ML023610610

From kanterella
Jump to navigation Jump to search
Transmittal of 10 CFR 50.59 Biennial Report for June 19, 2000 Through June 18, 2002
ML023610610
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/16/2002
From: Vonsuskil J
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW020122
Download: ML023610610 (2)


Text

1ý `77--1 f ~ ~ A A' ilk' 'A C~U)

U7) 0 VIP 0E 0L m

17 pya'ý_qp

Exelon Generation Company, LLC wwwexeloncorp corn Exelkns. NuClear Braidwood Station 35100 South Rt 53, Suite 84 10 CFR 50.59(d)(2)

Braceville, IL60407-9619 Tel 815-458-2801 December 16, 2002 BW020122 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

10 CFR 50.59 Biennial Report Pursuant to the requirements of 10 CFR 50.59, "Changes, Tests and Experiments",

paragraph (d)(2), Braidwood Station is providing the required biennial report for Facility Operating License Nos. NPF-72 and NPF-77. This report is being provided for the time period of June 19, 2000 through June 18, 2002, and consists of the descriptions and safety evaluations summaries and/or coversheets for changes to the facility or procedures as described in the Updated Final Safety Analysis Report (UFSAR), and tests or experiments not described in the UFSAR. The coversheet format of evaluations reflects the rule change implemented March 2001.

Please direct any questions regarding this submittal to Ms. Amy Ferko, Regulatory Assurance Manager, at (815) 417-2699.

Respectfully, J eD.von Suskil

.6 Vice President Braidwood Station cc: Regional Administrator - Region III NRC Senior Resident Inspector - Braidwood