ML17275A535

From kanterella
Jump to navigation Jump to search
Provides Estimated Dates for OL Application,Const Completion & Fuel Load,In Response to NRC 800711 Request.Single Application Will Be Submitted 36 Months Prior to Fuel Loading Dates
ML17275A535
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 08/08/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8008180421
Download: ML17275A535 (5)


Text

REGULATORY 'ORMATION DISTRIBUTION SY EM (RIDS)

ACCESSION NBR: 8008180421 DOC ~ DATE: 80/08/08 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear ProJectr Unjt 2R Washjngton Publjc Powe

.50-460 WPPSS Nuclear Projects Unit 1r Washington Public Powe STN-50-508 WPPSS Nuclear ProJectr Unjt 3r Washington Publjc STN-SO-509 WPPSS Nuclear ProJectr Unit Si Washington Public SO-513 WPPSS Nuclear ProJecti Unit 4E Washington Public Powe AUTH.NAME AUTHOR AFFILIATION RENBERGERRD.L.

Washington Public Power SupplV SVstem RECIP ~ NAME RECIPIENTAFFILIATION EISENHUTiD.G.

Division of Licensing

DOCKET, 05000397 05000460 05000508 05000509 05000513

SUBJECT:

Provides estjmated dates for OL appljcationrconst completion 8 fuel loadiin response to NRC 800711 request.

DISTRIBUTION CODE:

BOOIS COPIES RECEIVED:LTR J; ENCL, Q SI2Ei TITLE: PSAR/FSAR ANDTS and Related Correspondence NOTES:PM:

2 cooies of all material

~

Standardized Plant

~

05000397 05000508 05000509 ACTION:

RECIPIENT ID CODE/NAME A/D LICENSNG YOUNGBLOODRB LEERY BOURNI A R A ~

05 COPIES LTTR EN 1

1 1

1 RECIPIENT ID CODE/NAME A/D LICNENSG RUSHBROOKEM ~

LYNCHED'5 COPIES LTTR ENCL INTERNAL: ACCID EVAL BR CHEM ENG BR CORE PERF BR 17 EFF TR SYS BR EQUIP QUAL BR HYD/GEO BR 11 I8E 06 MECH ENG BR NRC PDR 02 POWER SYS BR QA BR 10 REAC SYS BR SIT ANAL BR 27 1

1 1

1 1

1 3

1 1

1 1

1 1

1 AUX SYS BR 18 CONT SYS BR DIRR SFTY TECH EMERG PREP 22 GEOSCIENCES IR,C SYS BR 20 NATL ENG BR MPA OELD PROC/TST REV BR RA ASSESS BR12 01 STRUCT ENG BR EXTERNAL: ACRS NSIC 04 16 1

1 LPDR 03 gUG 211980 0

,TOTAL NUMBER OF COPIES REQUIRED:

LTTR ENCL

I I

H I:I f

\\

It lt 1 f f'tt f

~

a P r I

l k ~

CP I

gt ~

'I C

t I 'l e

p, Ik I

tl k

I It I

'I

'tl I'

I'I

'I Jt I

0

~ I t4 ki '>

Washington Public Power Supply-System A JOINT OPERATING AGENCY P. 0. BOX 963 3000 GCO. WASHINOSON WAY RICHlAND, WASHINOTON 99352 PHONE (509) 375 5000 August 8, 1980 Gol-80-223 G02-80-173 G03-80-1909 Docket Nos:

50-397 50-460/513 50-508/509 U. S. Nuclear Regulatory Commissi.on Division of Licensing Office of Nuclear Reactor Regulation Washington, D.C: 20555 Attention:

her.

D.

G. Eisenhut, Director

Subject:

Ref.:

WPPSS NUCLEAR PRO JECTS 1

2 s 3

4 AND 5

'OPERATING 'LI'CENSE 'APPLICATION SCHEDULES.

'etter, D," G. Eisenhut to all applicants got'pelati,ng li'censes and construction permi.'t holders-,

dgted July 11, 1980.

Dear Hr. Eisenhut:

The following estimated dates-for operating license application, construc-.

tion completion, and fuel load for our nuclear projects are prpyi,ded as requested i.n the reference letter.,

For our dual unit plants 5fNP-1/4 and WNP-3/5}, a si;ngle appli:cation wi,ll be submitted 36 months pri'or. to the fuel load target date for the fi.rst of the two units.

QBO/

g/o 8008LSID +Q. (

I

)e

'4 II 1

A

U. S. Nuclear Regulatory Commission Attn:

Mr.

D.

G. Eisenhut Page Two August Docket Nos.

~Pro'ect OL Application Dates FSAR/ER Construction Completion Date Fuel Load

~T'

'0-397 50-460 50-508 50-513 50-509 WNP-2 WNP-1 WNP-3 WNP-4 WNP-5 3-78/12-76 12-81 12-82 12-81 12-82 7-82 12-84 12-85 12-85 12-86 7-82 12-84 12-85 12-85 12-86 We trust that this will provide you with the needed information, Very ruly your s, DLR: GCS:nm cc:

Mr. N. S.

Reynolds, D8L L.

RENBER Assi tant D

or, Technology