ML13274A133

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review Request No. 21 - Relief from Impractical Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii)
ML13274A133
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/26/2013
From: Beltz T
Plant Licensing Branch III
To: Loeffler R
Northern States Power Co
References
MF2654
Download: ML13274A133 (3)


Text

1 NRR-PMDAPEm Resource From:

Beltz, Terry Sent:

Thursday, September 26, 2013 12:25 PM To:

'Loeffler, Richard A.'

Cc:

Carlson, Robert; Rosenberg, Stacey; Jenkins, Joel; 'Rippy, L. Randal'

Subject:

Monticello Nuclear Generating Plant - Acceptance Review re: Request No. 21 - Relief from Impractical Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) (TAC No. MF2654)

Dear Mr. Loeffler:

By letter dated August 28, 2013 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML13241A236), Northern States Power Company - Minnesota, doing business as Xcel Energy, Inc., submitted Request No. 21 seeking relief from impractical examination coverage requirements pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year lnservice Inspection Interval at the Monticello Nuclear Generating Plant which ended August 31, 2012.

The purpose of this e-mail is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that there appears to be sufficient technical information, both in scope and depth, to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Should you have any questions regarding this review, please contact me at (301) 415-3049.

Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 (301) 415-3049 Terry.Beltz@nrc.gov

Hearing Identifier:

NRR_PMDA Email Number:

856 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D011624982C05)

Subject:

Monticello Nuclear Generating Plant - Acceptance Review re: Request No. 21 -

Relief from Impractical Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) (TAC No. MF2654)

Sent Date:

9/26/2013 12:25:09 PM Received Date:

9/26/2013 12:25:00 PM From:

Beltz, Terry Created By:

Terry.Beltz@nrc.gov Recipients:

"Carlson, Robert" <Robert.Carlson@nrc.gov>

Tracking Status: None "Rosenberg, Stacey" <Stacey.Rosenberg@nrc.gov>

Tracking Status: None "Jenkins, Joel" <Joel.Jenkins@nrc.gov>

Tracking Status: None

"'Rippy, L. Randal'" <Randal.Rippy@xenuclear.com>

Tracking Status: None

"'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com>

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2340 9/26/2013 12:25:00 PM image001.png 10448 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Page 1 of 1 10/1/2013 file://c:\\EMailCapture\\NRR_PMDA\\856\\attch1.png