Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17213A564 + (ML17213A564)
- ML17213A565 + (ML17213A565)
- ML17213A567 + (ML17213A567)
- ML17213A568 + (ML17213A568)
- L-82-440, Advises of Request for Proposal to Provide Criteria for Special Lifting Devices to Demonstrate Equivalency W/ Guideline 4 of NUREG-0612, Control of Heavy Loads. Addl Info Will Be Provided as Soon as Possible Re 821007 Telcon + (ML17213A570)
- L-82-439, Forwards Addl Info Re Onsite Ac Power Sys Bus Tie Interlocks + (ML17213A571)
- ML17213A572 + (ML17213A572)
- ML17213A573 + (ML17213A573)
- ML17213A574 + (ML17213A574)
- ML17213A576 + (ML17213A576)
- L-82-449, Informs That All Generic Ltrs Through 82-14 Applicable to Facility Have Been Reviewed & Required Responses Submitted + (ML17213A580)
- L-82-448, Forwards Const/Startup Monthly Progress Rept for Sept 1982 + (ML17213A581)
- ML17213A582 + (ML17213A582)
- ML17213A583 + (ML17213A583)
- L-82-450, Forwards Proprietary Response to NRC Questions on Implementation of St Lucie Unit 2 Rod Bow & Grid Spacing Penalties to Resolve Action Items Identified in SER (NUREG-0843).Withheld (Ref 10CFR2.790) + (ML17213A587)
- L-82-455, Forwards Proprietary Final Assessment of St Lucie 2 Fuel Structural Integrity Under Faulted Conditions, CEN-187(1)-P,Revision 1-P & St Lucie 2 Fuel & CEA Design Summary Evaluation Rept, CEN-222(1)-P.Repts Withheld + (ML17213A592)
- L-82-466, Forwards Responses to Findings Identified During 820831-0902 Instrumentation & Control Audit + (ML17213A596)
- ML17213A598 + (ML17213A598)
- ML17213A599 + (ML17213A599)
- ML17213A600 + (ML17213A600)
- ML17213A601 + (ML17213A601)
- L-82-465, Forwards Revision to Loose Parts Monitoring Sys Training Program Previously Submitted in + (ML17213A602)
- ML17213A605 + (ML17213A605)
- ML17213A606 + (ML17213A606)
- L-82-467, Forwards Addl Info Re Fire Protection Issues,In Response to NRC Request at 821021 Meeting.Info Consists of Discussion of Combustion Properties of Control Room Panelling & Description of Fire Stop Testing + (ML17213A610)
- ML17213A614 + (ML17213A614)
- ML17213A615 + (ML17213A615)
- L-82-454, Forwards Revision 4 to Environ Qualification Rept & Guidebook, Vols 2-4,for safety-related Electrical Equipment.Responses to NRC Comments Identified During NRC Site Audit Encl + (ML17213A618)
- ML17213A619 + (ML17213A619)
- ML17213A621 + (ML17213A621)
- L-82-470, Forwards Reactor Protection Sys Matrix Mockup Fault Isolation & Surge Withstand Qualification Test Rept,Fl Power & Light,St Lucie Unit 2 + (ML17213A622)
- ML17213A623 + (ML17213A623)
- ML17213A626 + (ML17213A626)
- L-82-475, Forwards C-E Proprietary Rept Response to Questions on Cesec. Rept Withheld (Ref 10CFR2.790) + (ML17213A627)
- L-82-480, Forwards Addl Info Requested Re Confirmatory Piping Analysis Open Items + (ML17213A630)
- L-82-473, Forwards Info on How Unit 1 Natural Circulation Cooldown Analysis Is Applicable to Unit 2.Unit 2 Parameters Almost Identical to Unit 1 Parameters + (ML17213A631)
- L-82-474, Forwards Description of Mods to Iodine Removal Sys,Per 821021 Discussion Re Offsite Dose Models + (ML17213A632)
- L-82-472, Forwards Response to NRC Request Re Boron Dilution Sys Alarm,Per FSAR Question 440.28.Util Will Install Redundant Alarm to Alert Operators to Boron Dilution Transient + (ML17213A633)
- ML17213A636 + (ML17213A636)
- ML17213A637 + (ML17213A637)
- ML17213A638 + (ML17213A638)
- ML17213A644 + (ML17213A644)
- ML17213A645 + (ML17213A645)
- L-82-486, Confirms 821102 Telcon Re Util Commitment to Provide Protective 1-h Thermal Wrap on HVAC Ducts Traversing Fire Area 48 from Penetration 3 to Penetration 4 & from Penetration 5 to Penetration 6 + (ML17213A650)
- L-82-478, Forwards Addl Info Re Core Exit Thermocouples in Response to Request.Representative Core Exist Temp Will Be Selected from Upper End of Temp Distribution + (ML17213A651)
- L-82-487, Forwards Operating Procedure Guidelines for Detection of Boron Dilution,Supplementing Describing Interim Measures to Detect Occurrences of Inadvertent Boron Dilution Until Alarm Sys Is Installed on Late 1983 + (ML17213A654)
- STC-17-070, Acceptance Letter - Brachytherapy Gamma Knife (H313) and Other Medical Uses - December 4 - 8, 2017, Houston Tx + (ML17213A658)
- ML17213A660 + (ML17213A660)
- ML17213A661 + (ML17213A661)
- ML17213A662 + (ML17213A662)
- ML17213A663 + (ML17213A663)