ML17275A523

From kanterella
Jump to navigation Jump to search
Forwards Suppl 2 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required
ML17275A523
Person / Time
Site: Columbia 
Issue date: 07/22/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8008070277
Download: ML17275A523 (2)


Text

~A AK0(

+4 0

c~

P A,

I Cl

~c O

p

+~

~O

+>>*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARO SUITE 202, WALNUTCREEK PLA2A WALNUTCREEK, CALIFORNIA94596 July 22, 1980 Docket Ho. 50-397 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Attention:

Mr. N. 0. Strand Managing Director Gentlemen:

The enclosed Supplement No.

2 to IE Bulletin Ho. 80-17 is forwarded to you for information.

Ho written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, R.

H. Engelken Director

Enclosure:

Supplement No.

2 to IE Bulletin No. 80-17 cc w/enclosure:

M. E. Witherspoon, WPPSS W.

C. Bibb, WPPSS G.

C. Sorensen, WPPSS 8008070 2T7

J