Request #9, NRC SIT Question#3 Information

3.

Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?

Response: There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.

Additional information in response to the above question: See License Request No. 24 - NRC SIT Question# 18 folder, under sub-folder: "IWL - Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning. Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.

Breakdown of the "IWL - Tendon Surveillance History" Folder:

6th Surveillance:

File: WR 341602 6th-Surv.pdf:

General Contents:

Pages 1-57, Work Request, general documents, parts lists.

Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)

Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:

General Contents:

Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)

7th Surveillance:

File: WR 368426-1_7th-Surv.pdf:

General Contents:

Pages 1-47, Work Request, general documents, parts lists.

Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)

Pages51-113, PSC Equipment lists and calibration certifications.

Pages 114 - 184, Misc. personnel information and certifications.

File: 7TH TENDON SURVEL TEST REPT.pdf:

General Contents:

Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)

Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.

8th Surveillance:

File: 8TH TENDON SURVEL TEST REPT-Original.pdf:

General Contents:

Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.

Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)

Pages61-463, Final Report App. A - PSC field data sheets.

Pages 464-475, Final Report App. B - Testing Laboratory results.

Pages 476-489, Final Report App. C - PSC Nonconformance reports.

Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.

Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)

Pages 771-End, Final Report App. G - PSC Calibration verification reports.