North Atlantic Energy Service Corporation NorthP.O.
Box 300 North Seabrook, NH 03874 S Atlantic (603) 474-9521 The Northeast Utilities System March 8, 2002 Docket No. 50-443 NYN-02025 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station February 2002 Monthly Operating Report Enclosed please find Monthly Operating Report 02-02. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of February, 2002 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this
- matter, please contact Mr. James M. Peschel, Manager - Regulatory Programs, at (603) 773-7194.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
Gene F. St. Pierre Station Director cc:
H. J. Miller, NRC Region I Administrator G. F. Wunder, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector
OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook I DATE March 1,2002 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 OPERATING STATUS
- 1.
Unit Name:
Seabrook Station Unit 1
- 2.
Reporting Period:
FEBRUARY 2002
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1148.0
- 5.
Maximum Dependable Capacity (Net MWe):
1155.3
- 6.
If Changes Occur in Capacity Ratings (Items Number 3 through 5)
Not Applicable Since Last Report, Give Reasons:
This Month Yr-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 672.0 1416.0 87919.9
- 8.
Hours Generator On-Line 672.0 1416.0 85124.7
- 9.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10.
Net Electrical Energy Generated (MWH) 778295 1639785 95525317 1 of 2 OPERATING
SUMMARY
The unit operated at 100% Rated Thermal Power (RTP) for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.2% based on the MDC value of 1155.3 Net MWe.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-443 UNIT Seabrook I DATE March 1, 2002 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 MONTH: FEBRUARY 2002 2 of 2 NO.
DATE TYPE' DURATION REASON2 METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR COMMENTS No entries for this month.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
I
__I_
_