Bulletin 2001-01 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, Responses
ML020790510
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/08/2002
From: Milano P
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
Milano P
References
IEB-01-01, TAC MB2634, TAC MB2635
Download: ML020790510 (7)


Text

April 8, 2002 Mr. Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

BULLETIN 2001-01, CIRCUMFERENTIAL CRACKING OF REACTOR PRESSURE VESSEL HEAD PENETRATION NOZZLES, RESPONSES FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS.

MB2634 AND MB2635)

Dear Mr. Kansler:

On August 3, 2001, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, requesting licensees to provide information related to the structural integrity of the reactor pressure vessel head penetration (VHP) nozzles for their respective facilities. The information requested from the licensees included the extent of VHP nozzle leakage and cracking that has been found to date, the inspections and repairs that have been undertaken to satisfy applicable regulatory requirements, and the basis for concluding that their plans for future inspections will ensure compliance with applicable regulatory requirements at their respective pressurized-water reactor plants. In this regard, you were requested to respond to Items 1 and 4 of the Bulletin within 30 days of its issuance.

In a letter dated September 4, 2001 (ADAMS Accession Nos. ML012500124), Consolidated Edison Company of New York, Inc. (the former licensee) responded to Bulletin 2001-01 for Indian Point Nuclear Generating Unit No. 2 (IP2) and indicated that Entergy Nuclear Operations, Inc. would supplement the response in 30 days because of the pending license transfer. In a letter dated September 24, 2001 (ADAMS Accession No. ML012710201), you provided the supplemental information for IP2. In a letter dated August 31, 2001 (ADAMS Accession No. ML012610127), you responded to the Bulletin for Indian Point Generating Unit No. 3 (IP3). On November 13, 2001 (ADAMS Accession No. ML020720484), you also provided a supplemental response for Item 4(a) for IP2 and 3 in which you revised the proposed VHP inspection plans. In these letters, you state that IP2 and 3 are classified as having moderate susceptibility to primary water stress corrosion cracking in the VHP nozzles, based on a relative susceptibility ranking of 5 to 30 effective full-power years from the Oconee Nuclear Station, Unit 3, condition.

The NRC staff finds that you have provided the requested information in these response letters.

In your November 13 letter, you stated that you plan to perform an effective examination of essentially 100 percent of the VHP nozzles at your next refueling outage for each unit, with essentially 100 percent meaning essentially 360 degrees around 100 percent of the VHPs.

Although your response does not specify the inspection method and other details for each inspection, you did commit to submit written reports to the NRC staff with additional details regarding the type of inspection(s), applicable qualification requirements and acceptance

M. Kansler criteria, with these reports submitted 90 days before the start of each outage. The NRC staff has concluded that the inspection schedule and scope described in your Bulletin responses provide reasonable assurance that the public health and safety will be maintained at IP2 and 3.

Since the proposed inspection scope and schedule described in your response were integral to the staffs findings, it is the staffs expectation that you will submit a revised response to the Bulletin if you make any substantive changes to the schedule and/or scope of future inspections for your plants. If warranted by such changes, the staff will reevaluate this issue for IP2 and 3.

You are reminded that Item 5 of the Bulletin requested the following information within 30 days after plant restart following the next refueling outage:

a.

a description of the extent of VHP nozzle leakage and cracking detected at your plant, including the number, location, size, and nature of each crack detected;

b.

if cracking is identified, a description of the inspections (type, scope, qualification requirements, and acceptance criteria), repairs, and other corrective actions you have taken to satisfy applicable regulatory requirements. This information is requested only if there are any changes from prior information submitted in accordance with this Bulletin.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager,Section I Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: See next page

M. Kansler criteria, with these reports submitted 90 days before the start of each outage. The NRC staff has concluded that the inspection schedule and scope described in your Bulletin responses provide reasonable assurance that the public health and safety will be maintained at IP2 and 3.

Since the proposed inspection scope and schedule described in your response were integral to the staffs findings, it is the staffs expectation that you will submit a revised response to the Bulletin if you make any substantive changes to the schedule and/or scope of future inspections for your plants. If warranted by such changes, the staff will reevaluate this issue for IP2 and 3.

You are reminded that Item 5 of the Bulletin requested the following information within 30 days after plant restart following the next refueling outage:

a.

a description of the extent of VHP nozzle leakage and cracking detected at your plant, including the number, location, size, and nature of each crack detected;

b.

if cracking is identified, a description of the inspections (type, scope, qualification requirements, and acceptance criteria), repairs, and other corrective actions you have taken to satisfy applicable regulatory requirements. This information is requested only if there are any changes from prior information submitted in accordance with this Bulletin.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: See next page DISTRIBUTION:

PUBLIC PD I-1 R/F R. Cesaro (EMCB R/F)

E. Adensam W. Bateman J. Munday A. Hiser P. Milano B. Wetzel, LPM B. Platchek, R-I S. Little J. Collins OGC ACRS ACCESSION NO. ML020790510 OFFICE PDI-1/PM EMCB/LPM PDI-1/LA EMCB/C PDI-1/SC NAME PMilano BWetzel SLittle WBateman RLaufer DATE 03/25/02 03/25/02 04/8/02 04/04/02 04/8/02 OFFICIAL RECORD COPY

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Jerry Yelverton Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. Fred Dacimo Vice President Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Units 1 & 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Robert J. Barrett Vice President - Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 Mr. Dan Pace Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Knubel Vice President Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Lawrence G. Temple General Manager Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Joseph DeRoy General Manager Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 Mr. John Kelly Director of Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene Fiason Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John McCann Manager, Nuclear Safety and Licensing Indian Point Nuclear Generating Unit 2 Entergy Nuclear Operations, Inc.

295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Harry P. Salmon, Jr.

Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John Donnelly Licensing Manager Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Thomas Walsh Secretary - NFSC Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector, Indian Point 2 U. S. Nuclear Regulatory Commission 295 Boradway, Suite 1 P.O. Box 38 Buchanan, NY 10511-0038 Resident Inspectors Office, Indian Point 3 U.S. Nuclear Regulatory Commission 295 Broadway, Suite 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. J. Spath, Program Director New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Ronald Schwartz SRC Consultant 64 Walnut Drive Spring Lake Heights, NJ 07762 Mr. Ronald J. Toole SRC Consultant Toole Insight 605 West Horner Street Ebensburg, PA 15931 Mr. Charles W. Hehl SRC Consultant Charles Hehl, Inc.

1486 Matthew Lane Pottstown, PA 19465 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Alex Matthiessen Executive Director Riverkeeper, Inc.

25 Wing & Wing Garrison, NY 10524 Paul Leventhal The Nuclear Control Institute 1000 Connecticut Avenue NW Suite 410 Washington, DC, 20036 Karl Copeland Pace Environmental Litigation Clinic 78 No. Broadway White Plains, NY 10603 Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001