Amend 49 to License NPF-21,revising Tech Spec 6.4.1 & Figures 6.2.2-1a & 6.2.2-1b to Reflect Organizational & Adminstrative Changes
ML17279A750
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/24/1987
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17279A751 List:
References
NUDOCS 8801040301
Download: ML17279A750 (8)


Text

~ ~p,8 4Egy P0 I'y

~c n

C 0

Cy

+)t *++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 49 License No. NPF-21 1.

The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee),

dated September 27, 1985 and supplemented by letters dated November 6, 1985 and September 17, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth fn 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the enclosure to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-21 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 49, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

jgoj64030l 87<Q~q7 PDR

@DOCK 05 pDR g p

3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION George'.

Knighton irector Project Directora e

V Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

Changes to the Technical Specifications Date of Issuance:

December 24, 1987

~ e

December 24, 1987 ENCLOSURE TO LICENSE AMENDMENT NO.

49 FACILITY OPERATING LICENSE NO. NPF-21 DOCKET HO. 50-397 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

REMOVE INSERT 6-4 6-5 6-8 6-4 6-5 6-8

WNP.2 PLANT MANAGER ASSISTANT PLANT MANAGER NUCLEAR SAFETY ASSURANCE MANAGER PLANT SECURITY SUPERVISOR TECHNICALTRAIHINO MANAGER SECURITY FORCES PLANT OUAUTY ASSURANCE MANAGER IHDUSTNALSAFETY AND FSIK PROTECTION MANAGER TECHNICALTRAININO COORDINATOR TECHNCAL MANAGER HP/CHKIGSTRY MANAGER ADMSRSTRATION MANAGBI OPERATIONS MANAGER (SRO)

MADITEHANCE MANAGER PIANIRNO S SCHEDUUNG SUPERVISOR PLANT EHGSIEKRSIO SUPERVISOR (REACTOR SYSTEMS)

HEALTHPHYSICS SUPPORT SUPERVISOR ASSISTANT OPERATIONS MANAGER (SRO)

MECHANCAL SUPERVISOR PLANT ENGSIKEINIG SUPERVISOR (CONTROL SYSTEMS)

CHEMISTRY SUPPORT SUPERVISOR ELKCTRICAL SUPERVISOR PLANT ENGINKERWO SUPERVISOR (MECHANCALSYSTEMS)

PLANT E NGSIEERSIO SUPERVISOR (ELKCTNCALSYSTEMS)

HP SUPERVISOR CHEMISTRY SUPBlVISOR TECHNICALTRAININO COORDUIATOR UISTRUMENT SUPERVISOR MASITEHANCK SERVICES SUPERVISOR LEGEND I

L TECHNICALTRAIISHO COORDKIATOR NRC UCENSE POSITION REONRED (SRO)

AO STIIAYIVCNIOBIIICINALIIKPCNITND

~~~ LSIKOFCOMMUNCATION FIGURE 6.2.2-1 a UNIT ORGANIZATION

+ MANAGERSHALLASSIGN FUNCTION OF TRAINDIG COORDINATION TO AN PIDIVIDUALWHO WILLCOORDINATE DEPARTMENT TRAININGWITHTHKTECHNICALTRAINVIG MANAGER.

(PART TIME)

OPERATIONS MANAGER (SRO)

ASSISTANT OPERATIONS MANAGER (SRO)

TECHNICALTRAINING MANAGER (SRO)

SHIFT MANAGERS SHIFT TECHNICAL ADVISORS""

SECURITY FORCES""'

TO BE PROVIDED AS NEEDED

'ROM A POOL OF EQUIPMENT OPERATORS

" TO BE PROVIDED FROM MAIN-TENANCE DEPARTMENT

"'O BE PROVIDED FROM HP/CHEM DEPARTMENT

'"'O BE PROVIDED FROM THE TECHNICALDEPARTMENT AS REQUIRED CONTROL ROOM SUPERVISOR (SRO)

REACTOR OPERATORS (RO)

EQUIPMENT OPERATORS SHIFT SUPPORT SUPERVISOR EQUIPMENT OPERATORS'P/CHEMISTRY TECHNICIANS"'

MANAGERSHALLASSIGN FUNCTION TRAININGCOORDINATIONTO AN INDIVIDUALWHO WILLCOORDINATE DEPARTMENT TRAININGWITH THE TECHNICALTRAININGMANAGER (PART TIME)

LEGEND FONOTIOIIALREPEATING LINE OF COMMUNICATION

""'EESECURITY FOR TOTAL SECURITY FORCE STAFFING LFVEL ISO TECHNICIANS" MAINTENANCE ~ ~

SUPPORT NRC LICENSE REQUIRED POSITION SRO/RO FIGURE 6.2.2-1 b UNIT ORGANIZATIONOPERATIONS DEPARTMENT

. AOMINISTRATIVE CONTROLS 6.4 TRAINING 6.4. 1 A retraining and replacement training program for the unit staff shall be maintained to meet or exceed the requirements and recommendations of Sec-tion 5.5 of ANSI/ANS N18.1-1971 and Appendix A of 10 CFR Part 55 and the supple-mental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, and shall include familiarization with rele-vant industry operational experience.

6.5 REVIEW AND AUOIT

6. 5.1 PLANT OPERATIONS COMMITTEE (POC)

FUNCTION 6.5.1. 1 The POC shall function to advise the Plant Manager on all matters related-to nuclear safety.

COMPOSITION 6.5.1.2 The POC shall be composed of the:

Chairman:

Vice Chairman:

Member:

Member:

Member:

Member:

Member:

Member:

ALTERNATES Plant Manager Assistant Plant Manager Operations Manager Technical Manager Maintenance Manager Administrative Manager Plant gA Manager Health Physics/Chemistry Manager 6.5. 1.3 All alternate members shall be appointed in writing by the POC Chairman or Vice Chairman to serve on a temporary basis.

MEETING FRE UENCY 6.5.1.4 The Plant Operations Committee shall meet at least once per calendar month and as convened by the POC Chairman or his designated alternate.

QUORUM 6.5.1.5 The quorum of the POC necessary for the performance of the POC responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or Vice Chairman and four members including alternates.

No more than two alternates shall make up the quorum.

WASHINGTON NUCLEAR " UNIT 2 6-8 Amendment No. 49