ML020790492
| ML020790492 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/18/2002 |
| From: | Campbell G FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PY-CEI/NRR-2622L | |
| Download: ML020790492 (2) | |
Text
FENOC Perry Nuclear Power Plant FENOC10 Center Road
- Perry, Ohio 44081 FirstEnergy Nuclear Operating Company 440-280-5224 Guy G. Campbell Fax: 440-280-8029 Vice President - Nuclear SAFEGUARDS INFORMATION March 18, 2002 PY-CEI/NRR-2622L U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Order for Interim Safeguards and Security Compensatory Measures Ladies and Gentlemen:
The FirstEnergy Nuclear Operating Company (FENOC) has reviewed the Order for Interim Safeguards and Security Compensatory Measures for the Perry Nuclear Power Plant (PNPP), issued on February 25, 2002. This Order, which modifies the current operating license for PNPP, requires a response regarding the implementation of the requirements set forth in Attachment 2 to the Order.
The Perry Nuclear Power Plant intends to comply with the requirements described in to the Order. The current status of the PNPP implementation of each of these requirements is listed in the Attachment to this response. In instances where compliance has not yet been achieved, a schedule for implementation has been provided, with the exception of Interim Compensatory Measure B.2.a, which will be provided at a later date. For the implementation schedules provided in the Attachment, complete implementation will be achieved no later than August 31, 2002 as required by the Order.
The information contained in the Attachment to this letter is considered Safeguards Information under the provisions of 10 CFR 73.21, and is thereby exempt from public disclosure. Upon separation of the Attachment, this letter is "decontrolled."
If there are any questions concerning this matter, please contact Mr. Thomas E. Mahon, Manager - Site Protection Section, at 440-280-5314.
SAFEGUARDS INFORMATION Decontrolled upon removal of Attachment
SAFEGUARDS INFORMATION Perry Nuclear Power Plant Order for Interim Safeguards and Security Compensatory Measures PY-CEI/NRR-2622L Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on March 18, 2002.
Guy G. Campbell Attachment cc: Addressee (4 copies)
Mr. Douglas V. Pickett, Senior Project Manager (w/o Attachment)
Mr. Raymond J. Powell, Senior resident Inspector (1 copy)
Mr. James E. Dyer, Administrator - NRC Region I1 (2 copies)
Mr. Glenn M. Tracy, Chief, Reactor Safeguards, USNRC (1 copy)
Mr. Samuel J. Collins, Director, Office of Nuclear Reactor Regulation (1 copy)
SAFEGUARDS INFORMATION Decontrolled upon removal of Attachment