Forwards IE Insp Rept 50-397/80-09 on 800618-20.No Noncompliance Noted
ML17275A548
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/16/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A549 List:
References
NUDOCS 8009020233
Download: ML17275A548 (4)


See also: IR 05000397/1980009

Text

~p,R AECy

P

+4

0

0

C

t

o +w*w+

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

JUL 10

1980

Washington Public

Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP-2 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Messrs.

P.

Johnson

and J. Carlson

of this office on June 18-20,

1980, of activities authorized

by

NRC Construction

Permit

No.

CPPR-93,

and to the discussion of our findings held by the inspectors

with Mr. G. Afflerbach and other members of your staff at the conclusion of

the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection

report.

Within these areas,

the inspection consisted of selective examinations

of procedures

and representative

records,

interviews with personnel,

and obser-

vations

by the inspectors.

No items of noncompliance with

NRC requirements

were identified within the

scope of this inspection.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report contains

any information that you believe to be proprietary, it is necessary

that you submit a written application to this office, within 20 days of the

date of this letter, requesting

that, such information be withheld from public

disclosure.

The application must include

a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared

so that any proprietary information identified is contained in

an enclosure

to the application, since the application without the enclosure

will also

be placed in the Public Document

Room. If w'e do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document

Room.

8609080 2/3

1

Washington Public Power Supply System

-2-

JUL 15

1980

4

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/80-09