ML16228A291

From kanterella
Jump to navigation Jump to search
Submittal of Final Safety Analysis Report Update Revision 30, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes
ML16228A291
Person / Time
Site: Pilgrim
Issue date: 07/22/2016
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Ventkataraman V, DORL/LPLI-I, 415-2934
References
Download: ML16228A291 (2)


Text

~Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 July 22, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Errata: Final Safety Analysis Report Update Revision 30, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35

REFERENCE:

PNPS Letter 2.15.072 Final Safety Analysis Report Update Revision 30, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes, dated November 20, 2015 LETTER NUMBER: 2.16.042

Dear Sir or Madam:

Per the above reference, Pilgrim Nuclear Power Station (PNPS) submitted Final Safety Analysis Report (FSAR) Revision 30 updated pages. That update was submitted in accordance with

.10 Code of Federal Regulations (CFR) 50.71(e) requirements and included changes implemented during Fuel Cycle 20, ending with refueling outage 20.

An errata change to Revision 30 was created due to the identification of erroneous information on several FSAR pages due to the track changes settings. Several pages of the FSAR were found to have deleted information displayed, as a result of track change settings when converting to PDF through PDF-XChange. Information print~d from Microsoft Word to local printers did not contain this information. All affected sections were replaced and correction to the electronic file was made. New CDs were created for the errata and are being re-submitted as required.

If you have any questions or require additional information, please contact me at (508) 830-8323.

There are no regulatory commitments contained in this letter.

Sincerely, (""'" _ _\ \ ~ .

. ~ T~ IC~,.;JJ Everett P. Perkins, Jr. -

Manager, Regulatory Assurance EPP/rb

Entergy Nuclear Operations, Inc. Letter No. 2.16.042 Pilgrim Nuclear Power Station Page 2 of 2 : Errata Filing Instructions for FSAR Revision 30 Change-out pages (5 Pages) : Errata FSAR Revision 30 Change-out pages (See Filing Instructions) cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station