ML102440576
| ML102440576 | |
| Person / Time | |
|---|---|
| Site: | Brunswick, 07200006 |
| Issue date: | 09/01/2010 |
| From: | Randy Musser NRC/RGN-II/DRP/RPB4 |
| To: | Annacone M Carolina Power & Light Co |
| Shared Package | |
| ML102440569 | List: |
| References | |
| Download: ML102440576 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 1, 2010 Carolina Power and Light Company ATTN: Mr. Michael J. Annacone Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 AND UNIT 2
Dear Mr. Annacone:
On August 11, 2010, the NRC staff completed its performance review of the Brunswick Steam Electric Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and the enclosed inspection plan do not include security information.
A separate letter designated and marked as Official Use Only-Security Related Information will include the security cornerstone performance review and a resultant inspection plan.
Plant performance for the most recent quarter at Brunswick Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition to ROP baseline inspection activities, we also plan on conducting several infrequently performed inspections, which include Temporary Instruction (TI) 2515/177, Managing Gads Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray System; Independent Spent Fuel Storage Installation (ISFSI); TI 2515/179, Verification of Licensee Responses to NRC Requirements for Inventories for Materials Tracked in NSTS; and initial operator licensing examinations.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
CP&L 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.
Please contact me at 404-997-4603 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-325, 50-324 and 72-06 License Nos.: DPR-71 and DPR-62
Enclosure:
Brunswick Inspection/Activity Plan (09/01/2010 - 12/31/2011) cc w/encl: (See page 3)
____PKG: ML102440569________
X SUNSI REVIEW COMPLETE RAM 09/01/2010 OFFICE RII:DRP RII:DRP SIGNATURE JGW1 RAM NAME JWorosilo RMusser DATE 09/01/2010 09/01/2010 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
CP&L 3
cc w/encl:
R. J. Duncan, II, Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Director Site Operations Brunswick Steam Electric Plant Electronic Mail Distribution Edward L. Wills, Jr.
Plant General Manager Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution Christos Kamilaris, Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.
Electronic Mail Distribution Phyllis N. Mentel Manager, Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution Michael S. Williams, Manager, Training Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution (Vacant)
Manager License Renewal Progress Energy Electronic Mail Distribution Annette H. Pope Supervisor, Licensing/Regulatory Programs Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant 8470 River Road, SE Southport, NC 28461 John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602 Chairman North Carolina Utilities Commission Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Brunswick County Board of Commissioners P.O. Box 249 Bolivia, NC 28422 James Ross Nuclear Energy Institute Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 cc w/encl. (see next page)
CP&L 4
cc w/encl. (continued)
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403
CP&L 5
Letter to Michael J. Annacone from Randall A. Musser dated September 1, 2010
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 AND UNIT 2 Distribution w/encl:
C. Evans, RII EICS OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMBrunswick Resource ROP Reports Institute of Nuclear Power Operations (INPO)