Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13239A01530 September 2013Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on February 20, 2013, by Bradley F. Maurer of Westinghouse
ML13239A04830 September 2013Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 7, 2013, by James A. Gresham of Westinghouse
ML13239A06130 September 2013Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Bradley F. Maurer of Westinghouse
ML13239A08230 September 2013Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on March 19, 20, 21, 25 & 27, 2013, by Bradley F. Maurer of Westinghouse
ML13239A08930 September 2013Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on July 31 and August 1, 2013, by Hank A. Sepp and James A. Gresham of Westinghouse
L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan30 September 2013Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test PlanNondestructive Examination
Flow Induced Vibration
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
ML13239A10930 September 2013Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on July 16, by James A. Gresham of Westinghouse
ML13274A13326 September 2013NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review Request No. 21 - Relief from Impractical Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii)
ML13277A01023 September 2013Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA)
TAC:MF014416 September 2013
L-MT-13-051, MNGP Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident16 September 2013MNGP Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
High winds
High Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Condition Adverse to Quality
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Earthquake
Scaffolding
L-MT-13-088, Request Commitment Change for Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Nearterm Task Force Review of Insights from the Fukushima Dai-ichi Accident12 September 2013Request Commitment Change for Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Nearterm Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML13256A38712 September 2013NRR E-mail Capture - Record of Conference Call ME3145 Monticello Mellla+ RAI ItemsMELLLA
ML13261A14612 September 2013MNGP Technical Specification Bases Updating InstructionsShutdown Margin
Safety Limit Minimum Critical Power Ratio
Hydrostatic
Cyber Security
B.5.b
Missed surveillance
Scram Discharge Volume
Safeguards Contingency Plan
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants6 September 2013Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
ML13247A4524 September 2013NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review License Amendment Request to Transition to Areva Atrium 10XM Fuel & Areva Safety Analysis MethodologyMELLLA
ML13246A4713 September 2013Ltr 090313 Monticello Request for Waiver - Drm
ML13246A2313 September 20132013 Monticello MOC Letter Combined
ML13248A1153 September 2013Ltr 9/3/13 Monticello Requal Inspection
ML13248A34329 August 2013Monticello Extended Power Uprate: Replacement Steam Dryer -Responses to Clarification Questions and Revised Analysis Documentation
Press Release-III-13-036, NRC Increases Oversight of Monticello for Flooding Protection Violation29 August 2013Press Release-III-13-036: NRC Increases Oversight of Monticello for Flooding Protection Violation
L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 1429 August 2013WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14
ML13248A34829 August 2013WCAP-17549-NP, Revision 2 - Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, Enclosure 13Finite Element Analysis
ML13248A34629 August 2013WCAP-17252-NP, Revision 4 - Acoustic Loads Definition for the Monticello Steam Dyer Replacement Project, Enclosure 12
ML13248A34529 August 2013WCAP-17251-NP, Revision 2 - Monticello Replacement Steam Dryer Four-Line Acoustic Subscale Testing Report, Enclosure 11
ML13248A34429 August 2013WCAP-17548-NP, Revision 2 - Signal Processing Performed on Monticello MSL Strain Gauge and Rsd Instrumentation Data, Enclosure 10
L-MT-13-080, Monticello'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2013Monticello'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
L-MT-13-089, 10 CFR 50.55a Request No. 21: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Lnservice Inspection Interval28 August 201310 CFR 50.55a Request No. 21: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Lnservice Inspection IntervalNondestructive Examination
VT-2
Aging Management
Pressure Boundary Leakage
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13168A37328 August 2013Issuance of Amendment No. 175 to Make Minor Corrections and Editorial Changes, Clarify Fuel Storage Capacity, and Remove Obsolete InformationSafe Shutdown
Shutdown Margin
Cyber Security
Pressure and Temperature Limits Report
Safeguards Contingency Plan
Recently irradiated fuel
Fire Protection Program
Power Uprate
L-MT-13-079, Monticello'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2013Monticello'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Ultimate heat sink
FLEX
IR 05000263/201300928 August 2013EA-13-096, Final Significance Determination of a Yellow Finding with Assessment Followup and Notice of Violation; NRC Inspection Report No. 5000263/2013009 Monticello Nuclear Generating PlantSignificance Determination Process
Job Performance Measure
Open House
Earthquake
IR 05000263/201350328 August 2013IR 05000263-13-503; on 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; Baseline Emergency Preparedness Biennial Exercise InspectionSignificance Determination Process
L-MT-13-090, August 2013, 10 CFR 50.46 Thirty-Day Report27 August 2013August 2013, 10 CFR 50.46 Thirty-Day Report
ML13239A35727 August 2013Revision to Correspondence Service Lists
ML13238A34926 August 2013EN-13-031, Issuance of Final Significance Determination and Notice of Violation, Monticello Nuclear Generating Plant (EA-13-096)Significance Determination Process
Earthquake
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
IR 05000263/201340523 August 2013IR 05000263-13-405, on 07/19/2013, Monticello, NRC Security Baseline InspectionSignificance Determination Process
Affidavit
ML13246A08423 August 2013Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies
L-MT-13-063, Submittal of Revision 0 to the Core Operating Limits Report for Cycle 27 and Revision 0 to Pressure Temperature Limits Report19 August 2013Submittal of Revision 0 to the Core Operating Limits Report for Cycle 27 and Revision 0 to Pressure Temperature Limits ReportHydrostatic
Pressure and Temperature Limits Report
TAC:MF265416 August 2013
ML13233A09616 August 2013MNGP ISFSI Amendment 10 to Technical SpecificationsTornado Missile
Earthquake
Fuel cladding
Liquid penetrant
ML13228A02814 August 2013Operator Examination DataGeneric Fundamentals Examination
L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses14 August 2013Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information ResponsesMELLLA
Time Critical Operator Action
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13221A5719 August 2013Ltr 8/9/13 Monticello MOD 50.59 Request for InformationCommercial Grade Dedication
ML13168A2199 August 2013Issuance of Amendment No. 174 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing ActivitiesAnticipated operational occurrence
Hydrostatic
Power change
ML13220A0076 August 2013Submittal of Quality Assurance Topical Report (NSPM-1), Revision 6Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program