ML023240055
| ML023240055 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 11/20/2002 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Warner M North Atlantic Energy Service Corp |
| Shared Package | |
| ML022520009 | List: |
| References | |
| 050443/OL03-301 05000443/2003-301 | |
| Download: ML023240055 (4) | |
Text
November 20, 2002 Mr. Mark E. Warner Site Vice President c/o James M. Peschel Seabrook Station P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS - SEABROOK STATION
Dear Mr. Warner:
In telephone conversations on November 15, 2002, between Mr. John G. Caruso, Senior Examiner/Inspector, and Mr. Kerry Wright, arrangements were made for the administration of licensing examinations at Seabrook Station, during the week of June 2, 2003.
As agreed upon during the telephone conversation, the NRC will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. Since this is an NRC developed examination periodic on-site or Region I reviews will be conducted with your staff during the examination development phase between January and April of 2003. In addition, a formal on-site validation of the proposed examination will be conducted with your staff the week of April 28, 2003.
The reference materials identified in Attachment 2 of ES-201 will be due by January 6, 2003.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
Mr. Mark E. Warner 2
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Wright has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Caruso at (610) 337-5389, or me at (610) 337-5183.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.
50-443 License No.
Mr. Mark E. Warner 3
cc w/encl:
J. A. Stall, FPL Senior Vice President, Nuclear & CNO J. M. Peschel, Manager - Regulatory Programs G. F. St. Pierre, Station Director - Seabrook Station R. S. Kundalkar, FPL Vice President - Nuclear Engineering D. G. Roy, Nuclear Training Manager - Seabrook Station D. Bliss, Director, New Hampshire Office of Emergency Management D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency Management Agency S. McGrail, Director, Massachusetts Emergency Management Agency R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts M. Metcalf, Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer, Massachusetts Municipal Wholesale Electric company R. Shadis, New England Coalition Staff P. Brann, Assistant Attorney General M. S. Ross, Attorney, Florida Power & Light Company Office of the Attorney General Town of Exeter Board of Selectmen
Mr. Mark E. Warner 4
Distribution w/encl: (VIA E-MAIL)
Region I Docket Room (with concurrences)
G. Dentel, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA H. Nieh, EDO Coordinator J. Andersen, NRR D. Starkey, PM, NRR V. Nerses, Backup PM, NRR S. Figueroa, NRR B. McDermott, DRP K. Jenison, DRP J. Caruso, DRS, Chief Examiner C. Buracker, DRS (OL Facility File)
R. Conte, DRS DRS File DOCUMENT NAME: G:\\OSB\\Caruso\\SeabrookExamJune03\\120dayexamltr.wpd ADAMS PKG: ML022520009 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker JCaruso RConte DATE 11/19/02 11/19/02 11/19/02 11/ /02
/11/ /02 OFFICIAL RECORD COPY