Issue date | Title | Topic | |
---|---|---|---|
ML102770123 | 30 September 2010 | Conformation of Requested Initial Operator License Examinations for Crystal River | |
IR 05000302/2010007 | 28 September 2010 | IR 05000302-10-007; 5/24/2010 - 9/09/2010; Crystal River Nuclear Plant; Component Design Bases Inspection | Stroke time Post Accident Monitoring Probabilistic Risk Assessment Finite Element Analysis Significance Determination Process Time Critical Operator Action |
3F0910-06, Response to Request for Additional Information Regarding Part 26 Exemption Request | 23 September 2010 | Response to Request for Additional Information Regarding Part 26 Exemption Request | Exemption Request |
RA-10-025, Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule Scope | 23 September 2010 | Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102871019 | 20 September 2010 | Engineering Change Package 75219, Rev 0; Reactor Building 28 Undated Delamination Repair - Phase 3 Concrete Removal | Safe Shutdown Offsite Dose Calculation Manual Tornado Missile Safe Shutdown Earthquake Coatings Operating Basis Earthquake Earthquake Scaffolding |
ML102870346 | 20 September 2010 | Fm 9.3 Exhibit 2, FSAR Site & Environment, Ch 2 Selected Pages | Earthquake |
ML102871016 | 20 September 2010 | Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 279 of 364 (636 Pages Information Blocked Out) | Non-Destructive Examination Tornado Missile Hydrostatic Coatings Met Tower Nondestructive Examination Finite Element Analysis Earthquake Affidavit |
ML102871014 | 20 September 2010 | Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Page 2 of 30. (636 Pages Information Blocked Out) | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Coatings Operating Basis Earthquake Finite Element Analysis Flow Accelerated Corrosion License Renewal Earthquake Maintenance Rule Program Control of Heavy Loads Fire Protection Program Fire Watch Scaffolding |
ML102870908 | 20 September 2010 | Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 1 of 2 | Safe Shutdown Non-Destructive Examination Tornado Missile Time to boil Safe Shutdown Earthquake Hydrostatic Coatings Met Tower Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado Generated Missile Foreign Material Exclusion Earthquake Control of Heavy Loads Recently irradiated fuel Fire Protection Program Fire Watch Scaffolding |
ML102870905 | 20 September 2010 | Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 2 of 2 | Coatings Commercial Grade Scaffolding |
ML102870803 | 20 September 2010 | Request #9 NRC SIT, Question # 3 Information | |
ML102870339 | 20 September 2010 | Fm 9.1 Exhibit 1 FSAR, Containment System & Other Special Structures, Section 052 | Tornado Missile Tornado Generated Missile Earthquake Accidental discharge |
ML102870338 | 20 September 2010 | Data Request # 108 - Estimated Vacuum Achievable with Purge Fan, Calculation | |
ML102870337 | 20 September 2010 | Data Request # 108 - Estimated Vacuum Achievable with Purge Fan Event | |
ML102870336 | 20 September 2010 | Fm 8.3 Exhibit 1, SP-178, Rev 28, Containment Leakage Test-Type a Including Liner Plant | |
ML102870223 | 20 September 2010 | FOIA/PA-2010-0116 - Resp 9 - Partial | |
ML102870212 | 20 September 2010 | Fm 6.2 Exhibit 2, Crystal River, Unit 3, Design Basis Document, Wire Material | |
ML102870208 | 20 September 2010 | Fm 5.6 Exhibit 4 Evaluation and Acceptance of PSC Tendon Surveillance Results | |
ML102870201 | 20 September 2010 | Fm 5.3 Exhibit 3 Item #101 - Water Purity During Pressure Washing | |
ML102870200 | 20 September 2010 | 5.3 Exhibit 2 Aci 515.1 R - a Guide to the Use of Waterproofing, Damp-proofing, Protective, and Decorative Barrier Systems for Concrete | Boric Acid Coatings |
ML102870199 | 20 September 2010 | Fm 5.2 Exhibit 1 Petrographic Studies of Concrete for Construction Engineering Consultants | |
ML102920064 | 20 September 2010 | Petrographic Studies of Concrete for Construction Engineering Consultants | |
ML102920066 | 20 September 2010 | Drawing 421-350 - EC 603016 Attachment Z10R24 | |
ML102920068 | 20 September 2010 | Ncr Number 358724, Assignment Number 23, Crystal River, Unit 3 Containment | Mission time |
ML102920070 | 20 September 2010 | SP-178, Revision 30 - Containment Leakage TEST-TYPE a Including Liner Plate | Temporary Modification Emergency Lighting FLEX Scaffolding |
ML102920073 | 20 September 2010 | Containment 40 Undated Delamination Investigation Report | |
ML102920076 | 20 September 2010 | Licensee Drawing SC-421-036, Title Illegible | |
ML102920077 | 20 September 2010 | Licensee Drawing SC-421-032, Title Illegible | |
ML102920506 | 20 September 2010 | Adverse Condition Investigation Form, CAP-NGGC-0200-3-18 | Safe Shutdown Coatings Condition Adverse to Quality |
ML102920516 | 20 September 2010 | Photo | |
ML102871056 | 20 September 2010 | Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 157 of 364. (636 Pages Information Blocked Out) | Earthquake |
ML102710673 | 16 September 2010 | 2.12 Exhibit 2, Design Analysis Calculation S-00-0047, Revision 0, As-Built Concrete Strength for Class I Structures | |
ML102590396 | 15 September 2010 | Summary of Public Meeting - Special Inspection Results Crystal River Nuclear Plant | Tornado Missile Finite Element Analysis |
ML103330344 | 8 September 2010 | E-Mail from Gilanshahi to Gilanshahi, Presentation, Crystal River 3 | Power Uprate |
RA-10-019, Request for Exemptions from Physical Security Requirements of 10 CFR Part 73, Physical Protection of Plants and Materials. | 8 September 2010 | Request for Exemptions from Physical Security Requirements of 10 CFR Part 73, Physical Protection of Plants and Materials. | Exemption Request |
3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis | 8 September 2010 | CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis | |
ML102290577 | 3 September 2010 | G20100514/EDATS: OEDO-2010-0678 - 2.206 - Enforcement Action Against Progress Energy and Crystal River Nuclear Station - Turkey Point Units 3 and 4 | |
ML102440205 | 2 September 2010 | NRC Special Inspection Team Exit Meeting for Crystal River - September 2, 2010 | |
ML102581096 | 2 September 2010 | Unit #3 Containment Investigation and Repair | Tornado Missile Finite Element Analysis |
ML102440791 | 1 September 2010 | Report 22 - 2010 Mid Cycle - Inspection/Activity Plan (09/01/2010 - 12/31/2011) | License Renewal |
ML102440786 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan 2010 | License Renewal |
3F0810-10, Response to Request for Additional Information Regarding Part 26 Exemption Request | 26 August 2010 | Response to Request for Additional Information Regarding Part 26 Exemption Request | Exemption Request |
ML102380468 | 26 August 2010 | 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop | Job Performance Measure |
ML102280291 | 25 August 2010 | July 15, 2010, Summary of Conference Call with Florida Power Corporation on Nrc'S Preliminary Review of Florida Power Corporation'S 10 CFR 50.59 Evaluation | |
ML102140524 | 18 August 2010 | Project Manager Reassignment | Power Uprate |
Press Release-II-10-059, NRC Schedules Meeting to Discuss Inspection Results for Crystal River Nuclear Plant Containment | 18 August 2010 | Press Release-II-10-059: NRC Schedules Meeting to Discuss Inspection Results for Crystal River Nuclear Plant Containment | |
ML102230287 | 18 August 2010 | Memo Approval of Reactor Oversight Program Reduced Sample Size for Crystal River Unit 3 in Calender Year 2010 | |
ML102350454 | 18 August 2010 | P11 Company Background | |
ML102090335 | 17 August 2010 | Summary of June 30, 2010, Meeting with Progress Energy, on Containment Investigation and Repair Activities at Crystal River, Unit 3 | Finite Element Analysis |
ML102230060 | 16 August 2010 | G20100433/LTR-10-0316/EDATS: SECY-2010-0358 - Response Letter to Scott Portzline, Norm Cohen, and Paul Gunter Regarding Safety Problems at Coastal Nuclear Plants Which Could Be Caused by the Gulf of Mexico Oil Spill |