B18599, Technical Specification Change Request 3-16-01 Revision of the Term Refueling Interval
| ML020790072 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/06/2002 |
| From: | Price J Dominion Nuclear Connecticut |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| B18599, TAC MB4013 | |
| Download: ML020790072 (2) | |
Text
Dominion Nuclear Connecticut, Inc.
Domi ni on....
Millstone Power Station Doinion Rope Ferry Road Waterford, CT 06385 MVAR 6 2002 Docket No. 50-423 B18599 RE: 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Technical Specification Change Request 3-16-01 Revision of the Term "REFUELING INTERVAL" (TAC NO. MB4013)
In a letter dated February 5, 2002,(
Dominion Nuclear Connecticut, Inc. (DNC) submitted a license amendment request associated with the revision of the term "REFUELING INTERVAL" to "once per 24 months" in several surveillance requirements of the Millstone Unit No. 3 Technical Specifications.
Since then, it has come to our attention that three (3) surveillance requirements [4.4.3.1.2 (page 3/4 4-11), 4.4.3.2.2 (page 3/4 4-11b) and 4.6.4.1.c (page 3/4 6-16)] included in the subject license amendment request, were not part of our original 24-months fuel cycle extension requests and were not approved as 24 months surveillances. Therefore, we should not have included changes to those surveillance requirements in our license amendment request dated February 5, 2002.
Accordingly, DNC is hereby withdrawing the changes related to the surveillance requirements 4.4.3.1.2, 4.4.3.2.2 and 4.6.4.1.c from our request dated February 5, 2002. This action will not affect the conclusions of the Safety Summary, Significance Hazards Consideration or Environmental Consideration provided in our license amendment request dated February 5, 2002.
There are no regulatory commitments contained within this letter.
(1) J. A. Price letter to the U.S. Nuclear Regulatory Commission, "Millstone Nuclear Power Station, Unit No. 3, Technical Specification Change Request 3-16-01, Revision of the Term, "REFUELING INTERVAL," dated February 5, 2002.
Ar-b
U.S. Nuclear Regulatory Commission B18599/Page 2 If you should have any questions regarding this submittal, please contact Mr. Ravi Joshi at (860) 440-2080.
Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.
President - Millstone Subscribed and sworn to before me Date Commission Expires:
SANDRAJ. ANTON NOTARY
""PUBLIC COMMISSION EXPIRES MAY31,2005 cc:
H. J. Miller, Region I Administrator V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 NRC Senior Resident Inspector, Millstone Unit No. 3 Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127