MONTHYEARML1019300572010-06-14014 June 2010 G20100433/LTR-10-0316/EDATS: SECY-2010-0358 - Ltr. Scott Portzline Gulf Oil Spill and Reactor Safety Project stage: Request ML1022300602010-08-16016 August 2010 G20100433/LTR-10-0316/EDATS: SECY-2010-0358 - Response Letter to Scott Portzline, Norm Cohen, and Paul Gunter Regarding Safety Problems at Coastal Nuclear Plants Which Could Be Caused by the Gulf of Mexico Oil Spill Project stage: Other 2010-06-14
[Table View] |
G20100433/LTR-10-0316/EDATS: SECY-2010-0358 - Response Letter to Scott Portzline, Norm Cohen, and Paul Gunter Regarding Safety Problems at Coastal Nuclear Plants Which Could Be Caused by the Gulf of Mexico Oil SpillML102230060 |
Person / Time |
---|
Site: |
Salem, Crystal River |
---|
Issue date: |
08/16/2010 |
---|
From: |
Howe A Division of Operating Reactor Licensing |
---|
To: |
Cohen N, Gunter P, Portzline S Beyond Nuclear, Three Mile Island Alert, UNPLUG Salem Campaign |
---|
Mozafari B, NRR/ADRO/DORL, 415-2020 |
Shared Package |
---|
ML102240695 |
List: |
---|
References |
---|
G20100433, LTR-10-0316, SECY-2010-0358, TAC ME4242 |
Download: ML102230060 (3) |
|
|
---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report 2024-09-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 16, 2010 Mr. Scott Portzline, Security Mr. Paul Gunter, Director, Reactor Consultant to TMI Alert Oversight Project, Beyond Nuclear 3715 N 3rd Street 6930 Carroll Avenue, Suite 400 Harrisburg, PA 17110 Takoma Park, MD 20912 Mr. Norm Cohen, Coordinator UNPLUG Salem Campaign 321 Bar Avenue Linwood, NJ 08221 Gentlemen:
This letter is in response to your letter to the Nuclear Regulatory Commission (NRC) dated June 14, 2010, concerning prevention of safety problems at coastal nuclear plants that could be caused by the Deepwater Horizon oil spill in the Gulf of Mexico (Gulf oil spill). In your June 14, 2010, letter, you sought assurances that the proper federal and state agencies are working in a coordinated and comprehensive effort to prevent safety problems at coastal nuclear plants related to the Gulf oil spill. We understand your inquiry regarding the monitoring of subsurface oil plumes has been addressed in a letter from Captain Kevin C. Kiefer, Staff Director of the U.
S. Coast Guard (USCG), National Incident Command (NIC) to TMI Alert, Attn: Scott Portzline, dated July 21,2010.
The NRC engaged early in the response to the Gulf oil spill. The NRC coordinated, as appropriate, with the NIC and the National Response Team to leverage the resources that these interagency groups provide. The NIC and the National Response Team have coordinated government resources to monitor and predict the impact of the Gulf oil spill and assist other government and private agencies to focus resources accordingly. Among these resources is the Joint Analysis Group, which was established to facilitate cooperation and coordination among the best scientific minds across the government and provide a coordinated analysis of information related to subsea monitoring.
The NRC implemented internal coordination and communication with multiple NRC offices to profile the potential impact of the oil spill on commercial nuclear facilities, both in the Gulf coast region and the east coast of Florida. In addition, under the framework of the NIC and the National Response Team, the NRC monitors all available information on a daily basis to access the potential for impacts on these facilities. This information includes surface oil movement modeling and forecasting provided by the National Oceanic and Atmospheric Administration, situation reports by the USCG and other information provided by our federal partners.
S. Portzline - 2 P. Gunter N. Cohen The NRC coordinated with nuclear sites in the vicinity of the Gulf to ensure awareness and readiness for the potential for oil and "tar balls" to reach any point of the gulf coast shoreline as well as the east coast of Florida. We determined Crystal River or the St. Lucie plants were the only plants that could potentially be impacted. These plants worked closely with federal, state, and local agencies to monitor and track the locations of oil from the spill, as well as predictions for further spread. While the possibility of a negative impact on other plants in the gulf region and further north on the Atlantic Coast was considered to be unlikely, those plants continued to monitor marine conditions and stay aware of any changes that could pose a hazard.
While oil intrusion at commercial nuclear facilities is not expected, the facilities have contingency plans and equipment in place. These contingency plans include utilization of oil booms, half-inch seine nets, early warning devices, and plant shutdown in the case of significant oil or marine life intrusion. The onsite NRC inspectors have verified equipment, procedures and contingency plans are available and are either already deployed, or the means to deploy them quickly are in place. In addition the plants have action plans in place with specific timeframes for implementation of procedures to protect against and mitigate the impact of any intrusion.
The plants have continued to monitor the oil slick closely, tracking its progress, readying response plans, and communicating with the USCG and officials at federal, state and local levels.
Although the leakage from the Deepwater Horizon oil well has stopped, the NRC will continue coordination under the framework of the NIC and the National Response Team to monitor all available information to assess any potential impact on commercial nuclear facilities.
Sincerely, Allen G. Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
S. Portzline -2 P. Gunter N. Cohen The NRC coordinated with nuclear sites in the vicinity of the Gulf to ensure awareness and readiness for the potential for oil and "tar balls" to reach any point of the gulf coast shoreline as well as the east coast of Florida. We determined Crystal River or the S1. Lucie plants were the only plants that could potentially be impacted. These plants worked closely with federal, state, and local agencies to monitor and track the locations of oil from the spill, as well as predictions for further spread. While the possibility of a negative impact on other plants in the gulf region and further north on the Atlantic Coast was considered to be unlikely, those plants continued to monitor marine conditions and stay aware of any changes that could pose a hazard.
While oil intrusion at commercial nuclear facilities is not expected, the facilities have contingency plans and equipment in place. These contingency plans include utilization of oil booms, half-inch seine nets, early warning devices, and plant shutdown in the case of significant oil or marine life intrusion. The onsite NRC inspectors have verified equipment, procedures and contingency plans are available and are either already deployed, or the means to deploy them quickly are in place. In addition the plants have action plans in place with specific timeframes for implementation of procedures to protect against and mitigate the impact of any intrusion.
The plants have continued to monitor the oil slick closely, tracking its progress, readying response plans, and communicating with the USCG and officials at federal, state and local levels.
Although the leakage from the Deepwater Horizon oil well has stopped, the NRC will continue coordination under the framework of the NIC and the National Response Team to monitor all available information to assess any potential impact on commercial nuclear facilities.
Sincerely, IRA!
Allen G. Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Accession Number: Pkg: ML102240695 GT Incoming: ML101930057 Ltr.: ML102230060
- Bye-mail NRR-106 OFFICE LPL2-2/PM LPL2-2/LA NSIRJDPRJIRJCB/SERC NSIRJDPRJIRJOB/BC NAME BMozafari BClavton JKozal* WGott
- 08/16/10 08/16/10 DATE 08/16/10 08/16/10 OFFICE RII/DRP NRRJDORUDD LPL2-2/BC NAME DRich by (JMundy)
- DBroaddus AHowe DATE 08/16/10 08/16/10 08/16/10 OFFICIAL RECORD COPY