Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16270A21526 September 2016Planned Issuance of License Amendment for Pilgrim: Proposed Changes to the Emergency Plan to Revise Training for the On-Shift Chemistry Technician
ML16267A19923 September 2016Request That the Press Release, Massachusetts Delegation Calls on NRC to Reject Request to Exempt Pilgrim Nuclear Power Station from Safety Upgrades.
ML16273A26923 September 2016Revision to Emergency Plan
ML16266A53622 September 2016Acknowledgement Ltr to Senator E J Markey, Et Al - PilgrimContainment Hardened Vent
ML16266A03422 September 2016Email from Donald Barton to Shut Down Pilgrim
ML16266A06521 September 2016LTR-16-0469 Senator Edward J. Markey Et Al., Letter Request to Reject Entergy'S Efforts to Reduce Safety Requirements at Pilgrim
ML16265A52921 September 2016Station/Shutdown of Facility/LetterFire Watch
ML16257A57315 September 2016Issuance of Relief Request No. PRR-52-Relief from ASME Code, Section XI Requirements for Pressure Testing of Class 1 Pressure Retaining Components as a Result of Repair/Replacement Activity and Use of Code Case N-795Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Through Wall Leak
ML16258A36914 September 2016LTR-16-03761: Region I Reply to J. Cumbler Regarding Concerns About Pilgrim Nuclear Power Plant
ML16251A62013 September 2016Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097)
ML16260A3979 September 2016Retraction of Licensee Event Report No. 2016-004-00, Salt Service Water Pump B Past Operability- Operation or Condition Prohibited by Technical SpecificationsPast operability
ML16265A6088 September 2016Revised 10 CFR 50.54(q) for Emergency Plan Implementing Procedure EP-AD-601, Revision 7
ML16252A3578 September 2016EA-16-007 Pilgrim - NRC Investigation Report No. 1-2015-008
ML16251A5007 September 2016Watch & Co-Petitioners Request for Hearing Regarding Entergy'S Request for Extension to Comply with NRC Order EA-13-109, Section IV Requirements Regarding Implementation of Phase 1 and Phase 2 Severe Accident Capable Vents...FLEX
Hardened vent
ML16251A2366 September 2016LTR-16-0361-1 Pilgrim: Region I Response to S. Sands Regarding Safety Concerns at Pilgrim
ML16251A0906 September 2016LTR-16-0358-1 Pilgrim: Region I Response to M. Barocas Regarding Safety Concerns at Pilgrim
ML16250A0826 September 2016Email from Cape Downwinders Regarding Pilgrim MSIV Failure
ML16251A2056 September 2016LTR-16-0359-1 Pilgrim: Region I Response to J. Merl Regarding Safety Concerns at Pilgrim
ML16251A1066 September 2016LTR-16-0362-1 Pilgrim: Region I Response to Y. Barocas Regarding Safety Concerns at Pilgrim
ML16251A2476 September 2016LTR-16-0360-1 Pilgrim: Region I Response to C. Perry Regarding Safety Concerns at Pilgrim
ML16251A0816 September 2016LTR-0364-1 Pilgrim: Region I Response to E. Baskin Regarding Safety Concerns at Pilgrim
ML16258A0042 September 2016Notification of Readiness for Inspection Procedure 95003 Supplemental Inspection
IR 05000293/201600531 August 2016Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016005)
ML16286A05226 August 2016EP-PP-01, Revision 46 Procedure and Associated 50.54(q) ReviewSafe Shutdown
Fitness for Duty
Health Physics Network
High winds
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Met Tower
Earthquake
Power change
ML16239A04825 August 2016Reply to E-mail from Diane Turco Regarding Pilgrim
ML16243A47225 August 2016Part 21 Reporting of Defects and Noncompliance
ML16250A01718 August 2016Request for Deferral of Actions Related to Beyond-Design-Basis External Events Seismic Actions- Commitment ChangesProbabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Exemption Request
Backfit
ML16286A07118 August 2016Attachment 1, Revised 10 CFR 50.54(q) Review for EP-AD-601, Emergency Action Level Technical Bases Document, Revision 7
ML16250A01818 August 2016Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions - Commitment ChangesUltimate heat sink
FLEX
IR 05000293/201600210 August 2016Integrated Inspection Report 05000293/2016002, 04/01/2016 - 06/30/2016Half scram
Offsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Emergency Lighting
Functionality Assessment
Significance Determination Process
Operability Determination
Power change
Downpower
Failure to Scram
ML16222A5119 August 2016Email from Diane Turco Regarding Pilgrim
ML16221A5828 August 2016NRR E-mail Capture - 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479)(CAC No. MF6460) - 60 Day Status
ML16194A3264 August 2016Issuance of Relief Request No. PRR-53 - Relief from ASME Code, Section XI Requirements for Ultrasonic Inspection Qualifications of Weld OverlaysWeld Overlay
Incorporated by reference
ML16221A0024 August 2016NRR E-mail Capture - Pilgrim: Opportunity to Review and Comment on an NRC Information collection- Licensee Event Report Forms (NRC Forms 366, 366A, and 366B, Licensee Event Report)
ML16215A0864 August 2016Pilgrim Nuclear Power Station - Interim Staff Response To Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request
ML16224B0142 August 2016Response to Request for Additional Information - Relief Request Number PRR-52, Proposed Alternative to Pressure Testing of Mechanical Joints as a Result of Repair/Replacement Activity and the Use of Code Case N-795.Packing leak
VT-2
Incorporated by reference
Pressure Boundary Leakage
Pressure boundary leak
ML16210A42828 July 2016Senior Reactor and Reactor Operator Initial License Examinations - Pilgrim Nuclear Power Station
ML16208A09126 July 2016Email - Pilgrim: Acceptance Review Determination for Relief Request on Volumetric Exam Requirements, PNPS-ISI-001, 002 ,003, 004 & 005
CAC:MF809526 July 2016
CAC:MF809326 July 2016
ML16210A01326 July 2016NRR E-mail Capture - (External_Sender) Probable Maximum Wind Storm for Pilgrim Nuclear Power Station
ML16211A06722 July 2016Errata Change for Final Safety Analysis Report Revision 30Safe Shutdown
Fitness for Duty
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Mission time
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Emergency Lighting
Locked High Radiation Area
Excess Flow Check Valve
Atmospheric Relative Concentration Values
Earthquake
Control of Heavy Loads
Fuel cladding
Continuous fire watch
Fire Watch
Hourly Fire Watch
Power Uprate
ML16230A00522 July 2016Information Needs for the Flooding Hazard Reevaluation Report; Storm Surge AnalysisHigh winds
ML16228A29122 July 2016Submittal of Final Safety Analysis Report Update Revision 30, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes
ML17220A18519 July 2016Single Positive Test Form Collected on 04/08/2015
ML17220A18419 July 2016Single Positive Test Form Collected on 04/17/2015
ML17220A18319 July 2016Email on Inconsistencies in 2015 Submission (10 CFR 26.717) - PilgrimFitness for Duty
CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual19 July 2016Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual
Press Release-I-16-020, New NRC Resident Inspector Assigned to Pilgrim Nuclear Plant15 July 2016Press Release-I-16-020: New NRC Resident Inspector Assigned to Pilgrim Nuclear PlantNew Resident Inspector
05000293/LER-2016-00311 July 2016Spent Fuel Storage Design Feature Exceeded
LER 16-003-00 for Pilgrim Nuclear Power Station Regarding Spent Fuel Storage Design Feature Exceeded
Unanalyzed Condition