4 Docket No.:
50-389 NOV 3 tggg APPLICANT:
Florida Power and Light Company, (FP&L)
FACILITY:
St. Lucie Plant, Unit 2
SUBJECT:
SUMMARY
OF MEETING HELD IN BETHESDA, MARYLAND WITH FP&L ON OCTOBER 21, 1982 REGARDING FIRE PROTECTION A
~
The staff discussed their position on the FP&L approval request for Appendix R
deviations.
On several items the staff denied the request.
These are listed in Items 1 through 7 below.
The designations, A-l, C-5 etc.
correspond to the deviation designations submitted in the FP&L July l4, 1982 letter.
1.
Deviation A-1 was denied.
2.
Deviation C-5 was denjed.
3.
Deviation C-4 was denied.
4 ~
Deviation F-1 was denied.
5.
Deviation H-3 was denied.
6.
Deviation K-1 was denied.
7.
8.
Deviation M-M-1 was denied.
f FP&L will document the flame spread, smoke and fuel contributed rating of the control room paneling and that this compli'es with Appendix A.
By 10/25.
9.
FP&L will document the conclusion that supports for wrapped conduits will maintain their integrity through a
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire.
The date for when this will be done will be established the week of 10/25/82.
10.
FP&L will supply a clarifying paragraph on how the fire stop test report meets the 10/25/82 criteria of E-119-81.
The schedule for this is the week of 10/25/82.
ll.
FP&L will formally commit to control room isolation of the source range monitor located on the hot shutdown panel by 10/22/82.
82iii00052 82ii02 PDR ADOCI4l 05000389 F
PDR OFFICE/
SURNAME/
OATE Q NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQPO: 1981-33&960
f~
1 L
meeting Summary 12.
A follow up fire protection meeting will be held on 10/30/82.
Orig~ Signed By:
Victor Nerses, Project t1anager Licensing Branch No.
3 Division of Licensing
Attachment:
Meeting Attendees cc w/attachment See next page Distribution:
See next page OFFICEI SURNAME/
DATE0 V
yh
.J...l....J...BR D
~ ~ ~ ~ ~ ~ ~ I~
G ig ton
..~(/...l../8.2....
~ ~ ~ 0 ~ ~ ~ ~ tiO ~ ~ ~ 0 ~ 0 ~ ~ ~ ~
~ 0 ~ 0 ~ 0 ~i~
~i ~ ~ ~ ~ 0 ~I~ 0 ~ ~ 0
~ ~ 0 ~I~ OI ~ 0 ~ 0 ~I~ ~ 0 ~ 0 ~I~ ~ ~
~ ~
~ ~
~ ~
~ ~ ~ ~
~ ~ ~ ~ ~
~ ~
~ ~ 0 ~ 0 ~ ~
~\\ ~ ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ 0
~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 ~ 1 ~I~ 0 ~ ~i~ 0 ~ ~
NRG FORM 318 (10.80) NRCM 0240 OFF I CIA L R ECO R D COPY U8GPO: 1981~960
~qx>
~a,
~
~
ST.
LUCIE Dr. Robert E. Uhrig, Vice Pres ident Advanced Systems and Technology Florida Power
& Light Company P. 0.
Box 5291000 Miami, Florida 33152 Harold F. Reis, Esq.
Lowenstein, Newman, Reis, Axelrad
& Toll 1025 Connecticut Avenue, N.M.
Mashington, D. C.
20036 Norman A. Coll, Esq.
Steel Hector
& Davis 1400 Southeast First National Bank Building Miami, Flordia 33131 Mr. Martin H. Hodder 1131 N.
E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South-'APA Jensen Beach, Flordia 33457 Regional Adminstrator Region II U. S.
Nuclear Regulatory Commission 1.01 Marietta Street Suite 3100 Atlanta, Georgia 30303
ATTENDEES FIRE PROTECTION Name Joe Ruggiero John Franklin John Ridgely Vi'nce Panciera Nike Horrell Enoch 2uchman C. L. Fishen E.
W. Dotson R.
L. Ferguson J.
F. Stang J.
Behn Robert Sweeney Jack Siegel Vic Nerses Or anization Ebasco FP&L NRC NRC Ebasco/Licensing Ebasco FP&L FP&L NRC NRC GAGE-Babcock
& Associates Ebasco Ebasco NRC
t i
hEETI t<G SUPE'<ARY ocument Control (50-38g)
HRC PDR L PDR t<S IC TERA-LB;.3 Reading J.
Lee G. Knighton project Manager V. N<<ses
- Attorney, OELD E. L. Jordon Regional Administrator, Region J.
N. Taylor PARTICIPANTS (NRC