IR 05000456/200201031 December 2002IR 05000456-02-010 DRP, on 11/04 - 12/04/2002, Braidwood Station Unit 1. Supplemental Inspection - Mitigation Systems CornerstoneProbabilistic Risk Assessment
Battery sizing
Maintenance Rule Program
ML06096059031 December 2002B/B - UFSAR, Section 11.2, Liquid Waste Management SystemsBoric Acid
Offsite Dose Calculation Manual
RS-02-207, Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-131 December 2002Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1Hot Short
Safe Shutdown
Boric Acid
Fire Barrier
Hydrostatic
Coatings
Emergency Lighting
Fire Protection Program
Fire Watch
Scaffolding
ML03017010226 December 2002Y020020302 - E-mail Dated 12/26/02 from Mike Mulligan Issues About LaSalle and Braidwood Plant'S in Their UFSAR
ML02344030024 December 2002Approval of Proposed Revision 70 of Quality Assurance Topical Report EGC-1A, REV.70 in Accordance with 10 CFR 50.54(a) Requirements for Exelon/Amergen Plants
ML03004000220 December 2002Federal Emergency Management Agency Final Report for the Radiological Emergency Preparedness (REP) Plume Pathway Exercise Conducted on October 9, 2002, for the Braidwood Nuclear Generating StationNuclear Accident Reporting System
ML02330065619 December 2002Summary of Meeting with Excelon Generating Co., to Discuss Uet/Atws Submittal for Byron & Braidwood, Units 1 & 2
ML02361061016 December 2002Transmittal of 10 CFR 50.59 Biennial Report for June 19, 2000 Through June 18, 2002
RS-02-210, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure16 December 2002Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure
ML02360003413 December 2002November 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2
RS-02-173, Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump12 December 2002Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump
ML0234305429 December 2002Summary of Regulatory Performance Public Meeting Re Actions to Address Declining Plant Performance
Press Release-I-02-068, David L. Pelton Assigned as New NRC Senior Resident Inspector at Vermont Yankee4 December 2002Press Release-I-02-068: David L. Pelton Assigned as New NRC Senior Resident Inspector at Vermont YankeeNew Resident Inspector
ML0233807824 December 2002LB Memorandum and Order (Granting Motion to Withdraw Intervention Petition and Dismissing Proceeding)
ML0232202682 December 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.Nondestructive Examination
TAC:MB58742 December 2002
ML06096063730 November 2002November 2005 Log - Liquid Release
Press Release-III-02-063, NRC to Meet with Exelon to Discuss Regulatory Safety Issues at Braidwood27 November 2002Press Release-III-02-063: NRC to Meet with Exelon to Discuss Regulatory Safety Issues at Braidwood
ML02331029427 November 2002Revised Braidwood Meeting Notice with Exelon Generation Co, LLC to Discuss Licensee'S Planned Actions to Address Declining Plant Performance Which Resulted in Entry Into the Degraded Cornerstone Column of the NRC Action Matrix
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02331033427 November 2002Revised - Braidwood Meeting Notice Letter to Licensee. Meeting to Start at 10:30 A.M. at Fossil Ridge Public Library
RS-02-203, Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event26 November 2002Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event
ML02337036925 November 2002GFE Registration Letter - February 2003 ExaminationGeneric Fundamentals Examination
ML02322065920 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degration & Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseBoric Acid
VT-2
Pressure Boundary Leakage
ML02326028714 November 2002October 2002 Monthly Operating Report for Braidwood Units 1 & 2
ML02337068613 November 2002Request for License Amendment for TS Surveillance Requirements for CS Nozzles - Dated 4/19/02Foreign Material Exclusion
ML0233706818 November 2002Request for TS Change - Revision to TS 3.7.1, Main Steam Safety Valves, for Byron/Braidwood Plants
TAC:MB66368 November 2002
ML0230500678 November 2002Units 1 & 2, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B
ML0231103947 November 2002Forthcoming Meeting with Exelon Generation Co., LLC (Exelon), to Discuss Uet/Atws Amendment
ML0230905581 November 2002Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002Generic Fundamentals Examination
IR 05000456/200200722 October 2002IR 05000456-02-007 & IR 05000457-02-007, on 07/01/2002 Through 09/30/2002, Braidwood Station, Units 1 & 2. Fire Protection, Maintenance Effectiveness & Maintenance Risk Assessments & Emergent Work ControlSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Scaffolding
Power change
ML02291022822 October 2002Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues
IR 05000456/200200820 October 2002IR 05000456-02-008(DRS), 05000457-02-008(DRS); Exelon Generation Company, LLC; on 10/07-10/11/2002, Braidwood Station. Emergency Preparedness Specialist Report
RS-02-156, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B18 October 2002Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/BStroke time
RS-02-179, Request for Technical Specification Change Extension of Completion Time for Instrument Bus Inverters16 October 2002Request for Technical Specification Change Extension of Completion Time for Instrument Bus InvertersHigh winds
Anticipated operational occurrence
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
ML02296022815 October 2002Meeting Handout for Exelon/Amergen Licensing Meeting with NRC
ML02301036314 October 2002Pressure & Temperature Limits Reports (Ptlrs), Revision 2, Braidwood Station, Units 1 & 2Hydrostatic
Pressure and Temperature Limits Report
ML02296054114 October 2002September 2002 Monthly Operating Report for Braidwood Station, Units 1 and 2
ML0228208262 October 2002Letter Dated 10/02/02 - Braidwood, Rescheduling of Permanent Plant Modifications & 10 CFR50.59 Inspection
ML0228207892 October 2002Re Scheduling of Initial Licensing Exam Weeks of 7/5 & 7/12/04
ML0227003142 October 2002Meeting with Exelon Generation Company Licensing Activities