Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML020790047 + (ML020790047)
- ML020790049 + (ML020790049)
- ML020790053 + (ML020790053)
- ML020790054 + (ML020790054)
- ML020790061 + (ML020790061)
- ML020790065 + (ML020790065)
- B18599, Technical Specification Change Request 3-16-01 Revision of the Term Refueling Interval + (ML020790072)
- ML020790085 + (ML020790085)
- Press Release-02-030, Note to Editors: Location Change for March 19 Meeting in Rockville + (ML020790090)
- ML020790125 + (ML020790125)
- ML020790191 + (ML020790191)
- Information Notice 2002-12, Submerged Safety-Related Electrical Cables + (ML020790238)
- ML020790250 + (ML020790250)
- IR 05000305/2001017 + (ML020790256)
- ML020790273 + (ML020790273)
- BSEP 02-0067, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate + (ML020790275)
- HL-6208, Response to Requests for Additional Information on Technical Specification Change Request: Excess Flow Check Valve Surveillance Requirements (EFCV) + (ML020790280)
- LR-N02-0080, Request for Change to Technical Specifications Requirements Supplemental Request One-Time Extension to Increase the Interval of the Integrated Leak Rate Test from Ten to Fifteen Years + (ML020790284)
- ML020790289 + (ML020790289)
- ML020790298 + (ML020790298)
- ML020790300 + (ML020790300)
- ML020790304 + (ML020790304)
- ML020790334 + (ML020790334)
- ML020790347 + (ML020790347)
- ML020790412 + (ML020790412)
- BSEP 02-0064, Revision to Plant Emergency Procedure, Revision 22 to OPEP-04.6, Radiological Emergency Kit Inventories + (ML020790437)
- NOC-AE-02001278, Response to NRC Order Modifying Licenses (Effective Immediately) EA-02-026 + (ML020790439)
- ML020790439 + (ML020790439)
- GNRO-2002/00029, Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures + (ML020790450)
- ML020790453 + (ML020790453)
- Press Release-02-031, NRC Requires Pressurized Water Reactor Licensees to Submit Information on Reactor Vessel Heads + (ML020790455)
- NLS2002030, Response to Order for Interim Safeguards and Security Compensatory Measures + (ML020790456)
- ML020790460 + (ML020790460)
- ML020790476 + (ML020790476)
- ML020790479 + (ML020790479)
- ML020790481 + (ML020790481)
- Press Release-I-02-018, NRC to Meet with Exelon to Discuss Limerick Plant Performance + (ML020790486)
- ML020790492 + (ML020790492)
- 05000305/LER-2002-001, Re Unanalyzed Condition: Strong Pump - Weak Pump Interaction Between Component Cooling Water Pumps + (ML020790506)
- 05000311/LER-2002-001, Re Technical Specification Shutdown Due to 2A Diesel Generator Being Inoperable + (ML020790508)
- ML020790510 + (ML020790510)
- ML020790516 + (ML020790516)
- IR 05000269/2002003 + (ML020790521)
- L-02-022, Order for Interim Safeguards and Security Compensatory Measures + (ML020790522)
- ML020790528 + (ML020790528)
- ML020790530 + (ML020790530)
- ML020790533 + (ML020790533)
- ML020790541 + (ML020790541)
- JPN-02-004, Request for an Extension of Time to Submit an Answer and Request for Hearing + (ML020790550)
- ML020790552 + (ML020790552)
- JPN-02-005, Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures + (ML020790554)