ML17275A519

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required
ML17275A519
Person / Time
Site: Columbia 
Issue date: 07/07/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8008060512
Download: ML17275A519 (1)


Text

~p,4 RKQy Wp0

~ ~c g

y a

0 lfy~g4 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARO SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94696 July 7, 1980 Docket No. 50-397 Washington Public Pouer Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Attention:

Hr.

N. 0. Strand t1anaging Director Gentlemen:

The enclosed IE Bulletin No. 80-17 is forwarded to you for information.

No.vritten response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, R.

H. Engelken Director

Enclosure:

IE Bul,letin No. 80-17 cc :i/enclosure:

t1.

E. Witherspoon, WPPSS W. C. Bibb, WPPSS G.

C. Sorensen, WPPSS 9008.060 ~< ~