CNL-17-126, Description of Changes in Revision 2 of the Cyber Security Plan

From kanterella
Jump to navigation Jump to search
Description of Changes in Revision 2 of the Cyber Security Plan
ML17275A463
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/29/2017
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17275A461 List:
References
CNL-17-126
Download: ML17275A463 (2)


Text

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 This letter is decontrolled when separated from the enclosure SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 This letter is decontrolled when separated from the enclosure Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-17-126 September 29, 2017 10 CFR 50.4 10 CFR 50.54 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391

Subject:

Description of Changes in Revision 2 of the Watts Bar Nuclear Plant Cyber Security Plan Reference

1. Letter from NRC to NEI, Endorsement of Addendum 1 to NEI 08-09, Cyber Security Plan for Nuclear Power Reactors, Revision 6, dated April 2010,dated April 25, 2017 (ML17086A408)

The purpose of this letter is to provide a description of changes made in Revision 2 of the Watts Bar Nuclear Plant (WBN) Cyber Security Plan (CSP). WBN CSP Revision 2 (effective date 7/31/2017) incorporated Addendum 1 to NEI 08-09, Revision 6, Cyber Security Plan for Nuclear Power Reactors. Addendum 1 to NEI 08-09, Revision 6, was endorsed for use by the NRC in Reference 1.

The changes made in Revision 2 of the WBN CSP were reviewed against the criteria of 10 CFR 50.54(p), and were determined not to decrease the effectiveness of the Site Security Plans including the Physical Security, Training and Qualification, Contingency, and Cyber Security Plans.

The enclosure to this letter contains a description of the changes made to the WBN CSP.

TVA considers the information contained in the enclosure to be security related information and requests the information be withheld from public disclosure pursuant to 10 CFR 2.390(d)(1).

SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 This letter is decontrolled when separated from the enclosure U. S. Nuclear Regulatory Commission CNL-17-126 Page 2 September 29, 2017 There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Edward D. Schrull at (423) 751-3850.

n (j;/0__ Av J. W. Shea Vice President, Nuclear Regulatory Affairs and Support Services

Enclosure:

Description of Changes For WBN CSP Revision 2 cc: (w/o Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 This letter is decontrolled when separated from the enclosure