- ML17275A458 + (ML17275A458)
- ML17275A459 + (ML17275A459)
- ML17275A462 + (ML17275A462)
- CNL-17-126, Description of Changes in Revision 2 of the Cyber Security Plan + (ML17275A463)
- ML17275A466 + (ML17275A466)
- GO2-80-161, Interim Deficiency Rept Re Gaps & Voids in Sacrificial Shield Wall.Corrective Action Plan Described in . Implementation Is Pending NRC Concurrence + (ML17275A471)
- GO2-80-145, Forwards Status of Flued Head Containment Penetration Welds in Response to IE Bulletin 80-08.Work on Flued Heads Covered by ASME Code.Completed Welds Examined Radiographically. Defects Re Incomplete Fusion & Surface Porosity Repaired + (ML17275A477)
- GO2-80-149, Responds to Round One Questions,Set 9,Questions 211.049 - 311.106 + (ML17275A496)
- ML17275A500 + (ML17275A500)
- GO2-80-151, Answers Notice of Proposed Imposition of Civil Penalties Dtd 800617.Majority of Findings Reflect Deficiencies Found by Contractor,Util & NRC Region 5.Encl Exhibit a Details Protests Against Imposition of Certain Proposed Penalties + (ML17275A503)
- ML17275A506 + (ML17275A506)
- GO2-80-167, Forwards Engineering Evaluation of Unit 2 Sacrificial Shield Wall + (ML17275A512)
- ML17275A513 + (ML17275A513)
- ML17275A514 + (ML17275A514)
- ML17275A518 + (ML17275A518)
- ML17275A519 + (ML17275A519)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 + (ML17275A520)
- ML17275A521 + (ML17275A521)
- ML17275A522 + (ML17275A522)
- ML17275A523 + (ML17275A523)
- ML17275A528 + (ML17275A528)
- ML17275A529 + (ML17275A529)
- ML17275A531 + (ML17275A531)
- ML17275A533 + (ML17275A533)
- ML17275A534 + (ML17275A534)
- ML17275A535 + (ML17275A535)
- ML17275A537 + (ML17275A537)
- ML17275A538 + (ML17275A538)
- GO2-80-182, Forwards Suppl 1 to Engineering Evaluation of WPPSS Unit 2 Sacrificial Shield Wall, in Response to Open Items Required for NRC Approval of Proposed Replacement Weld in Sacrificial Shield Wall.Affidavit Encl + (ML17275A540)
- ML17275A541 + (ML17275A541)
- ML17275A542 + (ML17275A542)
- ML17275A543 + (ML17275A543)
- ML17275A544 + (ML17275A544)
- GO2-80-184, Deficiency Rept Re Possible Inoperability of Borg-Warner Valves W/Limitorque Series Smc Operators.Identified Valves Will Be Reworked by Thread Staking Procedure.Schedule to Be Provided After Labor Negotiations + (ML17275A545)
- GO2-80-185, Deficiency Rept Re Battery Charger Capacitor Failure. Condition Not Reportable Under 10CFR50.55e.Capacitors Exceeded Recommended shelf-life & Were Not Reformed Prior to Being Placed Into Svc.Procedures Will Be Revised + (ML17275A546)
- GO2-80-165, Forwards Revisions to Electrical,Instrumentation & Control Drawings Listed in Section 1.7 of Fsar.Amend 12 Will Reflect Revisions.W/O Encl + (ML17275A547)
- ML17275A548 + (ML17275A548)
- IR 05000397/1980009 + (ML17275A550)
- ML17275A551 + (ML17275A551)
- ML17275A552 + (ML17275A552)
- ML17275A553 + (ML17275A553)
- ML17275A554 + (ML17275A554)
- GO2-80-172, Forwards SRV Loads - Improved Definition & Application Methodology for Mark II Containments, Prepared by Burns & Roe,Inc.Rept Withheld (Ref 10CFR2.790) + (ML17275A557)
- ML17275A560 + (ML17275A560)
- ML17275A562 + (ML17275A562)
- ML17275A563 + (ML17275A563)
- GO2-80-190, Requests Meeting on 800918 W/Instrumentation & Controls Sys Branch & Reactor Sys Branch to Discuss Concerns Before Contract Expiration on 800930 + (ML17275A564)
- ML17275A565 + (ML17275A565)
- GO2-80-171, Forwards Updated Response to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. W/O Encl.Final Response Will Be Issued in First Quarter 1981 + (ML17275A567)
- ML17275A568 + (ML17275A568)
- ML17275A570 + (ML17275A570)