Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10277012330 September 2010Conformation of Requested Initial Operator License Examinations for Crystal River
IR 05000302/201000728 September 2010IR 05000302-10-007; 5/24/2010 - 9/09/2010; Crystal River Nuclear Plant; Component Design Bases InspectionStroke time
Post Accident Monitoring
Probabilistic Risk Assessment
Finite Element Analysis
Significance Determination Process
Time Critical Operator Action
3F0910-06, Response to Request for Additional Information Regarding Part 26 Exemption Request23 September 2010Response to Request for Additional Information Regarding Part 26 Exemption RequestExemption Request
RA-10-025, Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule Scope23 September 2010Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
ML10287101920 September 2010Engineering Change Package 75219, Rev 0; Reactor Building 28 Undated Delamination Repair - Phase 3 Concrete RemovalSafe Shutdown
Offsite Dose Calculation Manual
Tornado Missile
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Earthquake
Scaffolding
ML10287034620 September 2010Fm 9.3 Exhibit 2, FSAR Site & Environment, Ch 2 Selected PagesEarthquake
ML10287101620 September 2010Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 279 of 364 (636 Pages Information Blocked Out)Non-Destructive Examination
Tornado Missile
Hydrostatic
Coatings
Met Tower
Nondestructive Examination
Finite Element Analysis
Earthquake
Affidavit
ML10287101420 September 2010Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Page 2 of 30. (636 Pages Information Blocked Out)Safe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Finite Element Analysis
Flow Accelerated Corrosion
License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Fire Protection Program
Fire Watch
Scaffolding
ML10287090820 September 2010Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 1 of 2Safe Shutdown
Non-Destructive Examination
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Hydrostatic
Coatings
Met Tower
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Tornado Generated Missile
Foreign Material Exclusion
Earthquake
Control of Heavy Loads
Recently irradiated fuel
Fire Protection Program
Fire Watch
Scaffolding
ML10287090520 September 2010Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 2 of 2Coatings
Commercial Grade
Scaffolding
ML10287080320 September 2010Request #9 NRC SIT, Question # 3 Information
ML10287033920 September 2010Fm 9.1 Exhibit 1 FSAR, Containment System & Other Special Structures, Section 052Tornado Missile
Tornado Generated Missile
Earthquake
Accidental discharge
ML10287033820 September 2010Data Request # 108 - Estimated Vacuum Achievable with Purge Fan, Calculation
ML10287033720 September 2010Data Request # 108 - Estimated Vacuum Achievable with Purge Fan Event
ML10287033620 September 2010Fm 8.3 Exhibit 1, SP-178, Rev 28, Containment Leakage Test-Type a Including Liner Plant
ML10287022320 September 2010FOIA/PA-2010-0116 - Resp 9 - Partial
ML10287021220 September 2010Fm 6.2 Exhibit 2, Crystal River, Unit 3, Design Basis Document, Wire Material
ML10287020820 September 2010Fm 5.6 Exhibit 4 Evaluation and Acceptance of PSC Tendon Surveillance Results
ML10287020120 September 2010Fm 5.3 Exhibit 3 Item #101 - Water Purity During Pressure Washing
ML10287020020 September 20105.3 Exhibit 2 Aci 515.1 R - a Guide to the Use of Waterproofing, Damp-proofing, Protective, and Decorative Barrier Systems for ConcreteBoric Acid
Coatings
ML10287019920 September 2010Fm 5.2 Exhibit 1 Petrographic Studies of Concrete for Construction Engineering Consultants
ML10292006420 September 2010Petrographic Studies of Concrete for Construction Engineering Consultants
ML10292006620 September 2010Drawing 421-350 - EC 603016 Attachment Z10R24
ML10292006820 September 2010Ncr Number 358724, Assignment Number 23, Crystal River, Unit 3 ContainmentMission time
ML10292007020 September 2010SP-178, Revision 30 - Containment Leakage TEST-TYPE a Including Liner PlateTemporary Modification
Emergency Lighting
FLEX
Scaffolding
ML10292007320 September 2010Containment 40 Undated Delamination Investigation Report
ML10292007620 September 2010Licensee Drawing SC-421-036, Title Illegible
ML10292007720 September 2010Licensee Drawing SC-421-032, Title Illegible
ML10292050620 September 2010Adverse Condition Investigation Form, CAP-NGGC-0200-3-18Safe Shutdown
Coatings
Condition Adverse to Quality
ML10292051620 September 2010Photo
ML10287105620 September 2010Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 157 of 364. (636 Pages Information Blocked Out)Earthquake
ML10271067316 September 20102.12 Exhibit 2, Design Analysis Calculation S-00-0047, Revision 0, As-Built Concrete Strength for Class I Structures
ML10259039615 September 2010Summary of Public Meeting - Special Inspection Results Crystal River Nuclear PlantTornado Missile
Finite Element Analysis
ML1033303448 September 2010E-Mail from Gilanshahi to Gilanshahi, Presentation, Crystal River 3Power Uprate
RA-10-019, Request for Exemptions from Physical Security Requirements of 10 CFR Part 73, Physical Protection of Plants and Materials.8 September 2010Request for Exemptions from Physical Security Requirements of 10 CFR Part 73, Physical Protection of Plants and Materials.Exemption Request
3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis8 September 2010CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis
ML1022905773 September 2010G20100514/EDATS: OEDO-2010-0678 - 2.206 - Enforcement Action Against Progress Energy and Crystal River Nuclear Station - Turkey Point Units 3 and 4
ML1024402052 September 2010NRC Special Inspection Team Exit Meeting for Crystal River - September 2, 2010
ML1025810962 September 2010Unit #3 Containment Investigation and RepairTornado Missile
Finite Element Analysis
ML1024407911 September 2010Report 22 - 2010 Mid Cycle - Inspection/Activity Plan (09/01/2010 - 12/31/2011)License Renewal
ML1024407861 September 2010Mid-Cycle Performance Review and Inspection Plan 2010License Renewal
3F0810-10, Response to Request for Additional Information Regarding Part 26 Exemption Request26 August 2010Response to Request for Additional Information Regarding Part 26 Exemption RequestExemption Request
ML10238046826 August 201008/18/10 Summary of Meeting NRC Initial Exam Writer'S WorkshopJob Performance Measure
ML10228029125 August 2010July 15, 2010, Summary of Conference Call with Florida Power Corporation on Nrc'S Preliminary Review of Florida Power Corporation'S 10 CFR 50.59 Evaluation
ML10214052418 August 2010Project Manager ReassignmentPower Uprate
Press Release-II-10-059, NRC Schedules Meeting to Discuss Inspection Results for Crystal River Nuclear Plant Containment18 August 2010Press Release-II-10-059: NRC Schedules Meeting to Discuss Inspection Results for Crystal River Nuclear Plant Containment
ML10223028718 August 2010Memo Approval of Reactor Oversight Program Reduced Sample Size for Crystal River Unit 3 in Calender Year 2010
ML10235045418 August 2010P11 Company Background
ML10209033517 August 2010Summary of June 30, 2010, Meeting with Progress Energy, on Containment Investigation and Repair Activities at Crystal River, Unit 3Finite Element Analysis
ML10223006016 August 2010G20100433/LTR-10-0316/EDATS: SECY-2010-0358 - Response Letter to Scott Portzline, Norm Cohen, and Paul Gunter Regarding Safety Problems at Coastal Nuclear Plants Which Could Be Caused by the Gulf of Mexico Oil Spill