MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] |
Text
jProgress Energy Michael J. Annacone Vice President Brunswick Nuclear Plant August 19, 2010 10 CFR 50.4 10 CFR 50.71(e)10 CFR 50.54(a)(3)-SERIAL: BSEP 10-0100 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Reference:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Updated Final Safety Analysis Report, Revision 22, and Changes to Quality Assurance Program Description Letter from Benjamin C. Waldrep (CP&L) to NRC Document Control Desk, "Updated Final Safety Analysis Report, Revision 21, and Changes to Quality Assurance Program Description," dated August 20, 2008, Serial: BSEP 08-0107 Ladies and Gentlemen:
In accordance with 10 CFR 50.71(e), Carolina Power & Light company (CP&L), now doing business as Progress EnergyCarolinas, Inc., is submitting Revision 22 to the Updated Final Safety Analysis Report (UFSAR) for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2. Pages of the UFSAR that have been revised since the last revision have been designated as "Revision 22." Revision 22 incorporates applicable changes made to the facility during the period from April 30, 2008, through April 29, 2010 (i.e., completion of the last Unit 1 refueling outage). This UFSAR revision also includes some changes that have been approved and incorporated since April 29, 2010. The previous revision of the UFSAR was submitted by letter dated August 20, 2008 (i.e., Serial: BSEP 08-0107).This revision of the UFSAR is being submitted electronically and is contained on the CD-ROM provided in Enclosure
- 1. The CD-ROM has been prepared using the NRC's document titled Guidance for Electronic Submissions to the Commission.
The CD-ROM contains the entire Brunswick UFSAR in Adobe Acrobat text-searchable Portable Document Format (PDF). As requested by the NRC's electronic submissions guidance, Enclosure 2 provides a listing of the electronic files that make up this UFSAR submission, including the file name, file size, and sensitivity level.Progress Energy Carolinas, Inc.PO. Box 10429 Southport, NC 28461 T > 910.457.3698 4cs3 GQ004-Document Control Desk BSEP 10-0100 / Page 2 The UFSAR, Revision 22, can be accessed on the CD-ROM by opening the file named"UFSAR.pdf' in the main directory.
This PDF file contains Adobe Acrobat bookmarks which link to other files that are also part of the UFSAR (i.e., the UFSAR figures and other documents that are incorporated by reference into the UFSAR). These bookmarks will only function if the UFSAR files are maintained in the directory structures established on the CD-ROM. Documents that are incorporated by reference into the UFSAR are identified in Section 1.6 of the UFSAR, and are also included on the CD-ROM. These documents include: (1) the Unit 1 and Unit 2 Technical Requirements Manuals, (2) the Safe Shutdown Analysis Report (i.e., Nuclear Generation Group Calculation BNP-E-9.004), (3) the Fire Protection Program Commitment Document, which is contained in plant procedure 0PLP-0 1.1, Fire Protection Commitment Document, and (4) various plant drawings that are identified in UFSAR Table 1-7 as being incorporated by reference.
The CD-ROM contains information that has been deemed sensitive to BSEP's physical protection.
Therefore, CP&L requests that the files on the CD-ROM be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1).
10 CFR 50.54(a)(3) specifies that the changes to the quality assurance program description that do not reduce commitments be submitted to the NRC in accordance with the reporting requirements of 10 CFR 50.71 (e). The quality assurance program description is contained in UFSAR Section 17.3, BNP Quality Assurance Program Description; Section 13.1, Organizational Structure of Applicant; and Table 1-6, Conformance to NRC Regulatory Guides. Revision 22 of the UFSAR includes those changes to the quality assurance program description that do not reduce commitments and that have been processed since CP&L's submittal of the UFSAR, Revision 21.No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Ms. Annette Pope, Supervisor
-Licensing/Regulatory Programs, at (910) 457-2184.I declare, under penalty of perjury, that the foregoing is true and correct. Executed on August 19, 2010.J. Annacone Document Control Desk BSEP 10-0100 / Page 3 WRM/wrm Enclosure(s):
- 1. One (1) CD-ROM labeled Brunswick Updated FSAR, Revision 22 (Sensitive Non-Publicly Available Information, Withhold in Accordance With 10 CFR 2.390)2. Listing of Updated FSAR, Revision 22, CD-ROM Files cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission (Electronic Copy Only)ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A)11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 cc (without enclosures):
Chair -North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-05 10