Requalification Program Inspection - Seabrook Station
ML022910474
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/18/2002
From: Conte R
NRC/RGN-I/DRS/OSB
To: Feigenbaum T, Peschel J
North Atlantic Energy Service Corp
Shared Package
ML022750122 List:
References
Download: ML022910474 (3)


Text

October 18, 2002 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Seabrook Station North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - SEABROOK STATION

Dear Mr. Feigenbaum:

In a telephone conversation on October 17, 2002, Mr. P. Bissett, Senior Operations Examiner/Inspector, and Mr. E. Spader, Supervisor LOR Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Seabrook facility. The inspection is planned for the week of December 1, 2002, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the examination schedule and operating tests scheduled for the week of the inspection to the NRC by November 18, 2002. Mr. Spader has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Mr. Ted C. Feigenbaum Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. P. Bissett at (610) 337-5266.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86 cc w/encl:

B. D. Kenyon, President and Chief Executive Officer J. M. Peschel, Manager - Regulatory Programs G. F. St. Pierre, Station Director - Seabrook Station D. G. Roy, Nuclear Training Manager - Seabrook Station W. J. Quinlan, Esquire, Assistant General Counsel D. Bliss, Director, New Hampshire Office of Emergency Management D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency Management Agency F. W. Getman, Jr., President and Chief Executive Office, BayCorp Holdings, LTD R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts M. Metcalf, Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer, Massachusetts Municipal Wholesale Electric company S. Allen, Polestar Applied Technology, Incorporated R. Shadis, New England Coalition Staff

Mr. Ted C. Feigenbaum Distribution w/encl: (VIA E-MAIL)

Region I Docket Room (with concurrences)

G. Dentel, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA H. Nieh, EDO Coordinator S. Richards, NRR (ridsnrrdlpmlpdi)

D. Starkey, PM, NRR V. Nerses, Backup PM, NRR S. Figueroa, NRR B. McDermott, DRP K. Jenison, DRP W. Lanning, DRS R. Crlenjak, DRS P. Bissett, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

L. Vick, HOHB, NRR DRS Master Exam File DOCUMENT NAME: G:\OSB\Bissett\SeabrookRequalDec02\60DAYRPI.WPD ADAMS PKG: ML022750122 After declaring this document An Official Agency Record it will/ be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker PBissett RConte DATE 10/17/02 10/17/02 10/18/02 10/ /02 10/ /02 OFFICIAL RECORD COPY