October 2, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

RESCHEDULING OF BRAIDWOOD PERMANENT PLANT MODIFICATIONS AND 10 CFR 50.59 INSPECTION TO BE CONDUCTED ALONG WITH THE SAFETY SYSTEM DESIGN AND PERFORMANCE CAPABILITY INSPECTION

Dear Mr. Skolds:

In an effort to improve the efficiency of our baseline inspection process, we have decided at this time, to conduct the Permanent Plant Modifications (Inspection Procedure 71111.17B) and the Changes, Tests, and Experiments (Inspection Procedure 71111.02) inspections during the Safety System Design and Performance Capability Inspection on a pilot basis. Consequently, the Permanent Plant Modification and Changes, Tests, and Experiments inspection scheduled for January 13-17, 2003 will not be performed. This inspection will be conducted along with the Safety System Design and Performance Capability Inspection scheduled for August 29 thru September 12, 2003.

This change has been discussed with your staff. If you have questions regarding the NRC action discussed above, please contact Mr. Zelig Falevits at 847-630-9717 or Mr. David Hills at 630-829-9733.

In accordance with 10 CFR Part 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Zelig Falevits, Acting Branch Chief Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution

Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

RESCHEDULING OF BRAIDWOOD PERMANENT PLANT MODIFICATIONS AND 10 CFR 50.59 INSPECTION TO BE CONDUCTED ALONG WITH THE SAFETY SYSTEM DESIGN AND PERFORMANCE CAPABILITY INSPECTION

Dear Mr. Skolds:

In an effort to improve the efficiency of our baseline inspection process, we have decided at this time, to conduct the Permanent Plant Modifications (Inspection Procedure 71111.17B) and the Changes, Tests, and Experiments (Inspection Procedure 71111.02) inspections during the Safety System Design and Performance Capability Inspection on a pilot basis. Consequently, the Permanent Plant Modification and Changes, Tests, and Experiments inspection scheduled for January 13-17, 2003 will not be performed. This inspection will be conducted along with the Safety System Design and Performance Capability Inspection scheduled for August 29 thru September 12, 2003.

This change has been discussed with your staff. If you have questions regarding the NRC action discussed above, please contact Mr. Zelig Falevits at 847-630-9717 or Mr. David Hills at 630-829-9733.

In accordance with 10 CFR Part 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Zelig Falevits, Acting Branch Chief Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution DOCUMENT NAME: G:\DRS\BRA100202DRS.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME DHills:aa AStone ZFalevits DATE 10/02/02 10/02/02 10/02/02 OFFICIAL RECORD COPY

J. Skolds cc: Site Vice President - Braidwood Braidwood Station Plant Manager Regulatory Assurance Manager - Braidwood Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission

J. Skolds cc: Site Vice President - Braidwood Braidwood Station Plant Manager Regulatory Assurance Manager - Braidwood Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission ADAMS Distribution:

AJM DFT MLC RidsNrrDipmIipb GEG HBC SPR DRPIII DRSIII PLB1 JRK1