Issue date | Title | Topic | |
---|---|---|---|
ML24033A060 | 1 February 2024 | Final ASP Analysis - Grand Gulf Nuclear Station, Manual Reactor Scram Due to Trip of the 'A' Reactor Feedwater Pump (LER 416-2022-003) - Reject | |
ML24012A142 | 31 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
IR 05000416/2023004 | 25 January 2024 | Integrated Inspection Report 5000416/2023004 | |
ML24023A324 | 23 January 2024 | Inservice Inspection Request for Information | |
ML24018A022 | 18 January 2024 | Core Operating Limits Report (COLR) Cycle 24, Revision 2 | |
IR 05000416/2024301 | 16 January 2024 | NRC Initial Operator Licensing Examination Approval 05000416/2024301 | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
PMNS20231406, Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request | 11 January 2024 | Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23348A122 | 14 December 2023 | NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems | Internal Flooding Probabilistic Risk Assessment |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23348A371 | 14 December 2023 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
ML23340A222 | 13 December 2023 | Project Manager Assignment | |
ML23335A065 | 1 December 2023 | NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) | Safe Shutdown High winds Reactor Vessel Water Level Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Open Phase Condition Large early release frequency Tornado Missile Risk Evaluator Flooding Focused Evaluation Offsite Circuit |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A142 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
IR 05000416/2023403 | 13 November 2023 | Security Baseline Inspection Report 05000416/2023403 Cover Letter | Affidavit |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000416/2023003 | 8 November 2023 | Integrated Inspection Report 05000416/2023003 | Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Stroke time Enforcement Discretion Met Tower Functionality Assessment Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program |
ML23270B993 | 29 September 2023 | Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary | |
ML23270B189 | 27 September 2023 | Evacuation Time Estimate Study | Pandemic Coronavirus COVID19 Siren |
ML23269A124 | 27 September 2023 | Request for Withholding Information from Public Disclosure | |
ML23240A395 | 28 August 2023 | Reply to a Notice of Violation; EA-23-019 | |
ML23240A341 | 28 August 2023 | NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | |
IR 05000416/2023005 | 21 August 2023 | Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) | Cyber Security License Renewal |
ML23226A100 | 18 August 2023 | Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 | Internal Flooding Probabilistic Risk Assessment FLEX Open Phase Condition Tornado Missile Risk Evaluator |
IR 05000416/2023002 | 8 August 2023 | Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 | Stroke time Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Power change Unidentified leakage |
IR 05000416/2023404 | 7 August 2023 | Material Control and Accounting Program Inspection Report 05000416/2023404 | Affidavit |
IR 05000416/2023091 | 28 July 2023 | Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 | Significance Determination Process Preliminary White Finding |
ML23208A211 | 27 July 2023 | Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | Shutdown Margin Reactor Vessel Water Level Packing leak Water Inventory Control Surveillance Frequency Control Program Pressure Boundary Leakage |
ML23193A841 | 17 July 2023 | Summary of Entergy Operations, Inc. Regulatory Conference: GGNS, Calibration Failures of Drywell/Containment High Range Radiation Monitors Resulting in White Finding July 6, 2023 | Safe Shutdown Significance Determination Process Surveillance Frequency Control Program Fuel cladding Preliminary White Finding |
ML23191A280 | 10 July 2023 | NRR E-mail Capture - Grand Gulf - Acceptance Review for LAR Adopting TSTF-505, Rev. 2, Provide Risk-Informed Completion Times - RITSTF Initiative 4b | |
ML23191A866 | 10 July 2023 | NRR E-mail Capture - Grand Gulf - Acceptance Review of LAR Adopting 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors | |
IR 05000416/2023090 | 27 June 2023 | Public Meeting Notice: Grand Gulf Nuclear Station, Dated IR 05000416/2023090 - Preliminary White Finding Choice Letter | Preliminary White Finding |
ML23166B066 | 15 June 2023 | Response to NRC Integrated Inspection Report 05000416/2023001 | Time of Discovery Enforcement Discretion Significance Determination Process |
ML23166B071 | 15 June 2023 | Reply to Notice of Violation EA-22-104 and EA-22-115 | Fire Protection Program Fire Watch |
ML23159A230 | 8 June 2023 | Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | EVT-1 |
GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 6 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Condition Adverse to Quality FLEX Tornado-Generated Missile Abnormal operational transient Fukushima Dai-Ichi Seismically rugged Tornado Missile Protection Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Tornado Missile Risk Evaluator Earthquake Recently irradiated fuel Offsite Circuit Fire Protection Program |
GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 6 June 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Fukushima Dai-Ichi Tornado Missile Protection Surveillance Frequency Control Program Large early release frequency Tornado Missile Risk Evaluator |
OI 4-2022-007, 4-22-007 - OI Closure to Licensee - Signed | 22 May 2023 | 4-22-007 - OI Closure to Licensee - Signed | |
ML23122A163 | 18 May 2023 | NRC Inspection Report 05000416/2023090 and Preliminary White Finding | Significance Determination Process Operability Determination Preliminary White Finding |
IR 05000416/2023402 | 17 May 2023 | Security Baseline Inspection Report 05000416/2023402 | Fitness for Duty Significance Determination Process |
ML23110A800 | 10 May 2023 | Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 | Safe Shutdown Time of Discovery Reactor Vessel Water Level High Radiation Area Fire Barrier Stroke time Commercial Grade Dedication Internal Flooding Past operability Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Continuous fire watch Fire Protection Program Fire Watch Scaffolding Downpower Power Uprate |
IR 05000416/2023001 | 10 May 2023 | Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 | Safe Shutdown Time of Discovery Reactor Vessel Water Level High Radiation Area Fire Barrier Stroke time Commercial Grade Dedication Internal Flooding Past operability Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Continuous fire watch Fire Protection Program Fire Watch Scaffolding Downpower Power Uprate |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations |