Attachment 1, Revised 10 CFR 50.54(q) Review for EP-AD-601, Emergency Action Level Technical Bases Document, Revision 7
ML16286A071
Person / Time
Site: Pilgrim
Issue date: 08/18/2016
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16286A072 List:
References
2.16.056
Download: ML16286A071 (9)


Text

Attachment 1 Letter Number 2.16.056 Revised 10 CFR 50.54(q) Review for EP-AD-601, Emergency Action Level Technical Bases Document, Revision 7

AEntergy

~-

NUCLEAR MANAGEMENT NON-0UALITY RELATED INFORMATIONAL USE EN-EP-305 PAGE 1OF3 I REV.4 MANUAL Emergency Planning 10CFR50.54(q) Review Program ATTACHMENT 9.2 10 CFR 50.54(Q)(3) SCREENING SHEET1 OF3 Procedure/Document Number: EP-AD-601 I Revision: 7, Revised Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan, EALs, EAL bases, etc. ~ refer to step 3.0[6]):

1. Correct typographical error from "low level" to "low pressure" Page 268
2. Change the set points for the Maximum Normal Operating Value for RWCU Filter Area TE-1291-60A from 105 to 115 degrees Fahrenheit and the Maximum Safe Operating Value from 120 to 130 degrees Fahrenheit per EC 52583. Pages 294,318 Part II. Activity Previously Reviewed? DYES [8'J NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Evaluation is next part Alert and Notification System Design Report? NOT required.

Enter If YES, identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fully bounds the below and complete Part proposed change is documented below: VI.

Justification:

D Bounding document attached (optional)

Part Ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.(Refer to EN-Ll-100)

APPLICABILITY CONCLUSION D If there are no other controlling change processes, continue the 50.54(q)(3) Screening.

l8'l One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify the applicable controlling change processes below.

D One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)

Evaluation is NOT required. Identify controllinq chanqe processes below and complete Part VI.

CONTROLLING CHANGE PROCESSES 10CFR50.54(q), 10CFR50.59{c)(1); 10CFR72.48(c)(1) (See attached PAD)

Part IV. Editorial Change DYES [8'J NO 50.54{q)(3) Continue to next Is this activity an editorial or typographical change such as formatting, paragraph Evaluation is part numbering, spelling, or punctuation that does not change intent? Yes, Item 1 NOT required.

Justification: Item 1 is a typographical change which corrects the term "low level" to Enter justification and "low pressure" when referring to "low pressure pumps". This is an editorial change continue to next which does not change intent, facilities, equipment or processes for this part or procedure or affect any planning standard elements. complete Part Vlas "NO" is checked because the PNPS Emergency Plan revision contains other changes applicable.

that are not editorial.

  • --=-Entergy NUCLEAR MANAGEMENT MANUAL NON*QUALITY RELATED INFORMATIONAL USE Emergency Planning 10CFR50.54{q) Review Program EN-EP-305 I

PAGE 20F3 REV.4 ATTACHMENT 9.2 10 CFR 50.54(Q)(3) SCREENING SHEET2 OF 3 Procedure/Document Number: EP-AD-601 I Revision: 7, Revised Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document Part V._ Eniergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II?

1. Responsibility for emergency response is assigned. [1] D
2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 D staffing) in accordance with the emergency plan. [1]
3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2] D
4. The process for timely augmentation of onshift staff is established and maintained. [2] D
5. Arrangements for requesting and using off site assistance have been made. [3] D
6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] D
7. A standard scheme of emergency classification and action levels is in use. [4] rgi
8. Procedures for notification of State and local governmental agencies are capable of alerting them of D the declared emergency within 15 minutes after declaration of an emergency and providing follow-up notifications. [5]
9. Administrative and physical means have been established for alerting and providing prompt D instructions to the public within the plume exposure pathway. [5]
10. The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and D Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5]
11. Systems are established for prompt communication among principal emergency response D organizations. [6]
12. Systems are established for prompt communication to emergency response personnel. [6] D
13. Emergency preparedness information is made available to the public on a periodic basis within the D plume exposure pathway emergency planning zone (EPZ). [7]
14. Coordinated dissemination of public information during emergencies is established. [7] D
15. Adequate facilities are maintained to support emergency response. [8] D
16. Adequate equipment is maintained to support emergency response. [8] D
17. Methods, systems, and equipment for assessment of radioactive releases are in use. [9] D
18. A range of public PARs is available for implementation during emergencies. [10] D
19. Evacuation time estimates for the population located in the plume exposure pathway EPZ are D available to support the formulation of PARs and have been provided to State and local governmental authorities. [1 OJ
20. A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[1 OJ
  • Entergy NUCLEAR MANAGEMENT NON-QUALITY RELATED EN-EP-305 I REV.4 MANUAL INFORMATIONAL USE PAGE 30F3 Emeraency Plannina 1 OCFR50.54(al Review Proaram ATTACHMENT 9.2 10 CFR 50.54(Q)(3) SCREENING SHEET30F3 Procedure/Document Number: EP-AD-601 Revision: 7, Revised Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document

21. The resources for controlling radiological exposures for emergency workers are established. [11] 0
22. Arrangements are made for medical services for contaminated, injured individuals. [12] 0
23. Plans for recovery and reentry are developed. [13] 0
24. A drill and exercise program (including radiological, medical, health physics and other program 0 areas) is established. [14]
25. Drills, exercises, and training evolutions that provide performance opportunities to develop, 0 maintain, and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]
26. Identified weaknesses are corrected. [14] 0
27. Training is provided to emergency responders. [15) 0
28. Responsibility for emergency plan development and review is established. [16J 0
29. Planners responsible for emergency plan development and maintenance are properly trained. [16] 0 APPLICABILITY CONCLUSION 0 If no Part V criteria are checked, a 50.54(q)(3) Evaluation is NOT required; document the basis for conclusion below and complete Part VI.

x~lf any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation.

BASIS FOR CONCLUSION Emergency planning element 4 in Part V of this form is affected by Item 2 in Part I of this form. A 10CFR50.54(q)(3) evaluation will be performed to determine whether or not the effectiveness of the PNPS Emergency Plan is reduced and prior NRC approval is required.

Part VI. Signatures:

Preparer Name (Print) Date: 8/8/2016 Karen Larson-Sullivan (Optional) Reviewer Name (Print) Date:

Reviewer Name (Print) Date:

O* latl~ MllolitB ' ..~. ~ ) -:--?

<1({L. 'l-/7~ f _J I Letu} ,/ 1-17-/t;;

Nuclear EP Project Manager Approver Name (Print) Date:

Donna Calabrese Manager, Emergency Planning or designee 1)?~'6

A~Entergy NUCLEAR MANAGEMENT NON*QUALITY RELATED INFORMATIONAL USE EN-EP-305 I

PAGE 1OF5 REV.4 MANUAL Emergency Planning 10CFR50.54{q) Review Program ATTACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION Procedure/Document Number: EP-AD-601 j Revision: 7 Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document SHEET1OF5 Part I. Description of Proposed Change:

2. Ch~nge the set points for the Maximum Normal Operating Value for RWCU Filter Area TE-1291-60A from 105 to 115 degrees Fahrenheit and the Maximum Safe Operating Value from 120 to 130
  • degrees Fahrenheit per EC 52583. Pages 294,318 Part II. Description and Review of Licensing Basis Affected by the Proposed Change:

The potentially affected section of the PNPS Emergency Plan includes Section D, Emergency Classification System, Table D-1, Symptoms and Events Requiring Emergency Classification.

EP-AD-270, Equipment Important to Emergency Response, was reviewed. TE-1291-60A is listed under Atta-chment 9.1, Eqt.ilpmenflmportant to Emergency Response and Compensatory Measures, as an asset under Steam Leak Detection & Secondary Containment Temperatures for the RWCU Filter Area, but parameters of the set points of the equipment are not listed so there is no impact by the changes.

PNPS Licensing Correspondence Logs from 1976 through 2006 and the Licensing Basis History were reviewed to determine if any cqmmitments would be affected by the revision of the PNPS EAL Technical Bases. No applicable commitments were found.

These proposed changes were also reviewed in consideration of changes identified within the PNPS Emergency Plan Chronology of changes, which identified no potential impact due to the proposed changes An EN-Ll-100, Process Applicability Determination was performed for EOP-04, Revision 12 and SAG-02, Revision 5, also affected by this change. See attached. The relevant criteria or process identified was the Emergency Plan (1 OCFR50.54(q)/EN-EP-305) review which is addressed by this evaluation. The PAD performed per EN-Ll-100 for these identical changes concluded that the applicable portions of LBDs that were reviewed, including UFSAR Section 7.3.3, (design function of an SSC) and Section 7.3.4.8 (method of performing or controlling a design function of an SSC) are not affected by the changes and did not contain any relevant additional information.

AE

-=- ntergy NUCLEAR MANAGEMENT NON-QUALITY RELATED INFORMATIONAL Use EN-EP-305 PAGE 20F5 I REV.4 MANUAL Emergency Planning 10CFR50.54(q) Review Program ATTACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION Procedure/Document Number: EP-AD-601 I Revision: 7 Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document SHEET20F 5 Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s) Made to the NRC:

10 CFR 50.47(b)(4}-A standard emergency cla~ification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee, and State and local response plans call for reliance on information provided by facility licensees for determinations of minimum initial offsite response measures Site Compliance - A standard emergency classification and action level scheme based on NEI 99-01 Revision 5 remains in effect with this change. The change addresses the elimination of nuisance alarms that may result in the false

  • indication of a steam leak in Secondary Containment in accordance with the existing standard emergency classification and action level scheme.

Previous Commitments to the NRC - PNPS EPlan Chronological Change listing was reviewed with the subject EP-AD-601 changes under review, with no potential impact or relevancy observed. PNPS EP Procedure Listing and the current listing of NRC commitments associated with the PNPS EP-IPs or Emergency Plan changes were reviewed for potential NRC commitment impact as a result of this procedure revision. There were no identified conflicts as a result of this revision.

Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change:

10 CFR 50.47(b)(4)- Emergency Classification System

  • A standard scheme of emergency classification and action levels is in use.

Sections IV.Band IV.C of Appendix E to 10 CFR 50 provide supporting requirements. Informing criteria appear in Section 11.D of NUREG-0654 and the licensee's emergency plan.

a~*Entergy NUCLEAR MANAGEMENT NON*QUALITY RELATED EN-EP-305 I REV.4 MANUAL INFORMATIONAL USE PAGE 3 OF 5 Emergency Planning 10CFR50.54(q) Review Program ATTACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION Procedure/Document Number: EP-AD-601 I Revision: 7 Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document 5HEET30F 5 Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions:

This revision changes the set points for the Maximum Normal Operating Value for RWCU Filter Area TE-1291-60A from 105 to 115 degrees Fahrenheit and the Maximum Safe Operating Value from 120 to 130 degrees Fahrenheit per Engineering Change (EC) 52583. These values appear in EP-AD-601, Emergency Action Level Technical Bases Document, at Table F-2 Secondary Containment Area Temperature and Radiation Maximum Normal Operating Values, and at Table F-3, Secondary Containment Area Temperature and Radiation Maximum Safe Operating Values. These Tables are found within the PNPS Bases Discussion, associated with the following EAL Thresholds for Fission Product Barriers:

Item 14: "Unisolable primary system discharge outside primary containment AND A valid entry condition to EOP-04 exists due to Secondary Containment area radiation or temperature above any Maximum Normal Operating Value (EOP-04, Table H)

Item 20: "Unisolable primary system discharge outside primary containment AND A valid entry condition to EOP-04 exists due to Secondary Containment area radiation or temperature above any Maximum Safe Operating Value (EOP-04, Table L)

As noted, these values also appear in EOP-4, and are being similarly revised in EOP-4 Revision 12.

As EC-52583 describes, TE-1291-60A detects the temperature changes in the RWCU Filter Area and inputs the information to recorder TRU-260-19 on panel C-921 in the Control Room. When the temperature detected *by TE-1291 -60A exceeds the set point programmed in TRU-260-19, an alarm signal is communicated to a common alarm on panel C904L-A6 "STEAM LEAK AREA TEMP HI" in the Control Room. TE-1291-60A is currently programmed/configured in TRU-260-19 for Maximum Normal Operating Value (105 deg. F) and Maximum Safe Operating Values (120 deg. F).

The high temperature alarm detected by TE-1291-60A is intended as an indication of a steam leak in the secondary containment area. However, many condition reports have been written regarding the inadvertent activation of the alarm on this panel, including CR-PNP-2006-2658, CR-PNP-2006-2739, CR-PNP-2006-4670, CR-PNP-2007-2732, CR-PNP-2010-2197,_ and CR-PNP-2014-01731. Troubleshooting and equipment walk-d9wns _were perform_ed, jncll!ding observations on several occasions by Operators who confirmed that the high temperat_ure alarm is not indicative of a steam leak, and that seasonal temperature changes is the main cause in increase in ambient temperature which results to the inadvertent alarms in the control room for TE-1291-60A on C904l-A6. This was further confirmed through observation of local area monitoring instrumentation such as C-61 (Rx Building Ventilation Control Panel) which also revealed no abnormal conditions. EP-AD-601, PNPS Basis under Reactor Coolant System advises that "a high RWCU area temperature may be indicative of increased ambient temperatures due to seasonal changes".

According to EC-52583, the design objective to resolve the problem is to revise the Maximum Normal and Safe Operating Area temperature alarm set points for the RWCU Filter Area, 80ft EL. monitored by TE-1291-60A. This will prevent the potential for inadvertent alarms due to normal seasonal temperature changes.

In further detail, EC-52583 provides the following discussion of the temperature set points to monitor secondary containment integrity using the Maximum Normal Operating Temperature and the Maximum Safe Operating Temperature:

"Maximum Normal Operation Temperature basis is:

The highest value of the identified parameter expected to occur during normal plant operating conditions with all directly associated 1

support and control systems functioning properly. [EPG Appendix BJ

A . NUCLEAR NON-QUALITY RELATED EN-EP-305 I REV.4

~Entergy MANAGEMENT Use MANUAL INFORMATIONAL PAGE 40F5 Emergency Planning 10CFR50.54(q) Review Program ATTACHMENT 9.3 10 CFR 50.54(0)(3) EVALUATION Procedure/Document Number: EP-AD-601 I Revision: 7 Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document SHEET40F5 The Maximum Normal Operating Temperature for this area is referenced in the system safety analysis calculation S&SA-053 sheets 49 and 51 based on FSAR Table 10.9-2 reactor building general area temperature, 6498-HB 'Reactor Building Quadrants & HPCI Room HVAC Mechanical Calculation', E-536

'Environment Qualification of Electrical specification', and PSTG 95-04. Rather than using licensing models, the maximum normal temperature setpoint for TE-1291-60A was based solely on the area temperature value of 105 deg F with no conservatism or basis for the actual value."

"Maximum Safe Operating Temperature (MSOT) basis is:

All values for MSOT are either a value less than the EQ peak temperature for the area, or within the margin for the components within the zone. [Calculation S&SA053 Rev 20 Sheet 52 of 54]

TE129160A is located in EQ Zone 1.13F (Cleanup Powdex Unit). The area is classified as a harsh environment indicating that temperatures can exceed 130 deg F

[Specification &536 section &5. 1]. The peak temperature during a primary break outside of containment (PBOC) is 301 deg F. Cale S&SA053 shows that the high initial temperature is attributed to a break in HPCI piping that runs tl)r:ough the area. Figure C.4. 1-21 in E-536 shows the temperature profile of a PBOC. where the area temperature peaks at 301 deg F and quickly drops to approximately 190 deg F.

Approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the event, the area temperature levels to approximately 145 deg. F."

"The original maximum normal temperature of 105 deg. F was based on the highest expected temperatures in the area. The documented Condition Reports and troubleshooting performed have demonstrated that the maximum normal temperature for the area is approximately 111 deg. F. Therefore, the proposed changed maximum normal temperature of 115 deg F +/- 3 is still above the 111 deg F."

The proposed change to the maximum safe temperature of 130 deg. F +/-3 Deg. Fis well below the peak temperature of 301 deg F and less than the longer term, equalized temperature of approximately 145 deg F."

The proposed set point changes for Maximum Normal Operating Temperatures and the Maximum Safe Operating Temperatures for TE-1291-60A will ensure that the Secondary Containment Control Emergency Procedure Guidelines design basis for secondary containment integrity will continue to be met while eliminating a nuisance alarm in the control room."

These changes recognize the sensitivity of these monitors to fluctuations in ambient temperatures and simply adjust these temperature alarm set points to prevent the potential for inadvertent alarms due to normal seasonal temperature changes. EC-52583 provides a detailed evaluation, design summary, margin analysis and evaluation resolution. These changes to Table F..:2 Secondary Containment Area Temperature and Radiation Maximum Normal Operating Values, and Table F-3, Secondary Containment Area Temperature and Radiation Maximum Safe Operating Values, reflect these revised values and maintain support in the determination of Fission Product Barrier Loss/Potential Loss Matrix and Technical Bases found within EP-AD-601, Emergency Action Level Technical Bases Document. Pilgrim Station maintains an on-going basis for assessing and monitoring radiological conditions at the plant. This refinement in baseline temperatures set points does not change or impact the methods, systems or designated equipment for assessing or monitoring actual or potential offsite consequences of a radiological emergency condition and does not change or impact the Pilgrim emergency classification system.

!A

=Entergy NUCLEAR MANAGEMENT NON-QWU.ITY RELATED EN-EP-305 REV.4 MANUAL INFORMATIONAL Use PAGE 50F 5 ATTACHMENT 9.3 10 CFR 50.54(0)(3) EVALUATION Procedure/Document Number: EP-AD-601 Revision: 7 Equipment/Facility/Other: Pilgrim Nuclear Power Station

Title:

Emergency Action Level Technical Bases Document SHEET 50F5 In addition, the proposed change does not result in a change to the underlying NEI 99-01 Revision 5 scheme for the site-specific EALs. The change addresses the ellminaUon of nuisance alarms that may result in the false indication of a steam leak in Secondary Containment in accordance with the existing standard emergency classification and action level scheme.

The proposed changes to EP-AD-601 continue to meet the planning standards autJJned In 10 CFR 50.47(b)(4). This proposed revision does not require a change to the PNPS Emergency Plan or represent a reduction in the effectiveness to the emergency plan and can be incorporated without prior NRC approval.

Part VI. Evaluation Conclusion Answer the following questions about the proposed change.

I. Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? ~YES0NO

2. Does the proposed change maintain the effectiveness of the emergency plan (i.e.. no

~YES ONO reduction in effectiveness)?

3. Does the proposed change constitute an emergency action level scheme change'.? DYES ~NO If questions 1 or 2 are answered NO, or question 3 answered YES, reject the proposed change, modify the proposed change and perform a new evaluation or obtain prior NRG approval under provisions of 10 CFR 50.90. ff questions 1 and 2 are answered YES, and question 3 answered NO, implement applicable change process( es). Refer to step 5.8[8].

Part VII. Signatures Preparer Name (Print) Date:~

Karen Larson-Sullivan (Optional) Reviewer Name (Print) Date:

Reviewer Name (Print) . Date:

~~- <S,'S,~s '3-l?-!t Nuclear EP Project Manager S-Approver Name (Print)

Donna Calabrese