ML102770123

From kanterella
Jump to navigation Jump to search
Conformation of Requested Initial Operator License Examinations for Crystal River
ML102770123
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/30/2010
From: Chris Miller
Division of Reactor Safety II
To: Franke J
Florida Power Corp
References
Download: ML102770123 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 30, 2010 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR CRYSTAL RIVER NUCLEAR PLANT

Dear Mr. Franke:

In a letter dated August 5, 2010, Serial # 3F08 10-06, your staff responded to Regulatory Issue Summary 2010-08 and requested we schedule initial license operator examinations for Crystal River Nuclear Plant. Based on your letter and following discussions with your staff, we have scheduled the requested examination as follows:

Plant /

Station 2011 2012 Date Applicants Date Applicants Crystal River 9/12 12 9/17 12 On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam from that listed above, please inform us in writing of your request and the reason for the change.

Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examination. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-997-4550.

FPC 2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA: Harold Christensen for/

Christopher G. Miller, Acting Director Division of Reactor Safety Docket Nos.: 50-302 License Nos.: DPR-72 cc: (See page 3)

X SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME PCapehart MWidmann CMiller DATE 09/ 30 /2010 09/ 30 /2010 09/30 /2010 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FPC 3

cc:

R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.

Electronic Mail Distribution James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 (cc contd - See page 4)

FPC 4

(cc contd)

Phyllis Dixon Training Manager Crystal River Nuclear Plant Electronic Mail Distribution

FPC 5

Letter to Jon A. Franke from Christopher G. Miller dated September 30, 2010

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR CRYSTAL RIVER NUCLEAR PLANT Distribution:

RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource ORA, RII C. MIller H. Christensen M. Widmann P. Capehart J. Vincent M. Sykes J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing