ML020790439
| ML020790439 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/18/2002 |
| From: | Cottle W South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-02-026, NOC-AE-02001278 | |
| Download: ML020790439 (3) | |
Text
Nuclear Operating Company South Texas Projed Electnc Genelatin$ StaWIon PO. Box 289 Wadsworth Teras 77483 March 18, 2002 NOC-AE-02001278 10 CFR 50.4 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ENCLOSURE CONTAINS AFEGUARDS INFORMATION i PON. SEPARATION THIS AG SDECOINTROLLED South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Response to NRC Order Modifying Licenses (Effective Immediately) EA-02-026
Reference:
- 1.
Letter, S. J. Collins to W. T. Cottle, "Issuance of Order for Interim Safeguards and Security Compensatory Measures for - South Texas Project, Units 1 & 2," February 25, 2002
- 2.
Letter, W. T. Cottle to Secretary of the Commission, "Answer of STP Nuclear Operating Company to the Commission's Order Modifying Licenses (Effective Immediately) And Request for Extension of Time,"
March 18, 2002, NOC-AE-02001288 In accordance with Nuclear Regulatory Commission (NRC) Order EA-02-026 (the Order) dated February 25, 2002, which was transmitted by Reference 1, and 10 CFR 50.4, STP Nuclear Operating Company (STPNOC) hereby submits the information required by Conditions B.1, B.2 and C.1 of Section III of the Order via overnight delivery. In addition, as required by Section IV of the Order, STPNOC also has submitted an answer to the Order in accordance with 10 CFR 2.202 (Reference 2).
The required answer has been submitted separately with a request for extension of time to request a hearing.
The NRC required that STPNOC submit a response addressing Conditions B.1, B.2 and C.1 in Section III of the Order within twenty (20) days of the date of the Order. to this letter contains STPNOC's response, which specifically delineates the actions taken or to be taken by STPNOC to comply with the Order. Only those actions specifically listed in Enclosure 1 to this letter are considered as commitments to the requirements of the Order.
Condition C.1 of the Order requires the submission of a schedule for achieving compliance with the requirements in Attachment 2 to the Order. Enclosure 1 to this letter lists these requirements and describes in detail STPNOC's actions and schedule I
- 7-ti (56 F-SAFENPRD 9H 0&~AT10N,
SAFEGUARDS 1NFORMA=TON NOC-AE-02001278 Page 2 of 3 to comply. Enclosure 1 contains safeguards information and should be withheld from public disclosure in accordance with 10 CFR 73.21.
The Order was immediately effective and modifies STPNOC's licenses to operate South Texas Project Units 1 & 2 to require STPNOC to begin immediately to implement interim security and safeguards measures set forth in Attachment 2 to the Order. In accordance with the Order, STPNOC is implementing these actions as detailed in.
Any questions regarding this letter, and the enclosure therein, should be directed to Mark McBurnett at (361) 972-7206.
W. T. Cottle President and Chief Executive Officer
Enclosure:
1)
Twenty Day Response of STP Nuclear Operating Company to Order Modifying Licenses (Safeguards Information)
ENCLOSURE CONTAINS FEGUARDS INFORMATION PON*SEPARATION THIS kAGE IS DECONTROLLED,
SAFGURDS INFORMATIONI
SAFEGUARDS IIO R-AO AN NOC-AE-02001278 Page 3 of 3 Samuel J. Collins Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint North, Mail Stop: 0-5 E7 11555 Rockville Pike Rockville, MD 20852-2738 Ellis W. Merschoff*
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
- two copies
- original and 3 copies Glenn Tracy U. S. Nuclear Regulatory Commission 1 White Flint North, Mail Stop: 0-6 H16 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission**
Document Control Desk Washington, DC 20555-0001 k ENCLOSURE CONTAINS FEGUARDS INFORMATION JPON SEPARATION THIS AGE IS DECONTROLLED I cc: without Enclosure Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, Texas 78205-3692 M. T. Hardt/W. C. Gunst City Public Service P. O. Box 1771 San Antonio, TX 78296 R. L. Balcom/D. G. Tees Reliant Energy, Inc.
P. O. Box 1700 Houston, TX 77251 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 C. A. Johnson/A. C. Bakken III AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5012 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 cc: with Enclosure S A r E-G U A F
m
- i i ii I I
I "t