ML17275A535

From kanterella
Jump to navigation Jump to search
Provides Estimated Dates for OL Application,Const Completion & Fuel Load,In Response to NRC 800711 Request.Single Application Will Be Submitted 36 Months Prior to Fuel Loading Dates
ML17275A535
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 08/08/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8008180421
Download: ML17275A535 (5)


Text

REGULATORY 'ORMATION DISTRIBUTION SY EM (RIDS)

ACCESSION NBR: 8008180421 DOC ~ DATE: 80/08/08 NOTARIZED: NO DOCKET, FACIL:50-397 WPPSS Nuclear ProJectr Unjt 2R Washjngton Publjc Powe 05000397

.50-460 WPPSS Nuclear Projects Unit 1r Washington Public Powe 05000460 STN-50-508 WPPSS Nuclear ProJectr Unjt 3r Washington Publjc 05000508 STN-SO-509 WPPSS Nuclear ProJectr Unit Si Washington Public 05000509 SO-513 WPPSS Nuclear ProJecti Unit 4E Washington Public Powe 05000513 AUTH. NAME AUTHOR AFFILIATION RENBERGERRD.L. Washington Public Power SupplV SVstem RECIP ~ NAME RECIPIENTAFFILIATION EISENHUTiD.G. Division of Licensing

SUBJECT:

Provides estjmated dates for OL appljcationrconst completion 8 fuel loadiin response to NRC 800711 request.

DISTRIBUTION CODE: BOOIS COPIES RECEIVED:LTR J; ENCL, Q SI2Ei Related Correspondence TITLE: PSAR/FSAR ANDTS and NOTES:PM: 2 cooies of all material ~ 05000397 Standardized Plant ~ 05000508 05000509 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR EN ID CODE/NAME LTTR ENCL ACTION: A/D LICENSNG 1 A/D LICNENSG YOUNGBLOODRB 1 RUSHBROOKEM ~

LEERY 1 LYNCHED'5 BOURNI A R A ~ 05 1 INTERNAL: ACCID EVAL BR 1 AUX SYS BR 18 CHEM ENG BR 1 CONT SYS BR CORE PERF BR 17 1 DIRR SFTY TECH EFF TR SYS BR 1 EMERG PREP 22 EQUIP QUAL BR 1 GEOSCIENCES HYD/GEO BR 11 1 IR,C SYS BR 20 I8E 06 3 NATL ENG BR MECH ENG BR 1 MPA NRC PDR 02 1 1 OELD POWER SYS BR 1 PROC/TST REV BR QA BR 10 1 RA ASSESS BR12 REAC SYS BR 1 01 SIT ANAL BR 27 1 STRUCT ENG BR EXTERNAL: ACRS 16 1 LPDR 03 NSIC 04 1 gUG 211980 0

,TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL

II I:I H

f \ It lt 1

f f'tt

~ a f

P r I l k ~ gt ~

'I C CP I t I

'l e

p, Ik I

I I

tl It

'I k

I'

'tl I'I 'I Jt I

~ I t4 0 ki '>

Washington Public Power Supply-System A JOINT OPERATING AGENCY P. 0. BOX 963 3000 GCO. WASHINOSON WAY RICHlAND, WASHINOTON 99352 PHONE (509) 375 5000 August 8, 1980 Gol-80-223 G02-80-173 G03-80-1909 Docket Nos: 50-397 50-460/513 50-508/509 U. S. Nuclear Regulatory Commissi.on Division of Licensing Office of Nuclear Reactor Regulation Washington, D.C: 20555 Attention: her. D. G. Eisenhut, Director

Subject:

WPPSS NUCLEAR PRO JECTS 1 2 s 3 4 AND 5

'OPERATING 'LI'CENSE 'APPLICATION SCHEDULES.

Ref.: D," G. Eisenhut to all applicants got'pelati,ng

'etter, li'censes and construction permi.'t holders-, dgted July 11, 1980.

Dear Hr. Eisenhut:

The following estimated dates- for operating license application, construc-.

tion completion, and fuel load for our nuclear projects are prpyi,ded as requested i.n the reference letter.,

For our dual unit plants 5fNP-1/4 and WNP-3/5}, a si;ngle appli:cation wi,ll be submitted 36 months pri'or. to the fuel load target date for the fi.rst of the two units.

QBO/

g/o 8008LSID +Q. (

I

)e '4 II 1

A

U. S. Nuclear Regulatory Commission Attn: Mr. D. G. Eisenhut Page Two August OL Application Construction Dates Completion Fuel Load Docket Nos. ~Pro'ect FSAR/ER Date ~T' WNP-2 3-78/12-76 7-82 7-82

'0-397 50-460 WNP-1 12-81 12-84 12-84 50-508 WNP-3 12-82 12-85 12-85 50-513 WNP-4 12-81 12-85 12-85 50-509 WNP-5 12-82 12-86 12-86 We trust that this will provide you with the needed information, Very ruly your s, L. RENBER Assi tant D or, Technology DLR: GCS:nm cc: Mr. N. S. Reynolds, D8L