Report 22 - 2010 Mid-Cycle Inspection/Activity Plan
ML102440581
Person / Time
Site: Brunswick, 07200006  Duke Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Carolina Power & Light Co
Shared Package
ML102440569 List:
References
Download: ML102440581 (2)


Text

Page 1 of 2 Brunswick 09/01/2010 08:07:37 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SIT - BRUNSWICK SPECIAL INSPECTION - EP 2 1, 2 06/09/2010 09/17/2010 IP 93812 Special Inspection PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 4 1, 2 08/30/2010 09/03/2010 IP 7111401 Exercise Evaluation 1, 2 08/30/2010 09/03/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/30/2010 09/03/2010 IP 71151 Performance Indicator Verification ISFSI - ISFSI WELDING DEMO & DRY RUN 5 1, 2 09/20/2010 09/24/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 09/20/2010 09/24/2010 IP 7111121 Component Design Bases Inspection 1, 2 10/04/2010 10/08/2010 IP 7111121 Component Design Bases Inspection 1, 2 10/18/2010 10/22/2010 IP 7111121 Component Design Bases Inspection 1, 2 11/01/2010 11/05/2010 IP 7111121 Component Design Bases Inspection ISFSI - ISFSI FIRST CAMPAIGN 3 1, 2 10/04/2010 10/08/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - INITIAL EXAM PREP 5 1 11/15/2010 11/19/2010 V23342 BRUNSWICK/DECEMBER 2010 EXAM AT POWER FACILITIES TI-177 - TI-177 GAS ACCUMULATION 3 1 11/29/2010 12/03/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL RQ - REQUAL INSPECTION 4 1, 2 11/29/2010 12/03/2010 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL EXAM WEEK 1 4 1 12/06/2010 12/10/2010 V23342 BRUNSWICK/DECEMBER 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 4 1 12/13/2010 12/17/2010 V23342 BRUNSWICK/DECEMBER 2010 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL WEEK 1 3 1, 2 03/07/2011 03/11/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/07/2011 03/11/2011 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/07/2011 03/11/2011 IP 71124.04 Occupational Dose Assessment 1, 2 03/07/2011 03/11/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/07/2011 03/11/2011 IP 71151 Performance Indicator Verification PSB1-TI - TI-179 NSTS VERIFICATION 2 1, 2 03/07/2011 03/11/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1, 2 03/21/2011 03/25/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Brunswick 09/01/2010 08:07:37 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 03/14/2011 03/18/2011 IP 7111108G Inservice Inspection Activities - BWR PSB1-RP - RP OCCUPATIONAL WEEK 2 2 1, 2 03/21/2011 03/25/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/21/2011 03/25/2011 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/21/2011 03/25/2011 IP 71124.04 Occupational Dose Assessment 1, 2 03/21/2011 03/25/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/21/2011 03/25/2011 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 8 1, 2 05/09/2011 05/13/2011 IP 71152B Identification and Resolution of Problems 1, 2 05/23/2011 05/27/2011 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 06/27/2011 07/01/2011 IP 7111402 Alert and Notification System Testing 1, 2 06/27/2011 07/01/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/27/2011 07/01/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/27/2011 07/01/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/27/2011 07/01/2011 IP 71151 Performance Indicator Verification MODS - MODS/50.59 INSPECTION 5 1, 2 07/18/2011 07/22/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 08/01/2011 08/05/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 7 1, 2 10/31/2011 11/04/2011 IP 7111105T Fire Protection [Triennial]

1, 2 11/14/2011 11/18/2011 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure