHR-V-8 & RHR-V-9 to Meet Objectives of App R to 10CFR50 Re Prevention of LOCAs at High/Low Pressure Interfaces.Submittal of Schedule Requested Project stage: Other GO2-87-179, Forwards Response to Unresolved Items Noted in Insp Rept 50-397/87-02.Corrective Actions:Independent Insp by Consultants Confirmed That Detection Sys Meets Requirements for safety-related Areas1987-05-27027 May 1987 Forwards Response to Unresolved Items Noted in Insp Rept 50-397/87-02.Corrective Actions:Independent Insp by Consultants Confirmed That Detection Sys Meets Requirements for safety-related Areas Project stage: Other GO2-87-019, Forwards Info Re Mods Proposed to Ensure Isolation of RHR-V-8 or RHR-V-9 Valve & Schedule for Completion of Mods, Per 870513 Request Re Generic Ltr 86-10 Interpretation of High/Low Pressure Interface Concerns1987-06-0303 June 1987 Forwards Info Re Mods Proposed to Ensure Isolation of RHR-V-8 or RHR-V-9 Valve & Schedule for Completion of Mods, Per 870513 Request Re Generic Ltr 86-10 Interpretation of High/Low Pressure Interface Concerns Project stage: Other GO2-87-232, Responds to Generic Ltr 86-10.Util Determined That Providing Transfer Switch on Remote Shutdown Panel for RHR-V-8 Valve Preferred Method for Ensuring Isolation of Either RHR-V-8 or V-9 in Event of Control Room Fire1987-08-20020 August 1987 Responds to Generic Ltr 86-10.Util Determined That Providing Transfer Switch on Remote Shutdown Panel for RHR-V-8 Valve Preferred Method for Ensuring Isolation of Either RHR-V-8 or V-9 in Event of Control Room Fire Project stage: Other ML17279A5771987-10-0202 October 1987 Recommends That Meeting Be Held to Ensure Completion of Mods to Preclude Spurious Opening of High Low Interface Valves in Event of Control Room Fire,Per NRC 870513 Request & Util 870820 Response Project stage: Meeting ML20236N1261987-11-11011 November 1987 Safety Evaluation Supporting Amend 37 to FSAR Re Fire Protection Program Project stage: Approval ML17279A7781987-12-23023 December 1987 Discusses 871002 Response to Re Util Preferred Course of Action for Precluding Spurious Opening of high-low Interface Valves RHR-V 8 & RHR-V-9 in Event of Control Room Fire.No Submittal on Subj Received to Date Project stage: Other GO2-88-008, Responds to Inconsistencies Noted in Introduction to SER Forwarded by Gw Knighton .Ser Addressed Fire Protection & Safe Shutdown Capability Per Amend 37 to FSAR1988-01-11011 January 1988 Responds to Inconsistencies Noted in Introduction to SER Forwarded by Gw Knighton .Ser Addressed Fire Protection & Safe Shutdown Capability Per Amend 37 to FSAR Project stage: Other ML17279A7751988-01-13013 January 1988 Notification of 880119 Meeting W/Util in Bethesda,Md to Discuss Fire Protection Plan & Util Responses to NRC Comments on Plan Project stage: Meeting ML17279A8881988-03-0909 March 1988 Summary of 880119 Meeting W/Util in Bethesda,Md Re Util Responses to 28 Fire Protection Questions Raised in NRC .Attendee List Encl Project stage: Meeting GO2-88-111, Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 8805131988-05-0606 May 1988 Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513 Project stage: Other GO2-88-136, Informs That Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Rescheduled for Completion from 880515 to 880715 Due to Unavailability of Supporting Resources1988-06-0303 June 1988 Informs That Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Rescheduled for Completion from 880515 to 880715 Due to Unavailability of Supporting Resources Project stage: Other GO2-88-155, Forwards Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Re Fire Protection & Safe Shutdown Capability Response to SER1988-07-15015 July 1988 Forwards Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Re Fire Protection & Safe Shutdown Capability Response to SER Project stage: Other GO2-88-157, Forwards Completed Executive Summary of App R High Impedance Fault Analysis,Per NRC 880606 Request1988-07-15015 July 1988 Forwards Completed Executive Summary of App R High Impedance Fault Analysis,Per NRC 880606 Request Project stage: Other GO2-88-156, Provides Schedule for Completion of Fire Protection Issues from Insp Rept 50-397/88-16.Installation of Scuppers on South Doors Leading Outside Diesel Generator Bldg Will Be Completed by 8808011988-07-15015 July 1988 Provides Schedule for Completion of Fire Protection Issues from Insp Rept 50-397/88-16.Installation of Scuppers on South Doors Leading Outside Diesel Generator Bldg Will Be Completed by 880801 Project stage: Other GO2-88-163, Submits Clarification of Approved Fire Protection Program Per 880610 Exit Meeting,Covering Plant Design,Door Openings, Fire Barriers,Fire Dampers & Doors & Safe Shutdown Capability1988-07-26026 July 1988 Submits Clarification of Approved Fire Protection Program Per 880610 Exit Meeting,Covering Plant Design,Door Openings, Fire Barriers,Fire Dampers & Doors & Safe Shutdown Capability Project stage: Meeting GO2-88-168, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-19.Corrective Actions:Instrument Rack Termination Procedure PPM 10.25.19 Will Be Revised by 890315 to Include Examples of Acceptable Crimp Configuration1988-07-29029 July 1988 Responds to NRC Re Violations Noted in Insp Rept 50-397/88-19.Corrective Actions:Instrument Rack Termination Procedure PPM 10.25.19 Will Be Revised by 890315 to Include Examples of Acceptable Crimp Configuration Project stage: Other GO2-88-209, Submits Revised Response to SER Question 25 Re Fire Protection & Safe Shutdown Capability.Analysis Performed to Identify high-to-low Pressure Interface Valve Motor Power Feeder Requiring Protection Against Fire Related Reconnects1988-09-30030 September 1988 Submits Revised Response to SER Question 25 Re Fire Protection & Safe Shutdown Capability.Analysis Performed to Identify high-to-low Pressure Interface Valve Motor Power Feeder Requiring Protection Against Fire Related Reconnects Project stage: Other GO2-88-214, Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-101988-10-0707 October 1988 Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-10 Project stage: Other GO2-88-222, Submits Revised Response to Insp Rept 50-397/88-16 Re Fire Protection & Safe Shutdown Capability.Fire in Drywell Expansion Gap Has Very Low Probability of Starting1988-10-28028 October 1988 Submits Revised Response to Insp Rept 50-397/88-16 Re Fire Protection & Safe Shutdown Capability.Fire in Drywell Expansion Gap Has Very Low Probability of Starting Project stage: Other GO2-88-250, Clarifies Min Staffing Needed for Safe Shutdown Re Insp Rept 50-397/88-16 Dtd 880725.Util Understands That Any Combination of Personnel Meeting 10CFR50,App R Requirements Acceptable1988-11-28028 November 1988 Clarifies Min Staffing Needed for Safe Shutdown Re Insp Rept 50-397/88-16 Dtd 880725.Util Understands That Any Combination of Personnel Meeting 10CFR50,App R Requirements Acceptable Project stage: Meeting GO2-89-035, Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 8904171989-03-0606 March 1989 Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417 Project stage: Other 1987-06-03
[Table View] |
Text
Docket No. 50-397
"-- UNITEDSTATES NUCLEAR REGULATORYCOMMISSION WASHINGTON,D. C. 20555 December 23, 1987 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
Subject:
NRC REVIEW AND APPROVAL OF RHR-V-8/RHR-V-9 RESOLUTION (TAC f 63528)
On October 2, 1987 I wrote to you responding to your August 20, 1987 letter in which you had identified WPPSS's preferred course of action for precluding spurious opening of high-low interface valves RHR-V-8 and RHR-V-9 in the event of a control room fire.
In my response to you I pointed out that the NRC staff has reservations about your preferred action.
I encouraged you to submit your proposal in a timely manner so that WPPSS might have time to implement an alternative action during the next refueling outage should NRC indeed deny your preferred action.
It is my understanding that you would like to resolve this issue to our satisfaction without impacting on the schedule for restart following the upcoming refueling outage.
We have been advised informally that you are still pursuing implementation of the action which you identified as preferred in your August 20 letter.
However to date we have not received proposed amendments to the FSAR or the Technical Specifications which would permit us to begin our safety review of your proposal.
In acknowledgement of the importance of this issue, I remind you that in my letter to you dated May 13, 1987 we had expressed a need to resolve this matter prior to the end of the 1987 refueling outage.
Your reply of June 3, 1987 informed us of procedures which you would follow to ensure that resolution would be achieved prior to startup from the spring 1988 refueling outage.
In August I brought my licensing assistant and licensing project mahager to the WNP-2 site to explain our licensing procedures to the WPPSS staff and to impart an appreciation of the time requirements inherent in NRC review procedures.
BS0126028i 87i223 V PDR ADOCK 05000397, F
PDR'
4
,t
'-'..... ~w'>s' e',<
'4 4
X ~
l1r. G.
C. Sorensen, Manager Since no submittal on the subject has been received to date, I must conclude that you fully understand that an untimely filing of a potentially flawed proposal for NRC consideration could seriously impact restart after refueling.
Sincerely, original signed by George ll. Knighton, Director Project Directorate V
Division of Reactor Projects - III, IV, V,and Special Projects Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
NRC 5 Local PDRs PDV Reading DCrutchfield GHolahan JLee RSamwor th OGC-Bethesda EJordan JPartlow ACRS (10) lJNP-2 Plant DRSP/PDV DRS DV RSamworth G'l ton 12/fg/87 12/)/87 OFFICIAL RECORD COPY
0
)
I II
~'f II K
N
Nr. 8. C. Sorensen, Nanager Nashfmton P blfc P'~r Supply Systm MPPSS Nuclear Prospect No. 2 (WNP-2)
CC.
Nicholas S. Reynolds, Esq.
Bfshop, Cook, Purcell h Reynolds 1200 Seventeenth
- Street, N.W.
Washington, D.C.
20036
<<. 6-E- Doupe. Esqufre Washfngton Public Power Supply System P. 0. Box 968 3000 George Washfngton Way Richland, Washington 99532 Hr. Curtfs Eschels Chairman Ennergy Facility Site Evaluatfon Council Hail Stop PY-11
- 01ympia, Washf ngton 98504 P. L. Powell, Lfcensfng Hanager Washington Public Power Supply System P. 0.
Box 968, HD 956B
- Richland, Washington 99352 Hr. A. Lee Oxsen Assistant Hanapfng Director for Operations Washington Public Power Supply System P. 0.
Box 968, HD 1023
- Richland, WA 99352 R. B. Glasscock, Director Lfcensing and Assurance Washington Public Power Supply System P. 0.
Box 968, HD 280
- Richland, Washington 99352 Hr. C. H. Powers WNP-2 Plant Hanager Washington Public Power Supply System P.,O.
Bok HD 927H
- Rich1and, Washfngton 99352 Regional Admfnfstrator, Regfon Y
U.S. Nuclear Regulatory Coamfssfon 1450 Harfa Lane, Sufte 210 Walnut Creek, California 94596 Chaf rman Benton County Board of Coaefssfoners
- Prosser, Washington 99350
~ ~
k