Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03127005531 December 2002Annual Radioactive Effluent Release Report, Section 4 Through Appendix aGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML03127000831 December 2002Annual Radioactive Effluent Release Report, Table IA Through Section 3.12.1Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML03003054223 December 2002Guarantees of Payments of Deferred PremiumsIncorporated by reference
ML03003055023 December 2002License Amendment Request 02-10, Administrative Changes to Technical Specification Section 6.High Radiation Area
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
TAC:MC063522 December 2002
ML04005008722 December 2002Memo, Fax Transmission, Draft Request for Additional Information
ML03003045720 December 2002Revised License Amendment Request 01-11, Application for Technical Specification Change Regarding Missed Surveillance and Adoption of a Technical Specifications Bases Control Program Using the Consolidated Line Item Improvement Process.Time of Discovery
Incorporated by reference
Missed surveillance
L-2002-251, Comment by J.A. Stall Regarding Solicitation of Public Comments on Third Year of Implementation of Reactor Oversight Process19 December 2002Comment by J.A. Stall Regarding Solicitation of Public Comments on Third Year of Implementation of Reactor Oversight ProcessSignificance Determination Process
ML02352041010 December 2002NEIL Certificates of Insurance for FPL Energy Seabrook
ML0235200375 December 2002November 2002 Monthly Operating Report for Seabrook Unit 1
IR 05000443/20020122 December 2002IR 05000443-02-012, on 10/22-24/2002; Seabrook Station; Emergency Preparedness Exercise Evaluation
L-2002-237, Comment Submitted by J. A. Stall on Revision of NRC Enforcement Policy (67 Fr 66311, October 31, 2002) 10CFR Part 26, Fitness-for-Duty Programs, Policy Statement Revision2 December 2002Comment Submitted by J. A. Stall on Revision of NRC Enforcement Policy (67 Fr 66311, October 31, 2002) 10CFR Part 26, Fitness-for-Duty Programs, Policy Statement RevisionEnforcement Discretion
ML0234702232 December 2002Response to Request for Corrected Information - Steam Generator Tube
ML0233602312 December 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.Nondestructive Examination
TAC:MB59232 December 2002
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02330004126 November 2002Summary of October 9, 2002, Conference Call with North Atlantic Energy Service Corp Regarding Seabrook Station Steam Generator Tube Lab Examination ResultsNon-Destructive Examination
ML02330043526 November 2002Summary of 11/14/2002 Meeting with FPL Energy Seabrook, LLC (Fple Seabrook) to Discuss the Root Cause Evaluation for Axial Outside Diameter Indications on Steam Generator Tubes
ML02330021026 November 2002Corrected Page 2 of Indemnity Agreements
ML02333044121 November 2002New England Power Company Special Nuclear Committee
ML02324005520 November 2002NRC Ltr Dated 11/20/02 - Senior Reactor and Actor Operator Initial Examinations - Seabrook Station
ML02323049019 November 2002Corrected Page for Facility Operating License and Original Copies of Indemnity Agreements
ML02322040718 November 2002RAI, Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseBoric Acid
VT-2
Pressure Boundary Leakage
ML02326015914 November 2002Meeting Handout, Seabrook Steam Generator Tube Assessment Project
IR 05000443/200201114 November 2002IR 05000443-02-011, on 09/16-10/04/02; Seabrook Station; Biennial Inspection of the Identification and Resolution of ProblemsSignificance Determination Process
Operability Determination
Loctite
ML02324041012 November 2002October 2002 Monthly Operating Report for Seabrook Station
ML0224704148 November 2002Partial Withdrawal of Amendment Request
ML0232405128 November 2002Part 2 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube CrackingFinite Element Analysis
ML0232404898 November 2002Response to Request for Information - Steam Generator Tube
ML0231201167 November 2002IR 05000443-02-005 North Atlantic Energy Service Corporation (FPL Energy Seabrook, LLC as of November 1, 2002); on 06/30-09/28/2002; Seabrook Station, Unit 1. Surveillance Testing and Response to Contingency EventsHigh winds
Past operability
Enforcement Discretion
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Inattentive
ML0302801497 November 2002FEMA - Ltr. Dated Nov. 07, 2002 to Massachusetts Emergency Management Agency, Seabrook
ML0302801617 November 2002FEMA Ltr. Dated Nov. 07, 2002 to State of Nh, Seabrook. Informs of Fema'S Identification of Deficiency Which Occurred During Exercise for Seabrook Nuclear Power Station Conducted on 10/23/2002
ML0231903766 November 2002Order No. 1 That full-part Interventions of the Parties Listed Herein Are Granted and That the non-selling Owners Will Be Recognized as Full Parties Should They Attend a Public Hearing and That the Issues Set Forth Are the Only Matters to B
ML0232404935 November 2002Part 1 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube CrackingNondestructive Examination
Finite Element Analysis
ML0232504501 November 2002Amendment to Indemnity Agreement No. B-106, Amendment 4
ML0230900021 November 2002Meeting with FPL Energy Seabrook Re the Root Cause Evaluation for Axial Outside Diameter Indications Identified on Steam Generator Tubes at Seabrook During the May 2002, Refueling Outage
ML0228404341 November 2002License Amendment 86, Transfer License to FPL Energy Seabrook, LLC (Fple Seabrook)Safe Shutdown
Fire Protection Program
TAC:MB64971 November 2002
ML0231807061 November 2002Revision to Service List
ML02310034831 October 2002Response to Request for Information - Steam Generator Tubes
ML02310026628 October 2002Request for Issuance of Conforming Amendments for License Transfer
Press Release-02-126, NRC Approves Transfer of Operating License for Seabrook to FPL Energy28 October 2002Press Release-02-126: NRC Approves Transfer of Operating License for Seabrook to FPL Energy
ML02310027128 October 2002Revision to Inservice Test Program Relief Request PR-1Temporary Modification
ML02310026728 October 2002Withdrawal of Inservice Test Program Relief Request VG-2Stroke time
ML02232018125 October 2002Order Approving Transfer of License for Seabrook Station, Unit No. 1 from North Atlantic Energy Service Corporation to FPL Energy Seabrook, LLC, and Approving Conforming AmendmentSafe Shutdown
Fire Protection Program
ML02239053225 October 2002Approval of the Transfer of Facility Operating License for Seabrook Station, Unit 1
ML02297001422 October 2002Application for Order and Conforming Amendments for License Transfer - Notice of Closing Date
ML02303000818 October 2002Comment (9) Submitted by North Atlantic Energy Service Corporation, James M. Peschel, on Proposed Rule PR-50 and PR-52 Re Combustile Gas Control in Containment
ML02291047418 October 2002Requalification Program Inspection - Seabrook Station