AE -

.-rp ntergx September 2, 20-16 Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 John A. Dent, Jr.

Site Vice President

SUBJECT:

Notification of Readiness for Inspection Procedure 95003 Supplemental Inspection Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.052

REFERENCE:

MID-CYCLE ASSESSMENT LETTER FOR PILGRIM NUCLEAR POWER STATION (REPORT 05000293/2015005), dated September 1, 2015.(Letter 1.15.048)

Dear Mr. Dorman:

This letter serves as notification of Pilgrim Nuclear Power Station's (PNPS) readiness for the U.S. Nuclear Regulatory Commission (NRC) to perform an Inspection Procedure 95003 supplemental inspection (Phase 'C') in response to the Reference letter. The Reference letter states, "The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection."

PNPS's readiness for the inspection was discussed with Mr. Donald Jackson, Inspection Team Leader. PNPS is ready to support the inspections when scheduled by NRC Region I.

If you have any questions or require additional information, please contact the Regulatory Assurance Manager, Mr. Everett Perkins, Jr., at (508) 830-8323.

There are no regulatory commitments contained in this letter.

JAD/pm r

\\

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station cc:

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Arthur L. Burritt, Branch Chief Division of Reactor Projects, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 Mr. Donald E. Jackson, Branch Chief Division of Reactor Safety, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555 NRC Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.16.052 Page 2 of 2