Issue date | Title | Topic | |
---|---|---|---|
ML16270A215 | 26 September 2016 | Planned Issuance of License Amendment for Pilgrim: Proposed Changes to the Emergency Plan to Revise Training for the On-Shift Chemistry Technician | |
ML16267A199 | 23 September 2016 | Request That the Press Release, Massachusetts Delegation Calls on NRC to Reject Request to Exempt Pilgrim Nuclear Power Station from Safety Upgrades. | |
ML16273A269 | 23 September 2016 | Revision to Emergency Plan | |
ML16266A536 | 22 September 2016 | Acknowledgement Ltr to Senator E J Markey, Et Al - Pilgrim | Containment Hardened Vent |
ML16266A034 | 22 September 2016 | Email from Donald Barton to Shut Down Pilgrim | |
ML16266A065 | 21 September 2016 | LTR-16-0469 Senator Edward J. Markey Et Al., Letter Request to Reject Entergy'S Efforts to Reduce Safety Requirements at Pilgrim | |
ML16265A529 | 21 September 2016 | Station/Shutdown of Facility/Letter | Fire Watch |
ML16257A573 | 15 September 2016 | Issuance of Relief Request No. PRR-52-Relief from ASME Code, Section XI Requirements for Pressure Testing of Class 1 Pressure Retaining Components as a Result of Repair/Replacement Activity and Use of Code Case N-795 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Through Wall Leak |
ML16258A369 | 14 September 2016 | LTR-16-03761: Region I Reply to J. Cumbler Regarding Concerns About Pilgrim Nuclear Power Plant | |
ML16251A620 | 13 September 2016 | Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) | |
ML16260A397 | 9 September 2016 | Retraction of Licensee Event Report No. 2016-004-00, Salt Service Water Pump B Past Operability- Operation or Condition Prohibited by Technical Specifications | Past operability |
ML16265A608 | 8 September 2016 | Revised 10 CFR 50.54(q) for Emergency Plan Implementing Procedure EP-AD-601, Revision 7 | |
ML16252A357 | 8 September 2016 | EA-16-007 Pilgrim - NRC Investigation Report No. 1-2015-008 | |
ML16251A500 | 7 September 2016 | Watch & Co-Petitioners Request for Hearing Regarding Entergy'S Request for Extension to Comply with NRC Order EA-13-109, Section IV Requirements Regarding Implementation of Phase 1 and Phase 2 Severe Accident Capable Vents... | FLEX Hardened vent |
ML16251A236 | 6 September 2016 | LTR-16-0361-1 Pilgrim: Region I Response to S. Sands Regarding Safety Concerns at Pilgrim | |
ML16251A090 | 6 September 2016 | LTR-16-0358-1 Pilgrim: Region I Response to M. Barocas Regarding Safety Concerns at Pilgrim | |
ML16250A082 | 6 September 2016 | Email from Cape Downwinders Regarding Pilgrim MSIV Failure | |
ML16251A205 | 6 September 2016 | LTR-16-0359-1 Pilgrim: Region I Response to J. Merl Regarding Safety Concerns at Pilgrim | |
ML16251A106 | 6 September 2016 | LTR-16-0362-1 Pilgrim: Region I Response to Y. Barocas Regarding Safety Concerns at Pilgrim | |
ML16251A247 | 6 September 2016 | LTR-16-0360-1 Pilgrim: Region I Response to C. Perry Regarding Safety Concerns at Pilgrim | |
ML16251A081 | 6 September 2016 | LTR-0364-1 Pilgrim: Region I Response to E. Baskin Regarding Safety Concerns at Pilgrim | |
ML16258A004 | 2 September 2016 | Notification of Readiness for Inspection Procedure 95003 Supplemental Inspection | |
IR 05000293/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016005) | |
ML16286A052 | 26 August 2016 | EP-PP-01, Revision 46 Procedure and Associated 50.54(q) Review | Safe Shutdown Fitness for Duty Health Physics Network High winds High Radiation Area Grab sample Offsite Dose Calculation Manual Met Tower Earthquake Power change |
ML16239A048 | 25 August 2016 | Reply to E-mail from Diane Turco Regarding Pilgrim | |
ML16243A472 | 25 August 2016 | Part 21 Reporting of Defects and Noncompliance | |
ML16250A017 | 18 August 2016 | Request for Deferral of Actions Related to Beyond-Design-Basis External Events Seismic Actions- Commitment Changes | Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Exemption Request Backfit |
ML16286A071 | 18 August 2016 | Attachment 1, Revised 10 CFR 50.54(q) Review for EP-AD-601, Emergency Action Level Technical Bases Document, Revision 7 | |
ML16250A018 | 18 August 2016 | Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions - Commitment Changes | Ultimate heat sink FLEX |
IR 05000293/2016002 | 10 August 2016 | Integrated Inspection Report 05000293/2016002, 04/01/2016 - 06/30/2016 | Half scram Offsite Dose Calculation Manual Fire Barrier Enforcement Discretion Emergency Lighting Functionality Assessment Significance Determination Process Operability Determination Power change Downpower Failure to Scram |
ML16222A511 | 9 August 2016 | Email from Diane Turco Regarding Pilgrim | |
ML16221A582 | 8 August 2016 | NRR E-mail Capture - 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479)(CAC No. MF6460) - 60 Day Status | |
ML16194A326 | 4 August 2016 | Issuance of Relief Request No. PRR-53 - Relief from ASME Code, Section XI Requirements for Ultrasonic Inspection Qualifications of Weld Overlays | Weld Overlay Incorporated by reference |
ML16221A002 | 4 August 2016 | NRR E-mail Capture - Pilgrim: Opportunity to Review and Comment on an NRC Information collection- Licensee Event Report Forms (NRC Forms 366, 366A, and 366B, Licensee Event Report) | |
ML16215A086 | 4 August 2016 | Pilgrim Nuclear Power Station - Interim Staff Response To Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request | |
ML16224B014 | 2 August 2016 | Response to Request for Additional Information - Relief Request Number PRR-52, Proposed Alternative to Pressure Testing of Mechanical Joints as a Result of Repair/Replacement Activity and the Use of Code Case N-795. | Packing leak VT-2 Incorporated by reference Pressure Boundary Leakage Pressure boundary leak |
ML16210A428 | 28 July 2016 | Senior Reactor and Reactor Operator Initial License Examinations - Pilgrim Nuclear Power Station | |
ML16208A091 | 26 July 2016 | Email - Pilgrim: Acceptance Review Determination for Relief Request on Volumetric Exam Requirements, PNPS-ISI-001, 002 ,003, 004 & 005 | |
CAC:MF8095 | 26 July 2016 | ||
CAC:MF8093 | 26 July 2016 | ||
ML16210A013 | 26 July 2016 | NRR E-mail Capture - (External_Sender) Probable Maximum Wind Storm for Pilgrim Nuclear Power Station | |
ML16211A067 | 22 July 2016 | Errata Change for Final Safety Analysis Report Revision 30 | Safe Shutdown Fitness for Duty Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Mission time Fire Barrier Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Excess Flow Check Valve Atmospheric Relative Concentration Values Earthquake Control of Heavy Loads Fuel cladding Continuous fire watch Fire Watch Hourly Fire Watch Power Uprate |
ML16230A005 | 22 July 2016 | Information Needs for the Flooding Hazard Reevaluation Report; Storm Surge Analysis | High winds |
ML16228A291 | 22 July 2016 | Submittal of Final Safety Analysis Report Update Revision 30, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes | |
ML17220A185 | 19 July 2016 | Single Positive Test Form Collected on 04/08/2015 | |
ML17220A184 | 19 July 2016 | Single Positive Test Form Collected on 04/17/2015 | |
ML17220A183 | 19 July 2016 | Email on Inconsistencies in 2015 Submission (10 CFR 26.717) - Pilgrim | Fitness for Duty |
CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual | 19 July 2016 | Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual | |
Press Release-I-16-020, New NRC Resident Inspector Assigned to Pilgrim Nuclear Plant | 15 July 2016 | Press Release-I-16-020: New NRC Resident Inspector Assigned to Pilgrim Nuclear Plant | New Resident Inspector |
05000293/LER-2016-003 | 11 July 2016 | Spent Fuel Storage Design Feature Exceeded LER 16-003-00 for Pilgrim Nuclear Power Station Regarding Spent Fuel Storage Design Feature Exceeded | Unanalyzed Condition |