ML17275A548
| ML17275A548 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/16/1980 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275A549 | List: |
| References | |
| NUDOCS 8009020233 | |
| Download: ML17275A548 (4) | |
See also: IR 05000397/1980009
Text
~p,R AECy
P
+4
0
0
C
t
o +w*w+
Docket No. 50-397
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
JUL 10
1980
Washington Public
Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. N. 0. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection of WNP-2 (Preoperational
Test Phase)
This refers to the inspection
conducted
by Messrs.
P.
Johnson
and J. Carlson
of this office on June 18-20,
1980, of activities authorized
by
NRC Construction
Permit
No.
CPPR-93,
and to the discussion of our findings held by the inspectors
with Mr. G. Afflerbach and other members of your staff at the conclusion of
the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection
report.
Within these areas,
the inspection consisted of selective examinations
of procedures
and representative
records,
interviews with personnel,
and obser-
vations
by the inspectors.
No items of noncompliance with
NRC requirements
were identified within the
scope of this inspection.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice," Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this
report contains
any information that you believe to be proprietary, it is necessary
that you submit a written application to this office, within 20 days of the
date of this letter, requesting
that, such information be withheld from public
disclosure.
The application must include
a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared
so that any proprietary information identified is contained in
an enclosure
to the application, since the application without the enclosure
will also
be placed in the Public Document
Room. If w'e do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document
Room.
8609080 2/3
1
Washington Public Power Supply System
-2-
JUL 15
1980
4
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Report
No. 50-397/80-09
cc w/o enclosure:
K. T. Perkins, Assistant Director
Generation,
J.
D. Martin, Plant Manager
'actor 0)erations
and Nuclear
Support
Branch
Fg