Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10274032230 September 2010Confirmation of Requested Initial Operator License Examinations - BrunswickLicense Renewal
ML10278067329 September 2010Cycle 20 Loss-of-Coolant Accident Analysis ReportsAffidavit
BSEP 10-0112, ANP-2943(NP), Revision 0, Brunswick Units 1 and 2, LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel29 September 2010ANP-2943(NP), Revision 0, Brunswick Units 1 and 2, LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM FuelStroke time
Fuel cladding
Exclusive Use
Affidavit
ML10278067929 September 2010ANP-2941(NP), Revision 0, Brunswick, Units 1 and 2, LOCA Break Spectrum Analysis for Atrium 10XM FuelStroke time
Fuel cladding
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
RA-10-025, Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule Scope23 September 2010Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
BSEP 10-0107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors13 September 2010Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
BSEP 10-0105, Request for License Amendment - Technical Specification 5.3.1, Facility Staff Qualifications.13 September 2010Request for License Amendment - Technical Specification 5.3.1, Facility Staff Qualifications.
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024405811 September 2010Report 22 - 2010 Mid-Cycle Inspection/Activity Plan
ML1024405761 September 2010Mid-Cycle Performance Review & Inspection Plan 2010License Renewal
ML10238046826 August 201008/18/10 Summary of Meeting NRC Initial Exam Writer'S WorkshopJob Performance Measure
BSEP 10-0104, Submittal of Correspondence Distribution List Update25 August 2010Submittal of Correspondence Distribution List Update
BSEP 10-0100, Updated FSAR, Revision 2219 August 2010Updated FSAR, Revision 22Incorporated by reference
ML10245060119 August 2010Updated Final Safety Analysis Report, Revision 22, and Changes to Quality Assurance Program DescriptionSafe Shutdown
Incorporated by reference
Fire Protection Program
BSEP 10-0097, Report of 10 CFR 50.59 Evaluations and Commitment Changes18 August 2010Report of 10 CFR 50.59 Evaluations and Commitment ChangesShutdown Margin
Temporary Modification
TAC:ME434318 August 2010
ML10235050418 August 2010Acceptance Review of Brunswick'S Third ISI Interval Relief Request
ML10214052418 August 2010Project Manager ReassignmentPower Uprate
BSEP 10-0098, Response to Request for Additional Information Regarding Request for Alternative Nozzle-to-Vessel Shell Weld and Inner Radius Section Examinations17 August 2010Response to Request for Additional Information Regarding Request for Alternative Nozzle-to-Vessel Shell Weld and Inner Radius Section Examinations
ML10214042016 August 2010Project Manager Reassignment
RA-10-015, Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installations Security Program, Revision 111 August 2010Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installations Security Program, Revision 1Safeguards Contingency Plan
IR 05000324/20104039 August 2010NRC Security Inspection Report 05000325-10-403 and 05000324-10-403Affidavit
ML1021505352 August 2010Notification of Brunswick Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report IR 05000325-10-008 and 05000324-10-008Time Critical Operator Action
License Renewal
ML10214038730 July 2010Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010Safe Shutdown
Boric Acid
Anticipated operational occurrence
Cyber Security
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
Backfit
BSEP 10-0093, ANP-2936(NP), Revision 0, Brunswick, Unit 2, Thermal-Hydraulic Design Report for Atrium Tm 10XM Fuel Assemblies.30 July 2010ANP-2936(NP), Revision 0, Brunswick, Unit 2, Thermal-Hydraulic Design Report for Atrium Tm 10XM Fuel Assemblies.Anticipated operational occurrence
Water rod
BSEP 10-0092, Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing Examinations29 July 2010Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML10216037429 July 2010Cycle 20 Thermal-Hydraulic Design ReportAffidavit
IR 05000324/201000327 July 2010IR 05000325-10-003 & 05000324-10-003 on 04/01/10 - 06/30/10 for Brunswick, Units 1 & 2Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Annual Radiological Environmental Operating Report
Large early release frequency
Earthquake
Fire Protection Program
Operability Assessment
TAC:ME434423 July 2010
BSEP 10-0091, Inservice Inspection Program Owner'S Activity Report, Refueling Outage 1723 July 2010Inservice Inspection Program Owner'S Activity Report, Refueling Outage 17
BSEP 10-0043, Proposed Alternatives for the Third 10-Year Inservice Inspection Program23 July 2010Proposed Alternatives for the Third 10-Year Inservice Inspection ProgramNondestructive Examination
VT-2
Incorporated by reference
ML10203023222 July 2010Notification of Licensed Operator Initial Exam 05000325/2010302 and 05000324/2010302License Renewal
BSEP 10-0083, Additional Information Supporting Requests for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report22 July 2010Additional Information Supporting Requests for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits ReportAnticipated operational occurrence
Fuel cladding
BSEP 10-0089, Post-Outage Supplemental Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems22 July 2010Post-Outage Supplemental Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems
TAC:ME355422 July 2010
BSEP 10-0088, Independent Spent Fuel Storage Installation (Isfsi), Revision to Plant Security Event Procedure22 July 2010Independent Spent Fuel Storage Installation (Isfsi), Revision to Plant Security Event Procedure
ML10203047620 July 2010Topographic Survey Stabilization Pond Area 185 Acres, 1 Through 7
ML10203046220 July 2010Groundwater Protection Status
ML10194052316 July 2010Nuclear Generating Plant; H. B. Robinson Steam Electric Plant, Unit No. 2; and Shearon Harris Nuclear Power Plant, Unit No. 1 - Withdrawal of an Amendment Request for Approval Of..Cyber Security
Cyber attack
ML10200037914 July 2010PlantOpen House
Exit Sign
ML11126A22313 July 2010Offsite Dose Calculation Manual, Revision 34, Enclosure 2 to BSEP 11-0045Time of Discovery
Loop seal
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML10203028813 July 2010Photograph - Brunswick Graphics and Sample Results
TAC:ME42258 July 2010
RA-10-011, Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan8 July 2010Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security PlanSafe Shutdown
Cyber Security
Incorporated by reference
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
Power Uprate
Cyber attack
BSEP 10-0075, Independent Spent Fuel Storage Installation - Final Response to Order EA-08-202, Implementation of Additional Security Measures and Fingerprinting for Unescorted Access7 July 2010Independent Spent Fuel Storage Installation - Final Response to Order EA-08-202, Implementation of Additional Security Measures and Fingerprinting for Unescorted AccessSafeguards Contingency Plan
ML1018807057 July 2010Regulatory Commission Office of Investigations Report No. 2-2009-031Inattentive
ML1018907391 July 2010Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm