ML17275A521

From kanterella
Jump to navigation Jump to search
Forwards Suppl 1 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required
ML17275A521
Person / Time
Site: Columbia 
Issue date: 07/18/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8008070144
Download: ML17275A521 (2)


Text

~pS AE0y 0

I nO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 July 18, 1980 Docket No. 50-397 Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99352 q qQQi'<<

Attention:

Mr. N. 0. Strand Managing Director~"

Gentlemen:

It/

The enclosed IE Supplement No.

1 to Bulletin 80-17 is forwarded to you for information.

No written response is required.

= If you desire additional information regarding this matter, please contact this office.

Sincerely, R.

H. Engelken Director

Enclosures:

1.

IE Supplement No.

1 to Bulletin No. 80-17 2.

List of Recently Issued IE Bulletins cc w/enclosures:

M. E. Witherspoon, Division Manager equality Assurance W. C. Bibb, Manager WNP-2 Project G.

C. Sorensen, Supervisor Licensing Engineering gCL~U~~g Ogpu&

6008070 //if'

Iv I'

4,

'h